How do they match: Terrazzo Workers and Finishers

  • Build wooden molds, clamping molds around areas to be repaired, or setting up frames to the proper depth and alignment.
  • Clean chipped area, using wire brush, and feel and observe surface to determine if it is rough or uneven.
  • Clean installation site, mixing and storage areas, tools, machines, and equipment, and store materials and equipment.
  • Grind curved surfaces or areas inaccessible to surfacing machine, such as stairways or cabinet tops, with portable hand grinder.
  • Move terrazzo installation materials, tools, machines, or work devices to work areas, manually or using wheelbarrow.
  • Repair concrete by cutting out damaged areas, drilling holes for reinforcing rods, and positioning reinforcing rods, using power saw and drill.

  • Pour materials into or on designated areas.