How do they match: Terrazzo Workers and Finishers

  • Clean installation site, mixing and storage areas, tools, machines, and equipment, and store materials and equipment.
  • Fill slight grinding depressions with matching grout material and hand-trowel for a smooth, uniform surface.
  • Modify mixing, grouting, grinding, or cleaning procedures, according to type of installation or material used.
  • Move terrazzo installation materials, tools, machines, or work devices to work areas, manually or using wheelbarrow.
  • Position and secure moisture membrane and wire mesh in preparation for pouring base materials for terrazzo installation.

  • Align masonry materials.
  • Apply material to fill gaps in surfaces.
  • Drill holes in construction materials.
  • Install masonry materials.
  • Install roofing materials.
  • Load materials into construction equipment.
  • Measure materials or objects for installation or assembly.
  • Move construction or extraction materials to locations where they are needed.
  • Pour materials into or on designated areas.
  • Smooth surfaces with abrasive materials or tools.