How do they match: Terrazzo Workers and Finishers

  • Cut metal division strips and press them into the terrazzo base for joints or changes of color to form designs or patterns or to help prevent cracks.
  • Measure designated amounts of ingredients for terrazzo or grout, according to standard formulas and specifications, using graduated containers and scales, and load ingredients into portable mixer.
  • Move terrazzo installation materials, tools, machines, or work devices to work areas, manually or using wheelbarrow.

  • Pour materials into or on designated areas.