How do they match: Segmental Pavers

  • Cutter

  • Lay out, cut, and place segmental paving units. Includes installers of bedding and restraining materials for the paving units.

  • Cut paving stones to size and for edges, using a splitter and a masonry saw.
  • Prepare base for installation by removing unstable or unsuitable materials, compacting and grading the soil, draining or stabilizing weak or saturated soils and taking measures to prevent water penetration and migration of bedding sand.
  • Resurface an outside area with cobblestones, terracotta tiles, concrete or other materials.
  • Supply and place base materials, edge restraints, bedding sand and jointing sand.

  • Cut tile, stone, or other masonry materials.
  • Align masonry materials.
  • Compact materials to create level bases.
  • Install masonry materials.
  • Mark reference points on construction materials.
  • Move construction or extraction materials to locations where they are needed.
  • Spread sand, dirt or other loose materials onto surfaces.