How do they match: Geothermal Technicians

  • Geothermal Heating, Ventilating, and Air Conditioning Technician
  • I and C Technician
  • I and E Technician
  • I C and E Technician
  • Instrument and Controls Technician
  • Instrumentation and Electrical Technician
  • Instrumentation, Control, and Electrical Technician
  • O and M Technician
  • Operations and Maintenance Technician

  • Prepare and maintain logs, reports, or other documentation of work performed.
  • Prepare newly installed geothermal heat systems for operation by flushing, purging, or other actions.
  • Adjust power production systems to meet load and distribution demands.
  • Perform pre- and post-installation pressure, flow, and related tests of vertical and horizontal geothermal loop piping.
  • Test water sources for factors, such as flow volume and contaminant presence.