How do they match: Tile and Stone Setters

  • Prepare cost and labor estimates, based on calculations of time and materials needed for project.
  • Prepare surfaces for tiling by attaching lath or waterproof paper, or by applying a cement mortar coat to a metal screen.
  • Apply mortar to tile back, position the tile, and press or tap with trowel handle to affix tile to base.
  • Cut, surface, polish, and install marble and granite or install pre-cast terrazzo, granite or marble units.

  • Clean surfaces in preparation for work activities.