How do they match: Tapers

  • Spread and smooth cementing material over tape, using trowels or floating machines to blend joints with wall surfaces.

  • Apply material to fill gaps in surfaces.
  • Apply adhesives to construction materials.
  • Drill holes in construction materials.
  • Evaluate quality of materials or products.
  • Remove excess materials from finished construction projects.
  • Select construction materials.
  • Smooth surfaces with abrasive materials or tools.