Job Duties Custom List 47-2041.00 — Carpet Installers
- Cut and trim carpet to fit along wall edges, openings, and projections, finishing the edges with a wall trimmer.
Occupations with related tasks Save Table: XLSX CSV
Closely Related Tasks | All Related Tasks | Job Zone | Code | Occupation |
3 | 4 | 2 | 47-3012.00 | Helpers--Carpenters |
3 | 4 | 2 | 47-2053.00 | Terrazzo Workers and Finishers |
3 | 3 | 2 | 47-2141.00 | Painters, Construction and Maintenance |
2 | 8 | 2 | 47-2121.00 | Glaziers |
2 | 4 | 2 | 47-2142.00 | Paperhangers |
2 | 4 | 2 | 47-2044.00 | Tile and Stone Setters
|
2 | 3 | 2 | 47-2042.00 | Floor Layers, Except Carpet, Wood, and Hard Tiles
|
2 | 3 | 3 | 47-2022.00 | Stonemasons |
2 | 3 | 1 | 47-2051.00 | Cement Masons and Concrete Finishers |
2 | 2 | 1 | 47-2043.00 | Floor Sanders and Finishers |
2 | 2 | 2 | 47-2082.00 | Tapers |
2 | 2 | 2 | 47-2181.00 | Roofers |
1 | 5 | 2 | 51-9197.00 | Tire Builders
|
1 | 3 | 2 | 47-4061.00 | Rail-Track Laying and Maintenance Equipment Operators |
1 | 1 | 2 | 47-2131.00 | Insulation Workers, Floor, Ceiling, and Wall |
1 | 1 | 1 | 47-3014.00 | Helpers--Painters, Paperhangers, Plasterers, and Stucco Masons |
1 | 1 | 2 | 47-2132.00 | Insulation Workers, Mechanical |
1 | 1 | 3 | 47-2152.04 | Solar Thermal Installers and Technicians |
1 | 1 | 2 | 47-2211.00 | Sheet Metal Workers |
1 | 1 | 2 | 47-5032.00 | Explosives Workers, Ordnance Handling Experts, and Blasters |
1 | 1 | 2 | 47-2061.00 | Construction Laborers
|
- Smooth or sand surfaces to remove ridges, tool marks, glue, or caulking.
- Cut and install insulating or sound-absorbing material.
- Cut tile or linoleum to fit and spread adhesives on flooring for installation.
- Cut timbers, lumber, or paneling to specified dimensions.
- Clean work areas, machines, or equipment, to maintain a clean and safe job site.
- Fasten timbers or lumber with glue, screws, pegs, or nails and install hardware.
- Perform tie spacing layout and measure, mark, drill or cut.
- Select tools, equipment, or materials from storage and transport items to work site.
- Drill holes in timbers or lumber.
- Position and hold timbers, lumber, or paneling in place for fastening or cutting.
- Align, straighten, plumb, or square forms for installation.
- Hold plumb bobs, sighting rods, or other equipment to aid in establishing reference points and lines.
- Erect scaffolding, shoring, or braces.
- Construct forms and assist in raising them to the required elevation.
- Install handrails under the direction of a carpenter.
- Glue and clamp edges or joints of assembled parts.
- Secure stakes to grids for constructions of footings, nail scabs to footing forms, and vibrate and float concrete.
- Cover surfaces with laminated plastic covering material.
- Smooth or sand surfaces to remove ridges, tool marks, glue, or caulking.
- Cut and install insulating or sound-absorbing material.
- Cut tile or linoleum to fit and spread adhesives on flooring for installation.
- Cut timbers, lumber, or paneling to specified dimensions.
- Grind surfaces with a power grinder, or polish surfaces with polishing or surfacing machines.
- Grind curved surfaces or areas inaccessible to surfacing machine, such as stairways or cabinet tops, with portable hand grinder.
- Chip, scrape, or grind high spots, ridges, or rough projections to finish concrete, using pneumatic chisel, hand chisel, or other hand tools.
- Cut metal division strips and press them into the terrazzo base for joints or changes of color to form designs or patterns or to help prevent cracks.
- Measure designated amounts of ingredients for terrazzo or grout, according to standard formulas and specifications, using graduated containers and scales, and load ingredients into portable mixer.
- Blend marble chip mixtures, place into panels, and push a roller over the surface to embed the chips.
- Modify mixing, grouting, grinding, or cleaning procedures, according to type of installation or material used.
- Spread, level, or smooth concrete or terrazzo mixtures to form bases or finished surfaces, using rakes, shovels, hand or power trowels, hand or power screeds, or floats.
- Wash polished terrazzo surface, using cleaner and water, and apply sealer and curing agent according to manufacturer's specifications, using brush or sprayer.
- Position and secure moisture membrane and wire mesh in preparation for pouring base materials for terrazzo installation.
- Fill slight grinding depressions with matching grout material and hand-trowel for a smooth, uniform surface.
- Clean installation site, mixing and storage areas, tools, machines, and equipment, and store materials and equipment.
- Sprinkle colored marble or stone chips, powdered steel, or coloring powder over surface to produce prescribed finish.
- Wet surface to prepare for bonding, fill holes and cracks with grout or slurry, and smooth with a trowel.
- Mix cement, sand, and water to produce concrete, grout, or slurry, using hoe, trowel, tamper, scraper, or concrete-mixing machine.
- Mold expansion joints and edges, using edging tools, jointers, or straightedges.
- Move terrazzo installation materials, tools, machines, or work devices to work areas, manually or using wheelbarrow.
- Clean chipped area, using wire brush, and feel and observe surface to determine if it is rough or uneven.
- Repair concrete by cutting out damaged areas, drilling holes for reinforcing rods, and positioning reinforcing rods, using power saw and drill.
- Precast terrazzo blocks in wooden forms.
- Wet concrete surface and rub with stone to smooth surface and obtain specified finish.
- Build wooden molds, clamping molds around areas to be repaired, or setting up frames to the proper depth and alignment.
- Spread roofing paper on surface of foundation and spread concrete onto roofing paper with trowel to form terrazzo base.
- Produce rough concrete surface, using broom.
- Remove frames when the foundation is dry.
- Signal truck driver to position truck to facilitate pouring concrete and move chute to direct concrete on forms.
- Grind surfaces with a power grinder, or polish surfaces with polishing or surfacing machines.
- Grind curved surfaces or areas inaccessible to surfacing machine, such as stairways or cabinet tops, with portable hand grinder.
- Chip, scrape, or grind high spots, ridges, or rough projections to finish concrete, using pneumatic chisel, hand chisel, or other hand tools.
- Cut metal division strips and press them into the terrazzo base for joints or changes of color to form designs or patterns or to help prevent cracks.
- Smooth surfaces, using sandpaper, scrapers, brushes, steel wool, or sanding machines.
- Polish final coats to specified finishes.
- Cut stencils and brush or spray lettering or decorations on surfaces.
- Fill cracks, holes, or joints with caulk, putty, plaster, or other fillers, using caulking guns or putty knives.
- Cover surfaces with dropcloths or masking tape and paper to protect surfaces during painting.
- Read work orders or receive instructions from supervisors or homeowners to determine work requirements.
- Apply primers or sealers to prepare new surfaces, such as bare wood or metal, for finish coats.
- Apply paint, stain, varnish, enamel, or other finishes to equipment, buildings, bridges, or other structures, using brushes, spray guns, or rollers.
- Erect scaffolding or swing gates, or set up ladders, to work above ground level.
- Mix and match colors of paint, stain, or varnish with oil or thinning and drying additives to obtain desired colors and consistencies.
- Calculate amounts of required materials and estimate costs, based on surface measurements or work orders.
- Wash and treat surfaces with oil, turpentine, mildew remover, or other preparations, and sand rough spots to ensure that finishes will adhere properly.
- Select and purchase tools or finishes for surfaces to be covered, considering durability, ease of handling, methods of application, and customers' wishes.
- Remove old finishes by stripping, sanding, wire brushing, burning, or using water or abrasive blasting.
- Remove fixtures such as pictures, door knobs, lamps, or electric switch covers prior to painting.
- Use special finishing techniques such as sponging, ragging, layering, or faux finishing.
- Waterproof buildings, using waterproofers or caulking.
- Spray or brush hot plastics or pitch onto surfaces.
- Bake finishes on painted or enameled articles, using baking ovens.
- Smooth surfaces, using sandpaper, scrapers, brushes, steel wool, or sanding machines.
- Polish final coats to specified finishes.
- Cut stencils and brush or spray lettering or decorations on surfaces.
- Grind or polish glass, smoothing edges when necessary.
- Measure, cut, fit, and press anti-glare adhesive film to glass or spray glass with tinting solution to prevent light glare.
- Prepare glass for cutting by resting it on rack edges or against cutting tables and brushing thin layer of oil along cutting lines or dipping cutting tools in oil.
- Cut, fit, install, repair, or replace glass or glass substitutes, such as plastic or aluminum, in building interiors or exteriors or in furniture or other products.
- Pack spaces between moldings and glass with glazing compounds and trim excess material with glazing knives.
- Cut and remove broken glass prior to installing replacement glass.
- Score glass with cutters' wheels, breaking off excess glass by hand or with notched tools.
- Cut and attach mounting strips, metal or wood moldings, rubber gaskets, or metal clips to surfaces in preparation for mirror installation.
- Fabricate or install metal sashes or moldings for glass installation, using aluminum or steel framing.
- Determine plumb of walls or ceilings, using plumb lines and levels.
- Fasten glass panes into wood sashes or frames with clips, points, or moldings, adding weather seals or putty around pane edges to seal joints.
- Measure and mark outlines or patterns on glass to indicate cutting lines.
- Set glass doors into frames and bolt metal hinges, handles, locks, or other hardware to attach doors to frames and walls.
- Install pre-assembled metal or wood frameworks for windows or doors to be fitted with glass panels, using hand tools.
- Read and interpret blueprints or specifications to determine size, shape, color, type, or thickness of glass, location of framing, installation procedures, or staging or scaffolding materials required.
- Drive trucks to installation sites and unload mirrors, glass equipment, or tools.
- Measure mirrors and dimensions of areas to be covered to determine work procedures.
- Move furniture to clear work sites and cover floors or furnishings with drop cloths.
- Cut, assemble, fit, or attach metal-framed glass enclosures for showers, bathtubs, display cases, skylights, solariums, or other structures.
- Load and arrange glass or mirrors onto delivery trucks, using suction cups or cranes to lift glass.
- Secure mirrors in position, using mastic cement, putty, bolts, or screws.
- Assemble, erect, or dismantle scaffolds, rigging, or hoisting equipment.
- Confer with customers to determine project requirements or to provide cost estimates.
- Select the type or color of glass or mirror according to specifications.
- Operate cranes or hoists with suction cups to lift large, heavy pieces of glass.
- Create patterns on glass by etching, sandblasting, or painting designs.
- Assemble and cement sections of stained glass together.
- Grind or polish glass, smoothing edges when necessary.
- Measure, cut, fit, and press anti-glare adhesive film to glass or spray glass with tinting solution to prevent light glare.
- Prepare glass for cutting by resting it on rack edges or against cutting tables and brushing thin layer of oil along cutting lines or dipping cutting tools in oil.
- Cut, fit, install, repair, or replace glass or glass substitutes, such as plastic or aluminum, in building interiors or exteriors or in furniture or other products.
- Pack spaces between moldings and glass with glazing compounds and trim excess material with glazing knives.
- Cut and remove broken glass prior to installing replacement glass.
- Score glass with cutters' wheels, breaking off excess glass by hand or with notched tools.
- Cut and attach mounting strips, metal or wood moldings, rubber gaskets, or metal clips to surfaces in preparation for mirror installation.
- Measure and cut strips from rolls of wallpaper or fabric, using shears or razors.
- Smooth rough spots on walls and ceilings, using sandpaper.
- Trim rough edges from strips, using straightedges and trimming knives.
- Trim excess material at ceilings or baseboards, using knives.
- Smooth strips or sections of paper with brushes or rollers to remove wrinkles and bubbles and to smooth joints.
- Check finished wallcoverings for proper alignment, pattern matching, and neatness of seams.
- Mark vertical guidelines on walls to align strips, using plumb bobs and chalk lines.
- Cover interior walls and ceilings of rooms with decorative wallpaper or fabric, using hand tools.
- Apply adhesives to the backs of paper strips, using brushes, or dunk strips of prepasted wallcovering in water, wiping off any excess adhesive.
- Place strips or sections of paper on surfaces, aligning section edges and patterns.
- Fill holes, cracks, and other surface imperfections preparatory to covering surfaces.
- Measure surfaces or review work orders to estimate the quantities of materials needed.
- Apply sizing to seal surfaces and maximize adhesion of coverings to surfaces.
- Set up equipment, such as pasteboards and scaffolds.
- Remove old paper, using water, steam machines, or solvents and scrapers.
- Apply thinned glue to waterproof porous surfaces, using brushes, rollers, or pasting machines.
- Mix paste, using paste powder and water, and brush paste onto surfaces.
- Staple or tack advertising posters onto fences, walls, billboards, or poles.
- Remove paint, varnish, dirt, and grease from surfaces, using paint remover and water soda solutions.
- Apply acetic acid to damp plaster to prevent lime from bleeding through paper.
- Measure and cut strips from rolls of wallpaper or fabric, using shears or razors.
- Smooth rough spots on walls and ceilings, using sandpaper.
- Trim rough edges from strips, using straightedges and trimming knives.
- Trim excess material at ceilings or baseboards, using knives.
- Cut, surface, polish, and install marble and granite or install pre-cast terrazzo, granite or marble units.
- Cut tile backing to required size, using shears.
- Cut and shape tile to fit around obstacles and into odd spaces and corners, using hand and power cutting tools.
- Measure and cut metal lath to size for walls and ceilings, using tin snips.
- Lay and set mosaic tiles to create decorative wall, mural, and floor designs.
- Align and straighten tile using levels, squares, and straightedges.
- Determine and implement the best layout to achieve a desired pattern.
- Measure and mark surfaces to be tiled, following blueprints.
- Finish and dress the joints and wipe excess grout from between tiles, using damp sponge.
- Mix, apply, and spread plaster, concrete, mortar, cement, mastic, glue or other adhesives to form a bed for the tiles, using brush, trowel and screed.
- Apply mortar to tile back, position the tile, and press or tap with trowel handle to affix tile to base.
- Level concrete and allow to dry.
- Prepare surfaces for tiling by attaching lath or waterproof paper, or by applying a cement mortar coat to a metal screen.
- Mix and apply mortar or cement to edges and ends of drain tiles to seal halves and joints.
- Remove and replace cracked or damaged tile.
- Apply a sealer to make grout stain- and water-resistant.
- Remove any old tile, grout and adhesive using chisels and scrapers and clean the surface carefully.
- Prepare cost and labor estimates, based on calculations of time and materials needed for project.
- Study blueprints and examine surface to be covered to determine amount of material needed.
- Spread mastic or other adhesive base on roof deck to form base for promenade tile, using serrated spreader.
- Install and anchor fixtures in designated positions, using hand tools.
- Assist customers in selection of tile and grout.
- Select and order tile and other items to be installed, such as bathroom accessories, walls, panels, and cabinets, according to specifications.
- Build underbeds and install anchor bolts, wires, and brackets.
- Brush glue onto manila paper on which design has been drawn and position tiles, finished side down, onto paper.
- Cut, surface, polish, and install marble and granite or install pre-cast terrazzo, granite or marble units.
- Cut tile backing to required size, using shears.
- Cut and shape tile to fit around obstacles and into odd spaces and corners, using hand and power cutting tools.
- Measure and cut metal lath to size for walls and ceilings, using tin snips.
- Cut flooring material to fit around obstructions.
- Cut covering and foundation materials, according to blueprints and sketches.
- Trim excess covering materials, tack edges, and join sections of covering material to form tight joint.
- Sweep, scrape, sand, or chip dirt and irregularities to clean base surfaces, correcting imperfections that may show through the covering.
- Inspect surface to be covered to ensure that it is firm and dry.
- Form a smooth foundation by stapling plywood or Masonite over the floor or by brushing waterproof compound onto surface and filling cracks with plaster, putty, or grout to seal pores.
- Measure and mark guidelines on surfaces or foundations, using chalk lines and dividers.
- Roll and press sheet wall and floor covering into cement base to smooth and finish surface, using hand roller.
- Apply adhesive cement to floor or wall material to join and adhere foundation material.
- Determine traffic areas and decide location of seams.
- Lay out, position, and apply shock-absorbing, sound-deadening, or decorative coverings to floors, walls, and cabinets, following guidelines to keep courses straight and create designs.
- Remove excess cement to clean finished surface.
- Disconnect and remove appliances, light fixtures, and worn floor and wall covering from floors, walls, and cabinets.
- Heat and soften floor covering materials to patch cracks or fit floor coverings around irregular surfaces, using blowtorch.
- Cut flooring material to fit around obstructions.
- Cut covering and foundation materials, according to blueprints and sketches.
- Trim excess covering materials, tack edges, and join sections of covering material to form tight joint.
- Smooth, polish, and bevel surfaces, using hand tools and power tools.
- Repair cracked or chipped areas of stone or marble, using blowtorch and mastic, and remove rough or defective spots from concrete, using power grinder or chisel and hammer.
- Shape, trim, face and cut marble or stone preparatory to setting, using power saws, cutting equipment, and hand tools.
- Lay out wall patterns or foundations, using straight edge, rule, or staked lines.
- Set vertical and horizontal alignment of structures, using plumb bob, gauge line, and level.
- Mix mortar or grout and pour or spread mortar or grout on marble slabs, stone, or foundation.
- Remove wedges, fill joints between stones, finish joints between stones, using a trowel, and smooth the mortar to an attractive finish, using a tuck pointer.
- Set stone or marble in place, according to layout or pattern.
- Clean excess mortar or grout from surface of marble, stone, or monument, using sponge, brush, water, or acid.
- Lay brick to build shells of chimneys and smokestacks or to line or reline industrial furnaces, kilns, boilers and similar installations.
- Replace broken or missing masonry units in walls or floors.
- Drill holes in marble or ornamental stone and anchor brackets in holes.
- Remove sections of monument from truck bed, and guide stone onto foundation, using skids, hoist, or truck crane.
- Construct and install prefabricated masonry units.
- Dig trench for foundation of monument, using pick and shovel.
- Position mold along guidelines of wall, press mold in place, and remove mold and paper from wall.
- Line interiors of molds with treated paper and fill molds with composition-stone mixture.
- Smooth, polish, and bevel surfaces, using hand tools and power tools.
- Repair cracked or chipped areas of stone or marble, using blowtorch and mastic, and remove rough or defective spots from concrete, using power grinder or chisel and hammer.
- Shape, trim, face and cut marble or stone preparatory to setting, using power saws, cutting equipment, and hand tools.
- Chip, scrape, and grind high spots, ridges, and rough projections to finish concrete, using pneumatic chisels, power grinders, or hand tools.
- Polish surface, using polishing or surfacing machine.
- Cut metal division strips, and press them into terrazzo base so that top edges form desired design or pattern.
- Check the forms that hold the concrete to see that they are properly constructed.
- Set the forms that hold concrete to the desired pitch and depth, and align them.
- Spread, level, and smooth concrete, using rake, shovel, hand or power trowel, hand or power screed, and float.
- Monitor how the wind, heat, or cold affect the curing of the concrete throughout the entire process.
- Mold expansion joints and edges, using edging tools, jointers, and straightedge.
- Signal truck driver to position truck to facilitate pouring concrete, and move chute to direct concrete on forms.
- Direct the casting of the concrete and supervise laborers who use shovels or special tools to spread it.
- Produce rough concrete surface, using broom.
- Apply hardening and sealing compounds to cure surface of concrete, and waterproof or restore surface.
- Operate power vibrator to compact concrete.
- Install anchor bolts, steel plates, door sills and other fixtures in freshly poured concrete or pattern or stamp the surface to provide a decorative finish.
- Wet surface to prepare for bonding, fill holes and cracks with grout or slurry, and smooth, using trowel.
- Waterproof or restore concrete surfaces, using appropriate compounds.
- Mix cement, sand, and water to produce concrete, grout, or slurry, using hoe, trowel, tamper, scraper, or concrete-mixing machine.
- Cut out damaged areas, drill holes for reinforcing rods, and position reinforcing rods to repair concrete, using power saw and drill.
- Wet concrete surface, and rub with stone to smooth surface and obtain specified finish.
- Clean chipped area, using wire brush, and feel and observe surface to determine if it is rough or uneven.
- Build wooden molds, and clamp molds around area to be repaired, using hand tools.
- Sprinkle colored marble or stone chips, powdered steel, or coloring powder over surface to produce prescribed finish.
- Fabricate concrete beams, columns, and panels.
- Push roller over surface to embed chips in surface.
- Apply muriatic acid to clean surface, and rinse with water.
- Spread roofing paper on surface of foundation, and spread concrete onto roofing paper with trowel to form terrazzo base.
- Chip, scrape, and grind high spots, ridges, and rough projections to finish concrete, using pneumatic chisels, power grinders, or hand tools.
- Polish surface, using polishing or surfacing machine.
- Cut metal division strips, and press them into terrazzo base so that top edges form desired design or pattern.
- Scrape and sand floor edges and areas inaccessible to floor sanders, using scrapers, disk-type sanders, and sandpaper.
- Guide sanding machines over surfaces of floors until surfaces are smooth.
- Buff and vacuum floors to ensure their cleanliness prior to the application of finish.
- Inspect floors for smoothness.
- Attach sandpaper to rollers of sanding machines.
- Apply filler compound and coats of finish to floors to seal wood.
- Remove excess glue from joints, using knives, scrapers, or wood chisels.
- Scrape and sand floor edges and areas inaccessible to floor sanders, using scrapers, disk-type sanders, and sandpaper.
- Guide sanding machines over surfaces of floors until surfaces are smooth.
- Sand or patch nicks or cracks in plasterboard or wallboard.
- Sand rough spots of dried cement between applications of compounds.
- Spread sealing compound between boards or panels or over cracks, holes, nail heads, or screw heads, using trowels, broadknives, or spatulas.
- Press paper tape over joints to embed tape into sealing compound and to seal joints.
- Apply additional coats to fill in holes and make surfaces smooth.
- Seal joints between plasterboard or other wallboard to prepare wall surfaces for painting or papering.
- Spread and smooth cementing material over tape, using trowels or floating machines to blend joints with wall surfaces.
- Mix sealing compounds by hand or with portable electric mixers.
- Work on high ceilings, using scaffolding or other tools, such as stilts.
- Select the correct sealing compound or tape.
- Countersink nails or screws below surfaces of walls before applying sealing compounds, using hammers or screwdrivers.
- Remove extra compound after surfaces have been covered sufficiently.
- Install metal molding at wall corners to secure wallboard.
- Apply texturizing compounds or primers to walls or ceilings before final finishing, using trowels, brushes, rollers, or spray guns.
- Check adhesives to ensure that they will work and will remain durable.
- Use mechanical applicators that spread compounds and embed tape in one operation.
- Sand or patch nicks or cracks in plasterboard or wallboard.
- Sand rough spots of dried cement between applications of compounds.
- Cut felt, shingles, or strips of flashing to fit angles formed by walls, vents, or intersecting roof surfaces.
- Smooth rough spots to prepare surfaces for waterproofing, using hammers, chisels, or rubbing bricks.
- Inspect problem roofs to determine the best repair procedures.
- Remove snow, water, or debris from roofs prior to applying roofing materials.
- Set up scaffolding to provide safe access to roofs.
- Estimate materials and labor required to complete roofing jobs.
- Cement or nail flashing strips of metal or shingle over joints to make them watertight.
- Install partially overlapping layers of material over roof insulation surfaces, using chalk lines, gauges on shingling hatchets, or lines on shingles.
- Apply plastic coatings, membranes, fiberglass, or felt over sloped roofs before applying shingles.
- Install, repair, or replace single-ply roofing systems, using waterproof sheet materials such as modified plastics, elastomeric, or other asphaltic compositions.
- Attach roofing paper to roofs in overlapping strips to form bases for other materials.
- Cover roofs or exterior walls of structures with slate, asphalt, aluminum, wood, gravel, gypsum, or related materials, using brushes, knives, punches, hammers, or other tools.
- Waterproof or damp-proof walls, floors, roofs, foundations, or basements by painting or spraying surfaces with waterproof coatings or by attaching waterproofing membranes to surfaces.
- Apply reflective roof coatings, such as special paints or single-ply roofing sheets, to existing roofs to reduce solar heat absorption.
- Apply alternate layers of hot asphalt or tar and roofing paper to roofs.
- Install vapor barriers or layers of insulation on flat roofs.
- Cover exposed nailheads with roofing cement or caulking to prevent water leakage or rust.
- Glaze top layers to make a smooth finish or embed gravel in the bitumen for rough surfaces.
- Mop or pour hot asphalt or tar onto roof bases.
- Install attic ventilation systems, such as turbine vents, gable or ridge vents, or conventional or solar-powered exhaust fans.
- Install skylights on roofs to increase natural light inside structures or to reduce energy costs.
- Apply gravel or pebbles over top layers of roofs, using rakes or stiff-bristled brooms.
- Install solar roofing systems that have energy-collecting photovoltaic panels built into roofing membranes, shingles, or tiles.
- Spray roofs, sidings, or walls to bind, seal, insulate, or soundproof sections of structures, using spray guns, air compressors, or heaters.
- Attach solar panels to existing roofs, according to specifications and without damaging roofing materials or the structural integrity of buildings.
- Punch holes in slate, tile, terra cotta, or wooden shingles, using punches and hammers.
- Apply modular soil- and plant-containing grids over existing roof membranes to create green roofs.
- Install layers of vegetation-based green roofs, including protective membranes, drainage, aeration, water retention and filter layers, soil substrates, irrigation materials, and plants.
- Cut felt, shingles, or strips of flashing to fit angles formed by walls, vents, or intersecting roof surfaces.
- Smooth rough spots to prepare surfaces for waterproofing, using hammers, chisels, or rubbing bricks.
- Buff tires according to specifications for width and undertread depth.
- Trim excess rubber and imperfections during retreading processes.
- Align treads with guides, start drums to wind treads onto plies, and slice ends.
- Roll camelbacks onto casings by hand, and cut camelbacks, using knives.
- Cut plies at splice points, and press ends together to form continuous bands.
- Build semi-raw rubber treads onto buffed tire casings to prepare tires for vulcanization in recapping or retreading processes.
- Fill cuts and holes in tires, using hot rubber.
- Place tires into molds for new tread.
- Fit inner tubes and final layers of rubber onto tires.
- Brush or spray solvents onto plies to ensure adhesion, and repeat process as specified, alternating direction of each ply to strengthen tires.
- Start rollers that bond tread and plies as drums revolve.
- Inspect worn tires for faults, cracks, cuts, and nail holes, and to determine if tires are suitable for retreading.
- Measure tires to determine mold size requirements.
- Roll hand rollers over rebuilt casings, exerting pressure to ensure adhesion between camelbacks and casings.
- Position ply stitcher rollers and drums according to width of stock, using hand tools and gauges.
- Activate bead setters that press prefabricated beads onto plies.
- Depress pedals to rotate drums, and wind specified numbers of plies around drums to form tire bodies.
- Clean and paint completed tires.
- Rub cement sticks on drum edges to provide adhesive surfaces for plies.
- Position rollers that turn ply edges under and over beads, or use steel rods to turn ply edges.
- Depress pedals to collapse drums after processing is complete.
- Wind chafers and breakers onto plies.
- Pull plies from supply racks, and align plies with edges of drums.
- Buff tires according to specifications for width and undertread depth.
- Trim excess rubber and imperfections during retreading processes.
- Align treads with guides, start drums to wind treads onto plies, and slice ends.
- Roll camelbacks onto casings by hand, and cut camelbacks, using knives.
- Cut plies at splice points, and press ends together to form continuous bands.
- Grind ends of new or worn rails to attain smooth joints, using portable grinders.
- Cut rails to specified lengths, using rail saws.
- Operate tie-adzing machines to cut ties and permit insertion of fishplates that hold rails.
- Patrol assigned track sections so that damaged or broken track can be located and reported.
- Repair or adjust track switches, using wrenches and replacement parts.
- Weld sections of track together, such as switch points and frogs.
- Observe leveling indicator arms to verify levelness and alignment of tracks.
- Operate single- or multiple-head spike driving machines to drive spikes into ties and secure rails.
- Operate track wrenches to tighten or loosen bolts at joints that hold ends of rails together.
- Lubricate machines, change oil, or fill hydraulic reservoirs to specified levels.
- Drill holes through rails, tie plates, or fishplates for insertion of bolts or spikes, using power drills.
- Clean tracks or clear ice or snow from tracks or switch boxes.
- Clean, grade, or level ballast on railroad tracks.
- Raise rails, using hydraulic jacks, to allow for tie removal and replacement.
- Adjust controls of machines that spread, shape, raise, level, or align track, according to specifications.
- Dress and reshape worn or damaged railroad switch points or frogs, using portable power grinders.
- Clean or make minor repairs to machines or equipment.
- Operate single- or multiple-head spike pullers to pull old spikes from ties.
- String and attach wire-guidelines machine to rails so that tracks or rails can be aligned or leveled.
- Engage mechanisms that lay tracks or rails to specified gauges.
- Drive graders, tamping machines, brooms, or ballast spreading machines to redistribute gravel or ballast between rails.
- Drive vehicles that automatically move and lay tracks or rails over sections of track to be constructed, repaired, or maintained.
- Turn wheels of machines, using lever controls, to adjust guidelines for track alignments or grades, following specifications.
- Push controls to close grasping devices on track or rail sections so that they can be raised or moved.
- Paint railroad signs, such as speed limits or gate-crossing warnings.
- Spray ties, fishplates, or joints with oil to protect them from weathering.
- Grind ends of new or worn rails to attain smooth joints, using portable grinders.
- Cut rails to specified lengths, using rail saws.
- Operate tie-adzing machines to cut ties and permit insertion of fishplates that hold rails.
- Measure and cut insulation for covering surfaces, using tape measures, handsaws, power saws, knives, or scissors.
- Fit, wrap, staple, or glue insulating materials to structures or surfaces, using hand tools or wires.
- Cover and line structures with blown or rolled forms of materials to insulate against cold, heat, or moisture, using saws, knives, rasps, trowels, blowers, or other tools and implements.
- Distribute insulating materials evenly into small spaces within floors, ceilings, or walls, using blowers and hose attachments, or cement mortars.
- Move controls, buttons, or levers to start blowers and regulate flow of materials through nozzles.
- Fill blower hoppers with insulating materials.
- Cover, seal, or finish insulated surfaces or access holes with plastic covers, canvas strips, sealants, tape, cement or asphalt mastic.
- Read blueprints, and select appropriate insulation, based on space characteristics and the heat retaining or excluding characteristics of the material.
- Remove old insulation, such as asbestos, following safety procedures.
- Prepare surfaces for insulation application by brushing or spreading on adhesives, cement, or asphalt, or by attaching metal pins to surfaces.
- Measure and cut insulation for covering surfaces, using tape measures, handsaws, power saws, knives, or scissors.
- Smooth surfaces of articles to be painted, using sanding and buffing tools and equipment.
- Clean work areas and equipment.
- Perform support duties to assist painters, paperhangers, plasterers, or masons.
- Apply protective coverings, such as masking tape, to articles or areas that could be damaged or stained by work processes.
- Erect scaffolding.
- Fill cracks or breaks in surfaces of plaster articles or areas with putty or epoxy compounds.
- Supply or hold tools and materials.
- Mix plaster, and carry plaster to plasterers.
- Place articles to be stripped into stripping tanks.
- Remove articles such as cabinets, metal furniture, and paint containers from stripping tanks after prescribed periods of time.
- Pour specified amounts of chemical solutions into stripping tanks.
- Smooth surfaces of articles to be painted, using sanding and buffing tools and equipment.
- Measure and cut insulation for covering surfaces, using tape measures, handsaws, knives, and scissors.
- Fit insulation around obstructions, and shape insulating materials and protective coverings as required.
- Determine the amounts and types of insulation needed, and methods of installation, based on factors such as location, surface shape, and equipment use.
- Install sheet metal around insulated pipes with screws to protect the insulation from weather conditions or physical damage.
- Apply, remove, and repair insulation on industrial equipment, pipes, ductwork, or other mechanical systems such as heat exchangers, tanks, and vessels, to help control noise and maintain temperatures.
- Select appropriate insulation, such as fiberglass, Styrofoam, or cork, based on the heat retaining or excluding characteristics of the material.
- Read blueprints and specifications to determine job requirements.
- Cover, seal, or finish insulated surfaces or access holes with plastic covers, canvas strips, sealants, tape, cement, or asphalt mastic.
- Prepare surfaces for insulation application by brushing or spreading on adhesives, cement, or asphalt, or by attaching metal pins to surfaces.
- Remove or seal off old asbestos insulation, following safety procedures.
- Distribute insulating materials evenly into small spaces within floors, ceilings, or walls, using blowers and hose attachments or cement mortar.
- Move controls, buttons, or levers to start blowers, and to regulate flow of materials through nozzles.
- Fill blower hoppers with insulating materials.
- Measure and cut insulation for covering surfaces, using tape measures, handsaws, knives, and scissors.
- Cut, miter, and glue piping insulation to insulate plumbing pipes and fittings.
- Test operation or functionality of mechanical, plumbing, electrical, and control systems.
- Apply weather seal, such as pipe flashings and sealants, to roof penetrations and structural devices.
- Install solar collector mounting devices on tile, asphalt, shingle, or built-up gravel roofs, using appropriate materials and penetration methods.
- Install copper or plastic plumbing using pipes, fittings, pipe cutters, acetylene torches, solder, wire brushes, sand cloths, flux, plastic pipe cleaners, or plastic glue.
- Identify plumbing, electrical, environmental, or safety hazards associated with solar thermal installations.
- Demonstrate start-up, shut-down, maintenance, diagnostic, and safety procedures to thermal system owners.
- Install circulating pumps using pipe, fittings, soldering equipment, electrical supplies, and hand tools.
- Install flat-plat, evacuated glass, or concentrating solar collectors on mounting devices, using brackets or struts.
- Install solar thermal system controllers and sensors.
- Fill water tanks and check tanks, pipes, and fittings for leaks.
- Design active direct or indirect, passive direct or indirect, or pool solar systems.
- Determine locations for installing solar subsystem components, including piping, water heaters, valves, and ancillary equipment.
- Perform routine maintenance or repairs to restore solar thermal systems to baseline operating conditions.
- Install heat exchangers and heat exchanger fluids according to installation manuals and schematics.
- Apply operation or identification tags or labels to system components, as required.
- Connect water heaters and storage tanks to power and water sources.
- Install plumbing, such as dip tubes, port fittings, drain tank valves, pressure temperature relief valves, or tanks, according to manufacturer specifications and building codes.
- Install monitoring system components, such as flow meters, temperature gauges, and pressure gauges, according to system design and manufacturer specifications.
- Assess collector sites to ensure structural integrity of potential mounting surfaces or the best orientation and tilt for solar collectors.
- Apply ultraviolet radiation protection to prevent degradation of plumbing.
- Cut, miter, and glue piping insulation to insulate plumbing pipes and fittings.
- Trim, file, grind, deburr, buff, or smooth surfaces, seams, or joints of assembled parts, using hand tools or portable power tools.
- Convert blueprints into shop drawings to be followed in the construction or assembly of sheet metal products.
- Determine project requirements, such as scope, assembly sequences, or required methods or materials, using blueprints, drawings, or written or verbal instructions.
- Lay out, measure, and mark dimensions and reference lines on material, such as roofing panels, using calculators, scribes, dividers, squares, or rulers.
- Fasten seams or joints together with welds, bolts, cement, rivets, solder, caulks, metal drive clips, or bonds to assemble components into products or to repair sheet metal items.
- Fabricate ducts for high efficiency heating, ventilating, and air conditioning (HVAC) systems to maximize efficiency of systems.
- Select gauges or types of sheet metal or nonmetallic material, according to product specifications.
- Finish parts, using hacksaws or hand, rotary, or squaring shears.
- Shape metal material over anvils, blocks, or other forms, using hand tools.
- Fabricate or alter parts at construction sites, using shears, hammers, punches, or drills.
- Transport prefabricated parts to construction sites for assembly and installation.
- Install assemblies, such as flashing, pipes, tubes, heating and air conditioning ducts, furnace casings, rain gutters, or downspouts in supportive frameworks.
- Hire, train, or supervise new employees or apprentices.
- Maintain equipment, making repairs or modifications when necessary.
- Develop or lay out patterns, using computerized metalworking equipment.
- Maneuver completed roofing units into position for installation.
- Inspect individual parts, assemblies, or installations, using measuring instruments, such as calipers, scales, or micrometers.
- Verify that heating, ventilating, and air conditioning (HVAC) systems are designed, installed, and calibrated in accordance with green certification standards, such as those of Leadership in Energy and Environmental Design (LEED).
- Secure metal roof panels in place by interlocking and fastening grooved panel edges.
- Perform building commissioning activities by completing mechanical inspections of a building's water, lighting, or heating, ventilating, and air conditioning (HVAC) systems.
- Fasten roof panel edges or machine-made moldings to structures by nailing or welding.
- Perform sheet metal work necessary for solar panel installations.
- Install green architectural sheet metal components, such as cool roofs or hot or cold walls.
- Construct components for high-performance wind turbine systems.
- Trim, file, grind, deburr, buff, or smooth surfaces, seams, or joints of assembled parts, using hand tools or portable power tools.
- Cut specified lengths of primacord and attach primers to cord ends.
- Examine blast areas to determine amounts and kinds of explosive charges needed and to ensure that safety laws are observed.
- Tie specified lengths of delaying fuses into patterns in order to time sequences of explosions.
- Place safety cones around blast areas to alert other workers of danger zones, and signal workers as necessary to ensure that they clear blast sites prior to explosions.
- Place explosive charges in holes or other spots; then detonate explosives to demolish structures or to loosen, remove, or displace earth, rock, or other materials.
- Insert, pack, and pour explosives, such as dynamite, ammonium nitrate, black powder, or slurries into blast holes; then shovel drill cuttings, admit water into boreholes, and tamp material to compact charges.
- Mark patterns, locations, and depths of charge holes for drilling, and issue drilling instructions.
- Compile and keep gun and explosives records in compliance with local and federal laws.
- Measure depths of drilled blast holes, using weighted tape measures.
- Connect electrical wire to primers, and cover charges or fill blast holes with clay, drill chips, sand, or other material.
- Lay primacord between rows of charged blast holes, and tie cord into main lines to form blast patterns.
- Assemble and position equipment, explosives, and blasting caps in holes at specified depths, or load perforating guns or torpedoes with explosives.
- Verify detonation of charges by observing control panels, or by listening for the sounds of blasts.
- Move and store inventories of explosives, loaded perforating guns, and other materials, according to established safety procedures.
- Light fuses, drop detonating devices into wells or boreholes, or activate firing devices with plungers, dials, or buttons, in order to set off single or multiple blasts.
- Drive trucks to transport explosives and blasting equipment to blasting sites.
- Maintain inventory levels, ordering new supplies as necessary.
- Repair and service blasting, shooting, and automotive equipment, and electrical wiring and instruments, using hand tools.
- Set up and operate short-wave radio or field telephone equipment to transmit and receive blast information.
- Insert waterproof sealers, bullets, and/or powder charges into guns, and screw gun ports back into place.
- Clean, gauge, and lubricate gun ports.
- Connect gun chambers to electric detonating devices, and operate controls at panelboards, in order to detonate charges in guns or to ignite chemical charges.
- Lower perforating guns into wells, using hoists; then use measuring devices and instrument panels to position guns in correct positions for taking samples.
- Insert powder charges into chambers of sidewall sample-taking cylinders, and assemble cylinders, using special wrenches.
- Obtain samples of earth from sidewalls of well boreholes, using electrically exploding devices.
- Create and lay out designs for drill and blast patterns.
- Document geological formations encountered during work.
- Operate machines to flush earth cuttings or to blow dust from holes.
- Set up and operate equipment such as hoists, jackhammers, and drills, in order to bore charge holes.
- Signal crane operators to move equipment.
- Cut specified lengths of primacord and attach primers to cord ends.
- Grind, scrape, sand, or polish surfaces, such as concrete, marble, terrazzo, or wood flooring, using abrasive tools or machines.
- Tend pumps, compressors, or generators to provide power for tools, machinery, or equipment or to heat or move materials, such as asphalt.
- Lubricate, clean, or repair machinery, equipment, or tools.
- Signal equipment operators to facilitate alignment, movement, or adjustment of machinery, equipment, or materials.
- Read plans, instructions, or specifications to determine work activities.
- Measure, mark, or record openings or distances to layout areas where construction work will be performed.
- Clean or prepare construction sites to eliminate possible hazards.
- Dig ditches or trenches, backfill excavations, or compact and level earth to grade specifications, using picks, shovels, pneumatic tampers, or rakes.
- Load, unload, or identify building materials, machinery, or tools, distributing them to the appropriate locations, according to project plans or specifications.
- Position, join, align, or seal structural components, such as concrete wall sections or pipes.
- Perform site activities required of green certified construction practices, such as implementing waste management procedures, identifying materials for reuse, or installing erosion or sedimentation control mechanisms.
- Control traffic passing near, in, or around work zones.
- Install sewer, water, or storm drain pipes, using pipe-laying machinery or laser guidance equipment.
- Operate or maintain air monitoring or other sampling devices in confined or hazardous environments.
- Smooth or finish freshly poured cement or concrete, using floats, trowels, screeds, or powered cement finishing tools.
- Erect or dismantle scaffolding, shoring, braces, traffic barricades, ramps, or other temporary structures.
- Provide assistance to craft workers, such as carpenters, plasterers, or masons.
- Perform building weatherization tasks, such as repairing windows, adding insulation, or applying weather-stripping materials.
- Apply weather-stripping to reduce energy loss.
- Spray materials, such as water, sand, steam, vinyl, paint, or stucco, through hoses to clean, coat, or seal surfaces.
- Raze buildings or salvage useful materials.
- Mop, brush, or spread paints, cleaning solutions, or other compounds over surfaces to clean them or to provide protection.
- Position or dismantle forms for pouring concrete, using saws, hammers, nails, or bolts.
- Place, consolidate, or protect case-in-place concrete or masonry structures.
- Mix ingredients to create compounds for covering or cleaning surfaces.
- Mix, pour, or spread concrete, using portable cement mixers.
- Operate jackhammers or drills to break up concrete or pavement.
- Apply caulking compounds by hand or caulking guns to protect against entry of water or air.
- Tend machines that pump concrete, grout, cement, sand, plaster, or stucco through spray guns for application to ceilings or walls.
- Identify, pack, or transport hazardous or radioactive materials.
- Use computers or other input devices to control robotic pipe cutters or cleaners.
- Perform construction laborer duties at green building sites, such as renewable energy plants or wind turbine installations.
- Grind, scrape, sand, or polish surfaces, such as concrete, marble, terrazzo, or wood flooring, using abrasive tools or machines.