- Apply hardening and sealing compounds to cure surface of concrete, and waterproof or restore surface.
Occupations with related tasks Save Table: XLSX CSV
Closely Related Tasks | All Related Tasks | Job Zone | Code | Occupation |
5 | 9 | 2 | 47-2053.00 | Terrazzo Workers and Finishers |
3 | 8 | 2 | 47-2181.00 | Roofers |
3 | 7 | 2 | 47-2061.00 | Construction Laborers
|
2 | 5 | 2 | 47-2082.00 | Tapers |
2 | 5 | 2 | 47-2141.00 | Painters, Construction and Maintenance |
2 | 5 | 2 | 47-2142.00 | Paperhangers |
2 | 4 | 3 | 47-2152.04 | Solar Thermal Installers and Technicians |
1 | 7 | 2 | 47-2044.00 | Tile and Stone Setters
|
1 | 6 | 2 | 47-4091.00 | Segmental Pavers |
1 | 4 | 2 | 47-2042.00 | Floor Layers, Except Carpet, Wood, and Hard Tiles
|
1 | 4 | 2 | 47-3011.00 | Helpers--Brickmasons, Blockmasons, Stonemasons, and Tile and Marble Setters |
1 | 4 | 2 | 47-3012.00 | Helpers--Carpenters |
1 | 4 | 2 | 47-4061.00 | Rail-Track Laying and Maintenance Equipment Operators |
1 | 3 | 2 | 47-3016.00 | Helpers--Roofers |
1 | 2 | 2 | 47-2131.00 | Insulation Workers, Floor, Ceiling, and Wall |
1 | 2 | 2 | 47-2132.00 | Insulation Workers, Mechanical |
1 | 1 | 1 | 47-2043.00 | Floor Sanders and Finishers |
1 | 1 | 2 | 47-2021.00 | Brickmasons and Blockmasons |
1 | 1 | 2 | 47-2231.00 | Solar Photovoltaic Installers
|
- Spread, level, or smooth concrete or terrazzo mixtures to form bases or finished surfaces, using rakes, shovels, hand or power trowels, hand or power screeds, or floats.
- Wash polished terrazzo surface, using cleaner and water, and apply sealer and curing agent according to manufacturer's specifications, using brush or sprayer.
- Mold expansion joints and edges, using edging tools, jointers, or straightedges.
- Wet concrete surface and rub with stone to smooth surface and obtain specified finish.
- Produce rough concrete surface, using broom.
- Wet surface to prepare for bonding, fill holes and cracks with grout or slurry, and smooth with a trowel.
- Precast terrazzo blocks in wooden forms.
- Spread roofing paper on surface of foundation and spread concrete onto roofing paper with trowel to form terrazzo base.
- Signal truck driver to position truck to facilitate pouring concrete and move chute to direct concrete on forms.
- Measure designated amounts of ingredients for terrazzo or grout, according to standard formulas and specifications, using graduated containers and scales, and load ingredients into portable mixer.
- Grind surfaces with a power grinder, or polish surfaces with polishing or surfacing machines.
- Cut metal division strips and press them into the terrazzo base for joints or changes of color to form designs or patterns or to help prevent cracks.
- Blend marble chip mixtures, place into panels, and push a roller over the surface to embed the chips.
- Modify mixing, grouting, grinding, or cleaning procedures, according to type of installation or material used.
- Grind curved surfaces or areas inaccessible to surfacing machine, such as stairways or cabinet tops, with portable hand grinder.
- Position and secure moisture membrane and wire mesh in preparation for pouring base materials for terrazzo installation.
- Fill slight grinding depressions with matching grout material and hand-trowel for a smooth, uniform surface.
- Clean installation site, mixing and storage areas, tools, machines, and equipment, and store materials and equipment.
- Sprinkle colored marble or stone chips, powdered steel, or coloring powder over surface to produce prescribed finish.
- Mix cement, sand, and water to produce concrete, grout, or slurry, using hoe, trowel, tamper, scraper, or concrete-mixing machine.
- Chip, scrape, or grind high spots, ridges, or rough projections to finish concrete, using pneumatic chisel, hand chisel, or other hand tools.
- Move terrazzo installation materials, tools, machines, or work devices to work areas, manually or using wheelbarrow.
- Clean chipped area, using wire brush, and feel and observe surface to determine if it is rough or uneven.
- Repair concrete by cutting out damaged areas, drilling holes for reinforcing rods, and positioning reinforcing rods, using power saw and drill.
- Build wooden molds, clamping molds around areas to be repaired, or setting up frames to the proper depth and alignment.
- Remove frames when the foundation is dry.
- Spread, level, or smooth concrete or terrazzo mixtures to form bases or finished surfaces, using rakes, shovels, hand or power trowels, hand or power screeds, or floats.
- Wash polished terrazzo surface, using cleaner and water, and apply sealer and curing agent according to manufacturer's specifications, using brush or sprayer.
- Mold expansion joints and edges, using edging tools, jointers, or straightedges.
- Wet concrete surface and rub with stone to smooth surface and obtain specified finish.
- Produce rough concrete surface, using broom.
- Wet surface to prepare for bonding, fill holes and cracks with grout or slurry, and smooth with a trowel.
- Precast terrazzo blocks in wooden forms.
- Spread roofing paper on surface of foundation and spread concrete onto roofing paper with trowel to form terrazzo base.
- Signal truck driver to position truck to facilitate pouring concrete and move chute to direct concrete on forms.
- Waterproof or damp-proof walls, floors, roofs, foundations, or basements by painting or spraying surfaces with waterproof coatings or by attaching waterproofing membranes to surfaces.
- Cover exposed nailheads with roofing cement or caulking to prevent water leakage or rust.
- Spray roofs, sidings, or walls to bind, seal, insulate, or soundproof sections of structures, using spray guns, air compressors, or heaters.
- Cement or nail flashing strips of metal or shingle over joints to make them watertight.
- Apply reflective roof coatings, such as special paints or single-ply roofing sheets, to existing roofs to reduce solar heat absorption.
- Glaze top layers to make a smooth finish or embed gravel in the bitumen for rough surfaces.
- Mop or pour hot asphalt or tar onto roof bases.
- Apply gravel or pebbles over top layers of roofs, using rakes or stiff-bristled brooms.
- Inspect problem roofs to determine the best repair procedures.
- Remove snow, water, or debris from roofs prior to applying roofing materials.
- Set up scaffolding to provide safe access to roofs.
- Estimate materials and labor required to complete roofing jobs.
- Install partially overlapping layers of material over roof insulation surfaces, using chalk lines, gauges on shingling hatchets, or lines on shingles.
- Cut felt, shingles, or strips of flashing to fit angles formed by walls, vents, or intersecting roof surfaces.
- Apply plastic coatings, membranes, fiberglass, or felt over sloped roofs before applying shingles.
- Install, repair, or replace single-ply roofing systems, using waterproof sheet materials such as modified plastics, elastomeric, or other asphaltic compositions.
- Attach roofing paper to roofs in overlapping strips to form bases for other materials.
- Cover roofs or exterior walls of structures with slate, asphalt, aluminum, wood, gravel, gypsum, or related materials, using brushes, knives, punches, hammers, or other tools.
- Apply alternate layers of hot asphalt or tar and roofing paper to roofs.
- Install vapor barriers or layers of insulation on flat roofs.
- Smooth rough spots to prepare surfaces for waterproofing, using hammers, chisels, or rubbing bricks.
- Install attic ventilation systems, such as turbine vents, gable or ridge vents, or conventional or solar-powered exhaust fans.
- Install skylights on roofs to increase natural light inside structures or to reduce energy costs.
- Install solar roofing systems that have energy-collecting photovoltaic panels built into roofing membranes, shingles, or tiles.
- Attach solar panels to existing roofs, according to specifications and without damaging roofing materials or the structural integrity of buildings.
- Punch holes in slate, tile, terra cotta, or wooden shingles, using punches and hammers.
- Apply modular soil- and plant-containing grids over existing roof membranes to create green roofs.
- Install layers of vegetation-based green roofs, including protective membranes, drainage, aeration, water retention and filter layers, soil substrates, irrigation materials, and plants.
- Waterproof or damp-proof walls, floors, roofs, foundations, or basements by painting or spraying surfaces with waterproof coatings or by attaching waterproofing membranes to surfaces.
- Cover exposed nailheads with roofing cement or caulking to prevent water leakage or rust.
- Spray roofs, sidings, or walls to bind, seal, insulate, or soundproof sections of structures, using spray guns, air compressors, or heaters.
- Cement or nail flashing strips of metal or shingle over joints to make them watertight.
- Apply reflective roof coatings, such as special paints or single-ply roofing sheets, to existing roofs to reduce solar heat absorption.
- Glaze top layers to make a smooth finish or embed gravel in the bitumen for rough surfaces.
- Mop or pour hot asphalt or tar onto roof bases.
- Apply gravel or pebbles over top layers of roofs, using rakes or stiff-bristled brooms.
- Smooth or finish freshly poured cement or concrete, using floats, trowels, screeds, or powered cement finishing tools.
- Spray materials, such as water, sand, steam, vinyl, paint, or stucco, through hoses to clean, coat, or seal surfaces.
- Apply caulking compounds by hand or caulking guns to protect against entry of water or air.
- Dig ditches or trenches, backfill excavations, or compact and level earth to grade specifications, using picks, shovels, pneumatic tampers, or rakes.
- Provide assistance to craft workers, such as carpenters, plasterers, or masons.
- Mop, brush, or spread paints, cleaning solutions, or other compounds over surfaces to clean them or to provide protection.
- Mix, pour, or spread concrete, using portable cement mixers.
- Tend pumps, compressors, or generators to provide power for tools, machinery, or equipment or to heat or move materials, such as asphalt.
- Lubricate, clean, or repair machinery, equipment, or tools.
- Signal equipment operators to facilitate alignment, movement, or adjustment of machinery, equipment, or materials.
- Read plans, instructions, or specifications to determine work activities.
- Measure, mark, or record openings or distances to layout areas where construction work will be performed.
- Clean or prepare construction sites to eliminate possible hazards.
- Load, unload, or identify building materials, machinery, or tools, distributing them to the appropriate locations, according to project plans or specifications.
- Position, join, align, or seal structural components, such as concrete wall sections or pipes.
- Perform site activities required of green certified construction practices, such as implementing waste management procedures, identifying materials for reuse, or installing erosion or sedimentation control mechanisms.
- Control traffic passing near, in, or around work zones.
- Install sewer, water, or storm drain pipes, using pipe-laying machinery or laser guidance equipment.
- Operate or maintain air monitoring or other sampling devices in confined or hazardous environments.
- Erect or dismantle scaffolding, shoring, braces, traffic barricades, ramps, or other temporary structures.
- Perform building weatherization tasks, such as repairing windows, adding insulation, or applying weather-stripping materials.
- Apply weather-stripping to reduce energy loss.
- Raze buildings or salvage useful materials.
- Position or dismantle forms for pouring concrete, using saws, hammers, nails, or bolts.
- Grind, scrape, sand, or polish surfaces, such as concrete, marble, terrazzo, or wood flooring, using abrasive tools or machines.
- Place, consolidate, or protect case-in-place concrete or masonry structures.
- Mix ingredients to create compounds for covering or cleaning surfaces.
- Operate jackhammers or drills to break up concrete or pavement.
- Tend machines that pump concrete, grout, cement, sand, plaster, or stucco through spray guns for application to ceilings or walls.
- Identify, pack, or transport hazardous or radioactive materials.
- Use computers or other input devices to control robotic pipe cutters or cleaners.
- Perform construction laborer duties at green building sites, such as renewable energy plants or wind turbine installations.
- Smooth or finish freshly poured cement or concrete, using floats, trowels, screeds, or powered cement finishing tools.
- Spray materials, such as water, sand, steam, vinyl, paint, or stucco, through hoses to clean, coat, or seal surfaces.
- Apply caulking compounds by hand or caulking guns to protect against entry of water or air.
- Dig ditches or trenches, backfill excavations, or compact and level earth to grade specifications, using picks, shovels, pneumatic tampers, or rakes.
- Provide assistance to craft workers, such as carpenters, plasterers, or masons.
- Mop, brush, or spread paints, cleaning solutions, or other compounds over surfaces to clean them or to provide protection.
- Mix, pour, or spread concrete, using portable cement mixers.
- Spread sealing compound between boards or panels or over cracks, holes, nail heads, or screw heads, using trowels, broadknives, or spatulas.
- Press paper tape over joints to embed tape into sealing compound and to seal joints.
- Spread and smooth cementing material over tape, using trowels or floating machines to blend joints with wall surfaces.
- Apply texturizing compounds or primers to walls or ceilings before final finishing, using trowels, brushes, rollers, or spray guns.
- Use mechanical applicators that spread compounds and embed tape in one operation.
- Apply additional coats to fill in holes and make surfaces smooth.
- Seal joints between plasterboard or other wallboard to prepare wall surfaces for painting or papering.
- Sand or patch nicks or cracks in plasterboard or wallboard.
- Mix sealing compounds by hand or with portable electric mixers.
- Work on high ceilings, using scaffolding or other tools, such as stilts.
- Select the correct sealing compound or tape.
- Countersink nails or screws below surfaces of walls before applying sealing compounds, using hammers or screwdrivers.
- Remove extra compound after surfaces have been covered sufficiently.
- Install metal molding at wall corners to secure wallboard.
- Check adhesives to ensure that they will work and will remain durable.
- Sand rough spots of dried cement between applications of compounds.
- Spread sealing compound between boards or panels or over cracks, holes, nail heads, or screw heads, using trowels, broadknives, or spatulas.
- Press paper tape over joints to embed tape into sealing compound and to seal joints.
- Spread and smooth cementing material over tape, using trowels or floating machines to blend joints with wall surfaces.
- Apply texturizing compounds or primers to walls or ceilings before final finishing, using trowels, brushes, rollers, or spray guns.
- Use mechanical applicators that spread compounds and embed tape in one operation.
- Waterproof buildings, using waterproofers or caulking.
- Spray or brush hot plastics or pitch onto surfaces.
- Apply primers or sealers to prepare new surfaces, such as bare wood or metal, for finish coats.
- Apply paint, stain, varnish, enamel, or other finishes to equipment, buildings, bridges, or other structures, using brushes, spray guns, or rollers.
- Wash and treat surfaces with oil, turpentine, mildew remover, or other preparations, and sand rough spots to ensure that finishes will adhere properly.
- Fill cracks, holes, or joints with caulk, putty, plaster, or other fillers, using caulking guns or putty knives.
- Cover surfaces with dropcloths or masking tape and paper to protect surfaces during painting.
- Smooth surfaces, using sandpaper, scrapers, brushes, steel wool, or sanding machines.
- Read work orders or receive instructions from supervisors or homeowners to determine work requirements.
- Erect scaffolding or swing gates, or set up ladders, to work above ground level.
- Mix and match colors of paint, stain, or varnish with oil or thinning and drying additives to obtain desired colors and consistencies.
- Calculate amounts of required materials and estimate costs, based on surface measurements or work orders.
- Polish final coats to specified finishes.
- Select and purchase tools or finishes for surfaces to be covered, considering durability, ease of handling, methods of application, and customers' wishes.
- Remove old finishes by stripping, sanding, wire brushing, burning, or using water or abrasive blasting.
- Remove fixtures such as pictures, door knobs, lamps, or electric switch covers prior to painting.
- Use special finishing techniques such as sponging, ragging, layering, or faux finishing.
- Cut stencils and brush or spray lettering or decorations on surfaces.
- Bake finishes on painted or enameled articles, using baking ovens.
- Waterproof buildings, using waterproofers or caulking.
- Spray or brush hot plastics or pitch onto surfaces.
- Apply primers or sealers to prepare new surfaces, such as bare wood or metal, for finish coats.
- Apply paint, stain, varnish, enamel, or other finishes to equipment, buildings, bridges, or other structures, using brushes, spray guns, or rollers.
- Wash and treat surfaces with oil, turpentine, mildew remover, or other preparations, and sand rough spots to ensure that finishes will adhere properly.
- Apply thinned glue to waterproof porous surfaces, using brushes, rollers, or pasting machines.
- Apply acetic acid to damp plaster to prevent lime from bleeding through paper.
- Apply adhesives to the backs of paper strips, using brushes, or dunk strips of prepasted wallcovering in water, wiping off any excess adhesive.
- Apply sizing to seal surfaces and maximize adhesion of coverings to surfaces.
- Mix paste, using paste powder and water, and brush paste onto surfaces.
- Smooth strips or sections of paper with brushes or rollers to remove wrinkles and bubbles and to smooth joints.
- Trim rough edges from strips, using straightedges and trimming knives.
- Trim excess material at ceilings or baseboards, using knives.
- Check finished wallcoverings for proper alignment, pattern matching, and neatness of seams.
- Mark vertical guidelines on walls to align strips, using plumb bobs and chalk lines.
- Cover interior walls and ceilings of rooms with decorative wallpaper or fabric, using hand tools.
- Measure and cut strips from rolls of wallpaper or fabric, using shears or razors.
- Place strips or sections of paper on surfaces, aligning section edges and patterns.
- Fill holes, cracks, and other surface imperfections preparatory to covering surfaces.
- Measure surfaces or review work orders to estimate the quantities of materials needed.
- Smooth rough spots on walls and ceilings, using sandpaper.
- Set up equipment, such as pasteboards and scaffolds.
- Remove old paper, using water, steam machines, or solvents and scrapers.
- Staple or tack advertising posters onto fences, walls, billboards, or poles.
- Remove paint, varnish, dirt, and grease from surfaces, using paint remover and water soda solutions.
- Apply thinned glue to waterproof porous surfaces, using brushes, rollers, or pasting machines.
- Apply acetic acid to damp plaster to prevent lime from bleeding through paper.
- Apply adhesives to the backs of paper strips, using brushes, or dunk strips of prepasted wallcovering in water, wiping off any excess adhesive.
- Apply sizing to seal surfaces and maximize adhesion of coverings to surfaces.
- Mix paste, using paste powder and water, and brush paste onto surfaces.
- Apply weather seal, such as pipe flashings and sealants, to roof penetrations and structural devices.
- Apply ultraviolet radiation protection to prevent degradation of plumbing.
- Fill water tanks and check tanks, pipes, and fittings for leaks.
- Cut, miter, and glue piping insulation to insulate plumbing pipes and fittings.
- Test operation or functionality of mechanical, plumbing, electrical, and control systems.
- Install solar collector mounting devices on tile, asphalt, shingle, or built-up gravel roofs, using appropriate materials and penetration methods.
- Install copper or plastic plumbing using pipes, fittings, pipe cutters, acetylene torches, solder, wire brushes, sand cloths, flux, plastic pipe cleaners, or plastic glue.
- Identify plumbing, electrical, environmental, or safety hazards associated with solar thermal installations.
- Demonstrate start-up, shut-down, maintenance, diagnostic, and safety procedures to thermal system owners.
- Install circulating pumps using pipe, fittings, soldering equipment, electrical supplies, and hand tools.
- Install flat-plat, evacuated glass, or concentrating solar collectors on mounting devices, using brackets or struts.
- Install solar thermal system controllers and sensors.
- Design active direct or indirect, passive direct or indirect, or pool solar systems.
- Determine locations for installing solar subsystem components, including piping, water heaters, valves, and ancillary equipment.
- Perform routine maintenance or repairs to restore solar thermal systems to baseline operating conditions.
- Install heat exchangers and heat exchanger fluids according to installation manuals and schematics.
- Apply operation or identification tags or labels to system components, as required.
- Connect water heaters and storage tanks to power and water sources.
- Install plumbing, such as dip tubes, port fittings, drain tank valves, pressure temperature relief valves, or tanks, according to manufacturer specifications and building codes.
- Install monitoring system components, such as flow meters, temperature gauges, and pressure gauges, according to system design and manufacturer specifications.
- Assess collector sites to ensure structural integrity of potential mounting surfaces or the best orientation and tilt for solar collectors.
- Apply weather seal, such as pipe flashings and sealants, to roof penetrations and structural devices.
- Apply ultraviolet radiation protection to prevent degradation of plumbing.
- Fill water tanks and check tanks, pipes, and fittings for leaks.
- Cut, miter, and glue piping insulation to insulate plumbing pipes and fittings.
- Apply a sealer to make grout stain- and water-resistant.
- Mix, apply, and spread plaster, concrete, mortar, cement, mastic, glue or other adhesives to form a bed for the tiles, using brush, trowel and screed.
- Apply mortar to tile back, position the tile, and press or tap with trowel handle to affix tile to base.
- Level concrete and allow to dry.
- Prepare surfaces for tiling by attaching lath or waterproof paper, or by applying a cement mortar coat to a metal screen.
- Spread mastic or other adhesive base on roof deck to form base for promenade tile, using serrated spreader.
- Brush glue onto manila paper on which design has been drawn and position tiles, finished side down, onto paper.
- Align and straighten tile using levels, squares, and straightedges.
- Finish and dress the joints and wipe excess grout from between tiles, using damp sponge.
- Cut and shape tile to fit around obstacles and into odd spaces and corners, using hand and power cutting tools.
- Determine and implement the best layout to achieve a desired pattern.
- Study blueprints and examine surface to be covered to determine amount of material needed.
- Measure and mark surfaces to be tiled, following blueprints.
- Lay and set mosaic tiles to create decorative wall, mural, and floor designs.
- Mix and apply mortar or cement to edges and ends of drain tiles to seal halves and joints.
- Measure and cut metal lath to size for walls and ceilings, using tin snips.
- Install and anchor fixtures in designated positions, using hand tools.
- Remove and replace cracked or damaged tile.
- Cut tile backing to required size, using shears.
- Remove any old tile, grout and adhesive using chisels and scrapers and clean the surface carefully.
- Cut, surface, polish, and install marble and granite or install pre-cast terrazzo, granite or marble units.
- Assist customers in selection of tile and grout.
- Prepare cost and labor estimates, based on calculations of time and materials needed for project.
- Select and order tile and other items to be installed, such as bathroom accessories, walls, panels, and cabinets, according to specifications.
- Build underbeds and install anchor bolts, wires, and brackets.
- Apply a sealer to make grout stain- and water-resistant.
- Mix, apply, and spread plaster, concrete, mortar, cement, mastic, glue or other adhesives to form a bed for the tiles, using brush, trowel and screed.
- Apply mortar to tile back, position the tile, and press or tap with trowel handle to affix tile to base.
- Level concrete and allow to dry.
- Prepare surfaces for tiling by attaching lath or waterproof paper, or by applying a cement mortar coat to a metal screen.
- Spread mastic or other adhesive base on roof deck to form base for promenade tile, using serrated spreader.
- Brush glue onto manila paper on which design has been drawn and position tiles, finished side down, onto paper.
- Cement the edges of the paved area.
- Prepare base for installation by removing unstable or unsuitable materials, compacting and grading the soil, draining or stabilizing weak or saturated soils and taking measures to prevent water penetration and migration of bedding sand.
- Supply and place base materials, edge restraints, bedding sand and jointing sand.
- Sweep sand into the joints and compact pavement until the joints are full.
- Screed sand level to an even thickness, and recheck sand exposed to elements, raking and rescreeding if necessary.
- Compact bedding sand and pavers to finish the paved area, using a plate compactor.
- Discuss the design with the client.
- Set pavers, aligning and spacing them correctly.
- Cut paving stones to size and for edges, using a splitter and a masonry saw.
- Design paver installation layout pattern and create markings for directional references of joints and stringlines.
- Sweep sand from the surface prior to opening to traffic.
- Resurface an outside area with cobblestones, terracotta tiles, concrete or other materials.
- Cement the edges of the paved area.
- Prepare base for installation by removing unstable or unsuitable materials, compacting and grading the soil, draining or stabilizing weak or saturated soils and taking measures to prevent water penetration and migration of bedding sand.
- Supply and place base materials, edge restraints, bedding sand and jointing sand.
- Sweep sand into the joints and compact pavement until the joints are full.
- Screed sand level to an even thickness, and recheck sand exposed to elements, raking and rescreeding if necessary.
- Compact bedding sand and pavers to finish the paved area, using a plate compactor.
- Roll and press sheet wall and floor covering into cement base to smooth and finish surface, using hand roller.
- Sweep, scrape, sand, or chip dirt and irregularities to clean base surfaces, correcting imperfections that may show through the covering.
- Form a smooth foundation by stapling plywood or Masonite over the floor or by brushing waterproof compound onto surface and filling cracks with plaster, putty, or grout to seal pores.
- Apply adhesive cement to floor or wall material to join and adhere foundation material.
- Cut flooring material to fit around obstructions.
- Inspect surface to be covered to ensure that it is firm and dry.
- Trim excess covering materials, tack edges, and join sections of covering material to form tight joint.
- Measure and mark guidelines on surfaces or foundations, using chalk lines and dividers.
- Cut covering and foundation materials, according to blueprints and sketches.
- Determine traffic areas and decide location of seams.
- Lay out, position, and apply shock-absorbing, sound-deadening, or decorative coverings to floors, walls, and cabinets, following guidelines to keep courses straight and create designs.
- Remove excess cement to clean finished surface.
- Disconnect and remove appliances, light fixtures, and worn floor and wall covering from floors, walls, and cabinets.
- Heat and soften floor covering materials to patch cracks or fit floor coverings around irregular surfaces, using blowtorch.
- Roll and press sheet wall and floor covering into cement base to smooth and finish surface, using hand roller.
- Sweep, scrape, sand, or chip dirt and irregularities to clean base surfaces, correcting imperfections that may show through the covering.
- Form a smooth foundation by stapling plywood or Masonite over the floor or by brushing waterproof compound onto surface and filling cracks with plaster, putty, or grout to seal pores.
- Apply adhesive cement to floor or wall material to join and adhere foundation material.
- Apply caulk, sealants, or other agents to installed surfaces.
- Provide assistance in the preparation, installation, repair, or rebuilding of tile, brick, or stone surfaces.
- Locate and supply materials to masons for installation, following drawings or numbered sequences.
- Remove damaged tile, brick, or mortar, and clean or prepare surfaces, using pliers, hammers, chisels, drills, wire brushes, or metal wire anchors.
- Mix mortar, plaster, and grout, manually or using machines, according to standard formulas.
- Erect scaffolding or other installation structures.
- Cut materials to specified sizes for installation, using power saws or tile cutters.
- Modify material moving, mixing, grouting, grinding, polishing, or cleaning procedures, according to installation or material requirements.
- Transport materials, tools, or machines to installation sites, manually or using conveyance equipment.
- Arrange or store materials, machines, tools, or equipment.
- Clean installation surfaces, equipment, tools, work sites, or storage areas, using water, chemical solutions, oxygen lances, or polishing machines.
- Move or position materials such as marble slabs, using cranes, hoists, or dollies.
- Remove excess grout or residue from tile or brick joints, using sponges or trowels.
- Apply grout between joints of bricks or tiles, using grouting trowels.
- Correct surface imperfections or fill chipped, cracked, or broken bricks or tiles, using fillers, adhesives, or grouting materials.
- Apply caulk, sealants, or other agents to installed surfaces.
- Provide assistance in the preparation, installation, repair, or rebuilding of tile, brick, or stone surfaces.
- Locate and supply materials to masons for installation, following drawings or numbered sequences.
- Remove damaged tile, brick, or mortar, and clean or prepare surfaces, using pliers, hammers, chisels, drills, wire brushes, or metal wire anchors.
- Secure stakes to grids for constructions of footings, nail scabs to footing forms, and vibrate and float concrete.
- Construct forms and assist in raising them to the required elevation.
- Glue and clamp edges or joints of assembled parts.
- Cut tile or linoleum to fit and spread adhesives on flooring for installation.
- Clean work areas, machines, or equipment, to maintain a clean and safe job site.
- Fasten timbers or lumber with glue, screws, pegs, or nails and install hardware.
- Perform tie spacing layout and measure, mark, drill or cut.
- Select tools, equipment, or materials from storage and transport items to work site.
- Drill holes in timbers or lumber.
- Cut timbers, lumber, or paneling to specified dimensions.
- Position and hold timbers, lumber, or paneling in place for fastening or cutting.
- Align, straighten, plumb, or square forms for installation.
- Hold plumb bobs, sighting rods, or other equipment to aid in establishing reference points and lines.
- Erect scaffolding, shoring, or braces.
- Install handrails under the direction of a carpenter.
- Smooth or sand surfaces to remove ridges, tool marks, glue, or caulking.
- Cut and install insulating or sound-absorbing material.
- Cover surfaces with laminated plastic covering material.
- Secure stakes to grids for constructions of footings, nail scabs to footing forms, and vibrate and float concrete.
- Construct forms and assist in raising them to the required elevation.
- Glue and clamp edges or joints of assembled parts.
- Cut tile or linoleum to fit and spread adhesives on flooring for installation.
- Spray ties, fishplates, or joints with oil to protect them from weathering.
- Clean, grade, or level ballast on railroad tracks.
- Drive graders, tamping machines, brooms, or ballast spreading machines to redistribute gravel or ballast between rails.
- Paint railroad signs, such as speed limits or gate-crossing warnings.
- Patrol assigned track sections so that damaged or broken track can be located and reported.
- Repair or adjust track switches, using wrenches and replacement parts.
- Weld sections of track together, such as switch points and frogs.
- Observe leveling indicator arms to verify levelness and alignment of tracks.
- Operate single- or multiple-head spike driving machines to drive spikes into ties and secure rails.
- Operate track wrenches to tighten or loosen bolts at joints that hold ends of rails together.
- Cut rails to specified lengths, using rail saws.
- Lubricate machines, change oil, or fill hydraulic reservoirs to specified levels.
- Drill holes through rails, tie plates, or fishplates for insertion of bolts or spikes, using power drills.
- Clean tracks or clear ice or snow from tracks or switch boxes.
- Raise rails, using hydraulic jacks, to allow for tie removal and replacement.
- Adjust controls of machines that spread, shape, raise, level, or align track, according to specifications.
- Dress and reshape worn or damaged railroad switch points or frogs, using portable power grinders.
- Clean or make minor repairs to machines or equipment.
- Grind ends of new or worn rails to attain smooth joints, using portable grinders.
- Operate single- or multiple-head spike pullers to pull old spikes from ties.
- String and attach wire-guidelines machine to rails so that tracks or rails can be aligned or leveled.
- Engage mechanisms that lay tracks or rails to specified gauges.
- Drive vehicles that automatically move and lay tracks or rails over sections of track to be constructed, repaired, or maintained.
- Turn wheels of machines, using lever controls, to adjust guidelines for track alignments or grades, following specifications.
- Push controls to close grasping devices on track or rail sections so that they can be raised or moved.
- Operate tie-adzing machines to cut ties and permit insertion of fishplates that hold rails.
- Spray ties, fishplates, or joints with oil to protect them from weathering.
- Clean, grade, or level ballast on railroad tracks.
- Drive graders, tamping machines, brooms, or ballast spreading machines to redistribute gravel or ballast between rails.
- Paint railroad signs, such as speed limits or gate-crossing warnings.
- Place tiles, nail them to roof boards, and cover nailheads with roofing cement.
- Provide assistance to skilled roofers installing and repairing roofs, flashings, and surfaces.
- Apply shingles, gravel, or asphalt over the top layer of tar to protect the roofing material.
- Check to ensure that completed roofs are watertight.
- Sweep and clean roofs to prepare them for the application of new roofing materials.
- Locate worn or torn areas in roofs.
- Clean work areas and equipment.
- Maintain tools and equipment.
- Cover roofs with layers of roofing felt or asphalt strips before installing tile, slate, or composition materials.
- Remove old roofing materials.
- Unload materials and tools from work trucks, and unroll roofing as directed.
- Set ladders, scaffolds, and hoists in place for taking supplies to roofs.
- Attach roofing paper and composition shingles, using nails.
- Perform emergency leak repairs and general maintenance for a variety of roof types.
- Attach sheets of metal to roof boards or building frameworks when installing metal roofs.
- Hoist tar and roofing materials to roofs, using ropes and pulleys, or carry materials up ladders.
- Chop tar into small pieces, and heat chopped tar in kettles.
- Clear drains and downspouts and clean gutters.
- Place tiles, nail them to roof boards, and cover nailheads with roofing cement.
- Provide assistance to skilled roofers installing and repairing roofs, flashings, and surfaces.
- Apply shingles, gravel, or asphalt over the top layer of tar to protect the roofing material.
- Cover, seal, or finish insulated surfaces or access holes with plastic covers, canvas strips, sealants, tape, cement or asphalt mastic.
- Prepare surfaces for insulation application by brushing or spreading on adhesives, cement, or asphalt, or by attaching metal pins to surfaces.
- Measure and cut insulation for covering surfaces, using tape measures, handsaws, power saws, knives, or scissors.
- Fit, wrap, staple, or glue insulating materials to structures or surfaces, using hand tools or wires.
- Cover and line structures with blown or rolled forms of materials to insulate against cold, heat, or moisture, using saws, knives, rasps, trowels, blowers, or other tools and implements.
- Distribute insulating materials evenly into small spaces within floors, ceilings, or walls, using blowers and hose attachments, or cement mortars.
- Move controls, buttons, or levers to start blowers and regulate flow of materials through nozzles.
- Fill blower hoppers with insulating materials.
- Read blueprints, and select appropriate insulation, based on space characteristics and the heat retaining or excluding characteristics of the material.
- Remove old insulation, such as asbestos, following safety procedures.
- Cover, seal, or finish insulated surfaces or access holes with plastic covers, canvas strips, sealants, tape, cement or asphalt mastic.
- Prepare surfaces for insulation application by brushing or spreading on adhesives, cement, or asphalt, or by attaching metal pins to surfaces.
- Cover, seal, or finish insulated surfaces or access holes with plastic covers, canvas strips, sealants, tape, cement, or asphalt mastic.
- Prepare surfaces for insulation application by brushing or spreading on adhesives, cement, or asphalt, or by attaching metal pins to surfaces.
- Measure and cut insulation for covering surfaces, using tape measures, handsaws, knives, and scissors.
- Apply, remove, and repair insulation on industrial equipment, pipes, ductwork, or other mechanical systems such as heat exchangers, tanks, and vessels, to help control noise and maintain temperatures.
- Select appropriate insulation, such as fiberglass, Styrofoam, or cork, based on the heat retaining or excluding characteristics of the material.
- Fit insulation around obstructions, and shape insulating materials and protective coverings as required.
- Determine the amounts and types of insulation needed, and methods of installation, based on factors such as location, surface shape, and equipment use.
- Install sheet metal around insulated pipes with screws to protect the insulation from weather conditions or physical damage.
- Read blueprints and specifications to determine job requirements.
- Distribute insulating materials evenly into small spaces within floors, ceilings, or walls, using blowers and hose attachments or cement mortar.
- Remove or seal off old asbestos insulation, following safety procedures.
- Fill blower hoppers with insulating materials.
- Move controls, buttons, or levers to start blowers, and to regulate flow of materials through nozzles.
- Cover, seal, or finish insulated surfaces or access holes with plastic covers, canvas strips, sealants, tape, cement, or asphalt mastic.
- Prepare surfaces for insulation application by brushing or spreading on adhesives, cement, or asphalt, or by attaching metal pins to surfaces.
- Apply filler compound and coats of finish to floors to seal wood.
- Buff and vacuum floors to ensure their cleanliness prior to the application of finish.
- Scrape and sand floor edges and areas inaccessible to floor sanders, using scrapers, disk-type sanders, and sandpaper.
- Inspect floors for smoothness.
- Attach sandpaper to rollers of sanding machines.
- Guide sanding machines over surfaces of floors until surfaces are smooth.
- Remove excess glue from joints, using knives, scrapers, or wood chisels.
- Apply filler compound and coats of finish to floors to seal wood.
- Spray or spread refractory material over brickwork to protect against deterioration.
- Measure distance from reference points and mark guidelines to lay out work, using plumb bobs and levels.
- Construct corners by fastening in plumb position a corner pole or building a corner pyramid of bricks, and filling in between the corners using a line from corner to corner to guide each course, or layer, of brick.
- Apply and smooth mortar or other mixture over work surface.
- Calculate angles and courses and determine vertical and horizontal alignment of courses.
- Break or cut bricks, tiles, or blocks to size, using trowel edge, hammer, or power saw.
- Interpret blueprints and drawings to determine specifications and to calculate the materials required.
- Remove excess mortar with trowels and hand tools, and finish mortar joints with jointing tools, for a sealed, uniform appearance.
- Fasten or fuse brick or other building material to structure with wire clamps, anchor holes, torch, or cement.
- Clean working surface to remove scale, dust, soot, or chips of brick and mortar, using broom, wire brush, or scraper.
- Examine brickwork or structure to determine need for repair.
- Mix specified amounts of sand, clay, dirt, or mortar powder with water to form refractory mixtures.
- Remove burned or damaged brick or mortar, using sledgehammer, crowbar, chipping gun, or chisel.
- Lay and align bricks, blocks, or tiles to build or repair structures or high temperature equipment, such as cupola, kilns, ovens, or furnaces.
- Spray or spread refractory material over brickwork to protect against deterioration.
- Apply weather sealing to array, building, or support mechanisms.
- Install photovoltaic (PV) systems in accordance with codes and standards, using drawings, schematics, and instructions.
- Assemble solar modules, panels, or support structures, as specified.
- Determine appropriate sizes, ratings, and locations for all system overcurrent devices, disconnect devices, grounding equipment, and surge suppression equipment.
- Install module array interconnect wiring, implementing measures to disable arrays during installation.
- Identify methods for laying out, orienting, and mounting modules or arrays to ensure efficient installation, electrical configuration, or system maintenance.
- Identify electrical, environmental, and safety hazards associated with photovoltaic (PV) installations.
- Examine designs to determine current requirements for all parts of the photovoltaic (PV) system electrical circuit.
- Check electrical installation for proper wiring, polarity, grounding, or integrity of terminations.
- Test operating voltages to ensure operation within acceptable limits for power conditioning equipment, such as inverters and controllers.
- Identify and resolve any deficiencies in photovoltaic (PV) system installation or materials.
- Program, adjust, or configure inverters and controls for desired set points and operating modes.
- Identify installation locations with proper orientation, area, solar access, or structural integrity for photovoltaic (PV) arrays.
- Visually inspect and test photovoltaic (PV) modules or systems.
- Install required labels on solar system components and hardware.
- Determine photovoltaic (PV) system designs or configurations based on factors such as customer needs, expectations, and site conditions.
- Determine materials, equipment, and installation sequences necessary to maximize installation efficiency.
- Determine connection interfaces for additional subpanels or for connecting photovoltaic (PV) systems with utility services or other power generation sources.
- Perform routine photovoltaic (PV) system maintenance on modules, arrays, batteries, power conditioning equipment, safety systems, structural systems, weather sealing, or balance of systems equipment.
- Install active solar systems, including solar collectors, concentrators, pumps, or fans.
- Activate photovoltaic (PV) systems to verify system functionality and conformity to performance expectations.
- Demonstrate system functionality and performance, including start-up, shut-down, normal operation, and emergency or bypass operations.
- Measure and analyze system performance and operating parameters to assess operating condition of systems or equipment.
- Compile or maintain records of system operation, performance, and maintenance.
- Diagram layouts and locations for photovoltaic (PV) arrays and equipment, including existing building or site features.
- Select mechanical designs, installation equipment, or installation plans that conform to environmental, architectural, structural, site, and code requirements.
- Apply weather sealing to array, building, or support mechanisms.