How do they match: Tile and Stone Setters

  • Acoustical Material Worker
  • Marble Worker
  • Mosaic Worker

  • Apply hard tile, stone, and comparable materials to walls, floors, ceilings, countertops, and roof decks.

  • Remove and replace cracked or damaged tile.
  • Remove any old tile, grout and adhesive using chisels and scrapers and clean the surface carefully.
  • Prepare cost and labor estimates, based on calculations of time and materials needed for project.
  • Study blueprints and examine surface to be covered to determine amount of material needed.

  • Remove excess materials from finished construction projects.
  • Remove worn, damaged or outdated materials from work areas.
  • Align masonry materials.
  • Apply adhesives to construction materials.
  • Clean surfaces in preparation for work activities.
  • Cut carpet, vinyl or other flexible materials.
  • Cut tile, stone, or other masonry materials.
  • Estimate materials requirements for projects.
  • Install masonry materials.
  • Mark reference points on construction materials.
  • Measure work site dimensions.
  • Measure materials or objects for installation or assembly.
  • Mix substances or compounds needed for work activities.
  • Order construction or extraction materials or equipment.
  • Review blueprints or specifications to determine work requirements.
  • Select construction materials.
  • Smooth surfaces with abrasive materials or tools.