How do they match: Tile and Stone Setters

  • Level concrete and allow to dry.
  • Mix and apply mortar or cement to edges and ends of drain tiles to seal halves and joints.
  • Mix, apply, and spread plaster, concrete, mortar, cement, mastic, glue or other adhesives to form a bed for the tiles, using brush, trowel and screed.
  • Prepare cost and labor estimates, based on calculations of time and materials needed for project.
  • Prepare surfaces for tiling by attaching lath or waterproof paper, or by applying a cement mortar coat to a metal screen.

  • Estimate construction project labor requirements.
  • Spread concrete or other aggregate mixtures.