How do they match: Tile and Stone Setters

  • Prepare cost and labor estimates, based on calculations of time and materials needed for project.
  • Prepare surfaces for tiling by attaching lath or waterproof paper, or by applying a cement mortar coat to a metal screen.
  • Mix, apply, and spread plaster, concrete, mortar, cement, mastic, glue or other adhesives to form a bed for the tiles, using brush, trowel and screed.
  • Spread mastic or other adhesive base on roof deck to form base for promenade tile, using serrated spreader.

  • Clean surfaces in preparation for work activities.