How do they match: Drywall and Ceiling Tile Installers

  • Lath Hand
  • Sheet Rock Nailer

  • Nail channels or wood furring strips to surfaces to provide mounting for tile.
  • Apply cement to backs of tiles and press tiles into place, aligning them with layout marks or joints of previously laid tile.
  • Fasten metal or rockboard lath to the structural framework of walls, ceilings, or partitions of buildings, using nails, screws, staples, or wire-ties.
  • Fit and fasten wallboard or drywall into position on wood or metal frameworks, using glue, nails, or screws.
  • Mount tile, using adhesives, or by nailing, screwing, stapling, or wire-tying lath directly to structural frameworks.

  • Clean surfaces in preparation for work activities.