How do they match: Drywall and Ceiling Tile Installers

  • Drywall and Ceiling Tile Installers

  • Ceiling Installer
  • Acoustical Ceiling Installer
  • Acoustical Installer
  • Dry Wall Installer
  • Drywall Installer
  • Sheet Rock Installer

  • Apply plasterboard or other wallboard to ceilings or interior walls of buildings. Apply or mount acoustical tiles or blocks, strips, or sheets of shock-absorbing materials to ceilings and walls of buildings to reduce or reflect sound. Materials may be of decorative quality. Includes lathers who fasten wooden, metal, or rockboard lath to walls, ceilings, or partitions of buildings to provide support base for plaster, fireproofing, or acoustical material.

  • Install blanket insulation between studs and tack plastic moisture barriers over insulation.
  • Install horizontal and vertical metal or wooden studs to frames so that wallboard can be attached to interior walls.
  • Install metal lath where plaster applications will be exposed to weather or water, or for curved or irregular surfaces.
  • Apply or mount acoustical tile or blocks, strips, or sheets of shock-absorbing materials to ceilings or walls of buildings to reduce reflection of sound or to decorate rooms.
  • Assemble or install metal framing or decorative trim for windows, doorways, or vents.
  • Cut and screw together metal channels to make floor or ceiling frames, according to plans for the location of rooms or hallways.
  • Fasten metal or rockboard lath to the structural framework of walls, ceilings, or partitions of buildings, using nails, screws, staples, or wire-ties.
  • Hang drywall panels on metal frameworks of walls and ceilings in offices, schools, or other large buildings, using lifts or hoists to adjust panel heights, when necessary.
  • Read blueprints or other specifications to determine methods of installation, work procedures, or material or tool requirements.
  • Seal joints between ceiling tiles and walls.
  • Suspend angle iron grids or channel irons from ceilings, using wire.

  • Install building fixtures.
  • Install insulation in equipment or structures.
  • Install masonry materials.
  • Install metal structural components.
  • Install trim or paneling.
  • Install wooden structural components.
  • Cut metal components for installation.
  • Cut wood components for installation.
  • Measure materials or objects for installation or assembly.
  • Trim excess material from installations.