How do they match: Terrazzo Workers and Finishers

  • Position and secure moisture membrane and wire mesh in preparation for pouring base materials for terrazzo installation.
  • Measure designated amounts of ingredients for terrazzo or grout, according to standard formulas and specifications, using graduated containers and scales, and load ingredients into portable mixer.
  • Repair concrete by cutting out damaged areas, drilling holes for reinforcing rods, and positioning reinforcing rods, using power saw and drill.
  • Signal truck driver to position truck to facilitate pouring concrete and move chute to direct concrete on forms.
  • Wash polished terrazzo surface, using cleaner and water, and apply sealer and curing agent according to manufacturer's specifications, using brush or sprayer.
  • Wet concrete surface and rub with stone to smooth surface and obtain specified finish.

  • Position construction forms or molds.
  • Position structural components.
  • Signal equipment operators to indicate proper equipment positioning.