How do they match: Fence Erectors

  • Align posts, by lines or sighting, and verify vertical alignment of posts, using plumb bobs or spirit levels.
  • Establish the location for a fence, and gather information needed to ensure that there are no electric cables or water lines in the area.
  • Measure and lay out fence lines and mark posthole positions, following instructions, drawings, or specifications.

  • Communicate with clients about products, procedures, and policies.
  • Measure work site dimensions.
  • Mix substances or compounds needed for work activities.