How do they match: Tile and Stone Setters

  • Prepare cost and labor estimates, based on calculations of time and materials needed for project.
  • Prepare surfaces for tiling by attaching lath or waterproof paper, or by applying a cement mortar coat to a metal screen.
  • Apply mortar to tile back, position the tile, and press or tap with trowel handle to affix tile to base.
  • Brush glue onto manila paper on which design has been drawn and position tiles, finished side down, onto paper.
  • Cut, surface, polish, and install marble and granite or install pre-cast terrazzo, granite or marble units.
  • Install and anchor fixtures in designated positions, using hand tools.
  • Lay and set mosaic tiles to create decorative wall, mural, and floor designs.

  • Apply adhesives to construction materials.
  • Clean surfaces in preparation for work activities.
  • Determine construction project layouts.
  • Estimate construction project costs.
  • Estimate construction project labor requirements.
  • Mark reference points on construction materials.
  • Order construction or extraction materials or equipment.
  • Remove excess materials from finished construction projects.
  • Select construction materials.