|
| Core |
Align and straighten tile using levels, squares, and straightedges.
|
|
| Core |
Finish and dress the joints and wipe excess grout from between tiles, using damp sponge.
|
|
| Core |
Cut and shape tile to fit around obstacles and into odd spaces and corners, using hand and power cutting tools.
|
|
| Core |
Determine and implement the best layout to achieve a desired pattern.
|
|
| Core |
Mix, apply, and spread plaster, concrete, mortar, cement, mastic, glue or other adhesives to form a bed for the tiles, using brush, trowel and screed.
|
|
| Core |
Study blueprints and examine surface to be covered to determine amount of material needed.
|
|
| Core |
Measure and mark surfaces to be tiled, following blueprints.
|
|
| Core |
Lay and set mosaic tiles to create decorative wall, mural, and floor designs.
|
|
| Core |
Apply mortar to tile back, position the tile, and press or tap with trowel handle to affix tile to base.
|
|
| Core |
Mix and apply mortar or cement to edges and ends of drain tiles to seal halves and joints.
|
|
| Core |
Apply a sealer to make grout stain- and water-resistant.
|
|
| Core |
Level concrete and allow to dry.
|
|
| Core |
Measure and cut metal lath to size for walls and ceilings, using tin snips.
|
|
| Core |
Install and anchor fixtures in designated positions, using hand tools.
|
|
| Core |
Prepare surfaces for tiling by attaching lath or waterproof paper, or by applying a cement mortar coat to a metal screen.
|
|
| Core |
Remove and replace cracked or damaged tile.
|
|
| Core |
Cut tile backing to required size, using shears.
|
|
| Core |
Remove any old tile, grout and adhesive using chisels and scrapers and clean the surface carefully.
|
|
| Core |
Cut, surface, polish, and install marble and granite or install pre-cast terrazzo, granite or marble units.
|
|
| Supplemental |
Spread mastic or other adhesive base on roof deck to form base for promenade tile, using serrated spreader.
|
|
| Supplemental |
Assist customers in selection of tile and grout.
|
|
| Supplemental |
Prepare cost and labor estimates, based on calculations of time and materials needed for project.
|
|
| Supplemental |
Brush glue onto manila paper on which design has been drawn and position tiles, finished side down, onto paper.
|
|
| Supplemental |
Select and order tile and other items to be installed, such as bathroom accessories, walls, panels, and cabinets, according to specifications.
|
|
| Supplemental |
Build underbeds and install anchor bolts, wires, and brackets.
|