Job Duties Custom List 47-2181.00 — Roofers
- Cement or nail flashing strips of metal or shingle over joints to make them watertight.
Occupations with related tasks Save Table: XLSX CSV
- Cover roofs with layers of roofing felt or asphalt strips before installing tile, slate, or composition materials.
- Place tiles, nail them to roof boards, and cover nailheads with roofing cement.
- Attach roofing paper and composition shingles, using nails.
- Perform emergency leak repairs and general maintenance for a variety of roof types.
- Attach sheets of metal to roof boards or building frameworks when installing metal roofs.
- Apply shingles, gravel, or asphalt over the top layer of tar to protect the roofing material.
- Set ladders, scaffolds, and hoists in place for taking supplies to roofs.
- Provide assistance to skilled roofers installing and repairing roofs, flashings, and surfaces.
- Check to ensure that completed roofs are watertight.
- Sweep and clean roofs to prepare them for the application of new roofing materials.
- Locate worn or torn areas in roofs.
- Clean work areas and equipment.
- Maintain tools and equipment.
- Remove old roofing materials.
- Unload materials and tools from work trucks, and unroll roofing as directed.
- Hoist tar and roofing materials to roofs, using ropes and pulleys, or carry materials up ladders.
- Chop tar into small pieces, and heat chopped tar in kettles.
- Clear drains and downspouts and clean gutters.
- Cover roofs with layers of roofing felt or asphalt strips before installing tile, slate, or composition materials.
- Place tiles, nail them to roof boards, and cover nailheads with roofing cement.
- Attach roofing paper and composition shingles, using nails.
- Perform emergency leak repairs and general maintenance for a variety of roof types.
- Attach sheets of metal to roof boards or building frameworks when installing metal roofs.
- Apply shingles, gravel, or asphalt over the top layer of tar to protect the roofing material.
- Set ladders, scaffolds, and hoists in place for taking supplies to roofs.
- Provide assistance to skilled roofers installing and repairing roofs, flashings, and surfaces.
- Apply mortar to tile back, position the tile, and press or tap with trowel handle to affix tile to base.
- Prepare surfaces for tiling by attaching lath or waterproof paper, or by applying a cement mortar coat to a metal screen.
- Spread mastic or other adhesive base on roof deck to form base for promenade tile, using serrated spreader.
- Brush glue onto manila paper on which design has been drawn and position tiles, finished side down, onto paper.
- Finish and dress the joints and wipe excess grout from between tiles, using damp sponge.
- Mix, apply, and spread plaster, concrete, mortar, cement, mastic, glue or other adhesives to form a bed for the tiles, using brush, trowel and screed.
- Lay and set mosaic tiles to create decorative wall, mural, and floor designs.
- Level concrete and allow to dry.
- Install and anchor fixtures in designated positions, using hand tools.
- Cut, surface, polish, and install marble and granite or install pre-cast terrazzo, granite or marble units.
- Build underbeds and install anchor bolts, wires, and brackets.
- Align and straighten tile using levels, squares, and straightedges.
- Cut and shape tile to fit around obstacles and into odd spaces and corners, using hand and power cutting tools.
- Determine and implement the best layout to achieve a desired pattern.
- Study blueprints and examine surface to be covered to determine amount of material needed.
- Measure and mark surfaces to be tiled, following blueprints.
- Mix and apply mortar or cement to edges and ends of drain tiles to seal halves and joints.
- Apply a sealer to make grout stain- and water-resistant.
- Measure and cut metal lath to size for walls and ceilings, using tin snips.
- Remove and replace cracked or damaged tile.
- Cut tile backing to required size, using shears.
- Remove any old tile, grout and adhesive using chisels and scrapers and clean the surface carefully.
- Assist customers in selection of tile and grout.
- Prepare cost and labor estimates, based on calculations of time and materials needed for project.
- Select and order tile and other items to be installed, such as bathroom accessories, walls, panels, and cabinets, according to specifications.
- Apply mortar to tile back, position the tile, and press or tap with trowel handle to affix tile to base.
- Prepare surfaces for tiling by attaching lath or waterproof paper, or by applying a cement mortar coat to a metal screen.
- Spread mastic or other adhesive base on roof deck to form base for promenade tile, using serrated spreader.
- Brush glue onto manila paper on which design has been drawn and position tiles, finished side down, onto paper.
- Finish and dress the joints and wipe excess grout from between tiles, using damp sponge.
- Mix, apply, and spread plaster, concrete, mortar, cement, mastic, glue or other adhesives to form a bed for the tiles, using brush, trowel and screed.
- Lay and set mosaic tiles to create decorative wall, mural, and floor designs.
- Level concrete and allow to dry.
- Install and anchor fixtures in designated positions, using hand tools.
- Cut, surface, polish, and install marble and granite or install pre-cast terrazzo, granite or marble units.
- Build underbeds and install anchor bolts, wires, and brackets.
- Apply adhesives to the backs of paper strips, using brushes, or dunk strips of prepasted wallcovering in water, wiping off any excess adhesive.
- Apply thinned glue to waterproof porous surfaces, using brushes, rollers, or pasting machines.
- Mix paste, using paste powder and water, and brush paste onto surfaces.
- Apply sizing to seal surfaces and maximize adhesion of coverings to surfaces.
- Set up equipment, such as pasteboards and scaffolds.
- Smooth strips or sections of paper with brushes or rollers to remove wrinkles and bubbles and to smooth joints.
- Trim rough edges from strips, using straightedges and trimming knives.
- Trim excess material at ceilings or baseboards, using knives.
- Check finished wallcoverings for proper alignment, pattern matching, and neatness of seams.
- Mark vertical guidelines on walls to align strips, using plumb bobs and chalk lines.
- Cover interior walls and ceilings of rooms with decorative wallpaper or fabric, using hand tools.
- Measure and cut strips from rolls of wallpaper or fabric, using shears or razors.
- Place strips or sections of paper on surfaces, aligning section edges and patterns.
- Fill holes, cracks, and other surface imperfections preparatory to covering surfaces.
- Measure surfaces or review work orders to estimate the quantities of materials needed.
- Smooth rough spots on walls and ceilings, using sandpaper.
- Remove old paper, using water, steam machines, or solvents and scrapers.
- Staple or tack advertising posters onto fences, walls, billboards, or poles.
- Remove paint, varnish, dirt, and grease from surfaces, using paint remover and water soda solutions.
- Apply acetic acid to damp plaster to prevent lime from bleeding through paper.
- Apply adhesives to the backs of paper strips, using brushes, or dunk strips of prepasted wallcovering in water, wiping off any excess adhesive.
- Apply thinned glue to waterproof porous surfaces, using brushes, rollers, or pasting machines.
- Mix paste, using paste powder and water, and brush paste onto surfaces.
- Apply sizing to seal surfaces and maximize adhesion of coverings to surfaces.
- Set up equipment, such as pasteboards and scaffolds.
- Glue and clamp edges or joints of assembled parts.
- Cut tile or linoleum to fit and spread adhesives on flooring for installation.
- Fasten timbers or lumber with glue, screws, pegs, or nails and install hardware.
- Erect scaffolding, shoring, or braces.
- Construct forms and assist in raising them to the required elevation.
- Install handrails under the direction of a carpenter.
- Secure stakes to grids for constructions of footings, nail scabs to footing forms, and vibrate and float concrete.
- Cut and install insulating or sound-absorbing material.
- Clean work areas, machines, or equipment, to maintain a clean and safe job site.
- Perform tie spacing layout and measure, mark, drill or cut.
- Select tools, equipment, or materials from storage and transport items to work site.
- Drill holes in timbers or lumber.
- Cut timbers, lumber, or paneling to specified dimensions.
- Position and hold timbers, lumber, or paneling in place for fastening or cutting.
- Align, straighten, plumb, or square forms for installation.
- Hold plumb bobs, sighting rods, or other equipment to aid in establishing reference points and lines.
- Smooth or sand surfaces to remove ridges, tool marks, glue, or caulking.
- Cover surfaces with laminated plastic covering material.
- Glue and clamp edges or joints of assembled parts.
- Cut tile or linoleum to fit and spread adhesives on flooring for installation.
- Fasten timbers or lumber with glue, screws, pegs, or nails and install hardware.
- Erect scaffolding, shoring, or braces.
- Construct forms and assist in raising them to the required elevation.
- Install handrails under the direction of a carpenter.
- Secure stakes to grids for constructions of footings, nail scabs to footing forms, and vibrate and float concrete.
- Cut and install insulating or sound-absorbing material.
- Spread and smooth cementing material over tape, using trowels or floating machines to blend joints with wall surfaces.
- Use mechanical applicators that spread compounds and embed tape in one operation.
- Install metal molding at wall corners to secure wallboard.
- Apply texturizing compounds or primers to walls or ceilings before final finishing, using trowels, brushes, rollers, or spray guns.
- Spread sealing compound between boards or panels or over cracks, holes, nail heads, or screw heads, using trowels, broadknives, or spatulas.
- Press paper tape over joints to embed tape into sealing compound and to seal joints.
- Apply additional coats to fill in holes and make surfaces smooth.
- Seal joints between plasterboard or other wallboard to prepare wall surfaces for painting or papering.
- Sand or patch nicks or cracks in plasterboard or wallboard.
- Mix sealing compounds by hand or with portable electric mixers.
- Work on high ceilings, using scaffolding or other tools, such as stilts.
- Select the correct sealing compound or tape.
- Countersink nails or screws below surfaces of walls before applying sealing compounds, using hammers or screwdrivers.
- Remove extra compound after surfaces have been covered sufficiently.
- Check adhesives to ensure that they will work and will remain durable.
- Sand rough spots of dried cement between applications of compounds.
- Spread and smooth cementing material over tape, using trowels or floating machines to blend joints with wall surfaces.
- Use mechanical applicators that spread compounds and embed tape in one operation.
- Install metal molding at wall corners to secure wallboard.
- Apply texturizing compounds or primers to walls or ceilings before final finishing, using trowels, brushes, rollers, or spray guns.
- Secure metal roof panels in place by interlocking and fastening grooved panel edges.
- Fasten roof panel edges or machine-made moldings to structures by nailing or welding.
- Install assemblies, such as flashing, pipes, tubes, heating and air conditioning ducts, furnace casings, rain gutters, or downspouts in supportive frameworks.
- Maintain equipment, making repairs or modifications when necessary.
- Fabricate ducts for high efficiency heating, ventilating, and air conditioning (HVAC) systems to maximize efficiency of systems.
- Fasten seams or joints together with welds, bolts, cement, rivets, solder, caulks, metal drive clips, or bonds to assemble components into products or to repair sheet metal items.
- Transport prefabricated parts to construction sites for assembly and installation.
- Hire, train, or supervise new employees or apprentices.
- Lay out, measure, and mark dimensions and reference lines on material, such as roofing panels, using calculators, scribes, dividers, squares, or rulers.
- Fabricate or alter parts at construction sites, using shears, hammers, punches, or drills.
- Determine project requirements, such as scope, assembly sequences, or required methods or materials, using blueprints, drawings, or written or verbal instructions.
- Maneuver completed roofing units into position for installation.
- Select gauges or types of sheet metal or nonmetallic material, according to product specifications.
- Shape metal material over anvils, blocks, or other forms, using hand tools.
- Trim, file, grind, deburr, buff, or smooth surfaces, seams, or joints of assembled parts, using hand tools or portable power tools.
- Inspect individual parts, assemblies, or installations, using measuring instruments, such as calipers, scales, or micrometers.
- Develop or lay out patterns, using computerized metalworking equipment.
- Convert blueprints into shop drawings to be followed in the construction or assembly of sheet metal products.
- Perform sheet metal work necessary for solar panel installations.
- Verify that heating, ventilating, and air conditioning (HVAC) systems are designed, installed, and calibrated in accordance with green certification standards, such as those of Leadership in Energy and Environmental Design (LEED).
- Perform building commissioning activities by completing mechanical inspections of a building's water, lighting, or heating, ventilating, and air conditioning (HVAC) systems.
- Finish parts, using hacksaws or hand, rotary, or squaring shears.
- Secure metal roof panels in place by interlocking and fastening grooved panel edges.
- Fasten roof panel edges or machine-made moldings to structures by nailing or welding.
- Install assemblies, such as flashing, pipes, tubes, heating and air conditioning ducts, furnace casings, rain gutters, or downspouts in supportive frameworks.
- Spread roofing paper on surface of foundation, and spread concrete onto roofing paper with trowel to form terrazzo base.
- Spread, level, and smooth concrete, using rake, shovel, hand or power trowel, hand or power screed, and float.
- Mold expansion joints and edges, using edging tools, jointers, and straightedge.
- Signal truck driver to position truck to facilitate pouring concrete, and move chute to direct concrete on forms.
- Produce rough concrete surface, using broom.
- Apply hardening and sealing compounds to cure surface of concrete, and waterproof or restore surface.
- Operate power vibrator to compact concrete.
- Install anchor bolts, steel plates, door sills and other fixtures in freshly poured concrete or pattern or stamp the surface to provide a decorative finish.
- Wet surface to prepare for bonding, fill holes and cracks with grout or slurry, and smooth, using trowel.
- Wet concrete surface, and rub with stone to smooth surface and obtain specified finish.
- Fabricate concrete beams, columns, and panels.
- Check the forms that hold the concrete to see that they are properly constructed.
- Set the forms that hold concrete to the desired pitch and depth, and align them.
- Monitor how the wind, heat, or cold affect the curing of the concrete throughout the entire process.
- Direct the casting of the concrete and supervise laborers who use shovels or special tools to spread it.
- Waterproof or restore concrete surfaces, using appropriate compounds.
- Mix cement, sand, and water to produce concrete, grout, or slurry, using hoe, trowel, tamper, scraper, or concrete-mixing machine.
- Chip, scrape, and grind high spots, ridges, and rough projections to finish concrete, using pneumatic chisels, power grinders, or hand tools.
- Cut out damaged areas, drill holes for reinforcing rods, and position reinforcing rods to repair concrete, using power saw and drill.
- Clean chipped area, using wire brush, and feel and observe surface to determine if it is rough or uneven.
- Build wooden molds, and clamp molds around area to be repaired, using hand tools.
- Sprinkle colored marble or stone chips, powdered steel, or coloring powder over surface to produce prescribed finish.
- Polish surface, using polishing or surfacing machine.
- Cut metal division strips, and press them into terrazzo base so that top edges form desired design or pattern.
- Push roller over surface to embed chips in surface.
- Apply muriatic acid to clean surface, and rinse with water.
- Spread roofing paper on surface of foundation, and spread concrete onto roofing paper with trowel to form terrazzo base.
- Spread, level, and smooth concrete, using rake, shovel, hand or power trowel, hand or power screed, and float.
- Mold expansion joints and edges, using edging tools, jointers, and straightedge.
- Signal truck driver to position truck to facilitate pouring concrete, and move chute to direct concrete on forms.
- Produce rough concrete surface, using broom.
- Apply hardening and sealing compounds to cure surface of concrete, and waterproof or restore surface.
- Operate power vibrator to compact concrete.
- Install anchor bolts, steel plates, door sills and other fixtures in freshly poured concrete or pattern or stamp the surface to provide a decorative finish.
- Wet surface to prepare for bonding, fill holes and cracks with grout or slurry, and smooth, using trowel.
- Wet concrete surface, and rub with stone to smooth surface and obtain specified finish.
- Fabricate concrete beams, columns, and panels.
- Assemble and cement sections of stained glass together.
- Install pre-assembled metal or wood frameworks for windows or doors to be fitted with glass panels, using hand tools.
- Fabricate or install metal sashes or moldings for glass installation, using aluminum or steel framing.
- Set glass doors into frames and bolt metal hinges, handles, locks, or other hardware to attach doors to frames and walls.
- Cut and attach mounting strips, metal or wood moldings, rubber gaskets, or metal clips to surfaces in preparation for mirror installation.
- Assemble, erect, or dismantle scaffolds, rigging, or hoisting equipment.
- Secure mirrors in position, using mastic cement, putty, bolts, or screws.
- Fasten glass panes into wood sashes or frames with clips, points, or moldings, adding weather seals or putty around pane edges to seal joints.
- Cut, assemble, fit, or attach metal-framed glass enclosures for showers, bathtubs, display cases, skylights, solariums, or other structures.
- Read and interpret blueprints or specifications to determine size, shape, color, type, or thickness of glass, location of framing, installation procedures, or staging or scaffolding materials required.
- Determine plumb of walls or ceilings, using plumb lines and levels.
- Operate cranes or hoists with suction cups to lift large, heavy pieces of glass.
- Cut, fit, install, repair, or replace glass or glass substitutes, such as plastic or aluminum, in building interiors or exteriors or in furniture or other products.
- Drive trucks to installation sites and unload mirrors, glass equipment, or tools.
- Load and arrange glass or mirrors onto delivery trucks, using suction cups or cranes to lift glass.
- Measure mirrors and dimensions of areas to be covered to determine work procedures.
- Pack spaces between moldings and glass with glazing compounds and trim excess material with glazing knives.
- Cut and remove broken glass prior to installing replacement glass.
- Measure and mark outlines or patterns on glass to indicate cutting lines.
- Grind or polish glass, smoothing edges when necessary.
- Score glass with cutters' wheels, breaking off excess glass by hand or with notched tools.
- Prepare glass for cutting by resting it on rack edges or against cutting tables and brushing thin layer of oil along cutting lines or dipping cutting tools in oil.
- Move furniture to clear work sites and cover floors or furnishings with drop cloths.
- Confer with customers to determine project requirements or to provide cost estimates.
- Select the type or color of glass or mirror according to specifications.
- Measure, cut, fit, and press anti-glare adhesive film to glass or spray glass with tinting solution to prevent light glare.
- Create patterns on glass by etching, sandblasting, or painting designs.
- Assemble and cement sections of stained glass together.
- Install pre-assembled metal or wood frameworks for windows or doors to be fitted with glass panels, using hand tools.
- Fabricate or install metal sashes or moldings for glass installation, using aluminum or steel framing.
- Set glass doors into frames and bolt metal hinges, handles, locks, or other hardware to attach doors to frames and walls.
- Cut and attach mounting strips, metal or wood moldings, rubber gaskets, or metal clips to surfaces in preparation for mirror installation.
- Assemble, erect, or dismantle scaffolds, rigging, or hoisting equipment.
- Secure mirrors in position, using mastic cement, putty, bolts, or screws.
- Fasten glass panes into wood sashes or frames with clips, points, or moldings, adding weather seals or putty around pane edges to seal joints.
- Cut, assemble, fit, or attach metal-framed glass enclosures for showers, bathtubs, display cases, skylights, solariums, or other structures.
- Spread roofing paper on surface of foundation and spread concrete onto roofing paper with trowel to form terrazzo base.
- Spread, level, or smooth concrete or terrazzo mixtures to form bases or finished surfaces, using rakes, shovels, hand or power trowels, hand or power screeds, or floats.
- Wet surface to prepare for bonding, fill holes and cracks with grout or slurry, and smooth with a trowel.
- Mold expansion joints and edges, using edging tools, jointers, or straightedges.
- Precast terrazzo blocks in wooden forms.
- Wet concrete surface and rub with stone to smooth surface and obtain specified finish.
- Produce rough concrete surface, using broom.
- Signal truck driver to position truck to facilitate pouring concrete and move chute to direct concrete on forms.
- Measure designated amounts of ingredients for terrazzo or grout, according to standard formulas and specifications, using graduated containers and scales, and load ingredients into portable mixer.
- Grind surfaces with a power grinder, or polish surfaces with polishing or surfacing machines.
- Cut metal division strips and press them into the terrazzo base for joints or changes of color to form designs or patterns or to help prevent cracks.
- Blend marble chip mixtures, place into panels, and push a roller over the surface to embed the chips.
- Modify mixing, grouting, grinding, or cleaning procedures, according to type of installation or material used.
- Grind curved surfaces or areas inaccessible to surfacing machine, such as stairways or cabinet tops, with portable hand grinder.
- Wash polished terrazzo surface, using cleaner and water, and apply sealer and curing agent according to manufacturer's specifications, using brush or sprayer.
- Position and secure moisture membrane and wire mesh in preparation for pouring base materials for terrazzo installation.
- Fill slight grinding depressions with matching grout material and hand-trowel for a smooth, uniform surface.
- Clean installation site, mixing and storage areas, tools, machines, and equipment, and store materials and equipment.
- Sprinkle colored marble or stone chips, powdered steel, or coloring powder over surface to produce prescribed finish.
- Mix cement, sand, and water to produce concrete, grout, or slurry, using hoe, trowel, tamper, scraper, or concrete-mixing machine.
- Chip, scrape, or grind high spots, ridges, or rough projections to finish concrete, using pneumatic chisel, hand chisel, or other hand tools.
- Move terrazzo installation materials, tools, machines, or work devices to work areas, manually or using wheelbarrow.
- Clean chipped area, using wire brush, and feel and observe surface to determine if it is rough or uneven.
- Repair concrete by cutting out damaged areas, drilling holes for reinforcing rods, and positioning reinforcing rods, using power saw and drill.
- Build wooden molds, clamping molds around areas to be repaired, or setting up frames to the proper depth and alignment.
- Remove frames when the foundation is dry.
- Spread roofing paper on surface of foundation and spread concrete onto roofing paper with trowel to form terrazzo base.
- Spread, level, or smooth concrete or terrazzo mixtures to form bases or finished surfaces, using rakes, shovels, hand or power trowels, hand or power screeds, or floats.
- Wet surface to prepare for bonding, fill holes and cracks with grout or slurry, and smooth with a trowel.
- Mold expansion joints and edges, using edging tools, jointers, or straightedges.
- Precast terrazzo blocks in wooden forms.
- Wet concrete surface and rub with stone to smooth surface and obtain specified finish.
- Produce rough concrete surface, using broom.
- Signal truck driver to position truck to facilitate pouring concrete and move chute to direct concrete on forms.
- Prepare surfaces for insulation application by brushing or spreading on adhesives, cement, or asphalt, or by attaching metal pins to surfaces.
- Apply, remove, and repair insulation on industrial equipment, pipes, ductwork, or other mechanical systems such as heat exchangers, tanks, and vessels, to help control noise and maintain temperatures.
- Fit insulation around obstructions, and shape insulating materials and protective coverings as required.
- Cover, seal, or finish insulated surfaces or access holes with plastic covers, canvas strips, sealants, tape, cement, or asphalt mastic.
- Install sheet metal around insulated pipes with screws to protect the insulation from weather conditions or physical damage.
- Distribute insulating materials evenly into small spaces within floors, ceilings, or walls, using blowers and hose attachments or cement mortar.
- Move controls, buttons, or levers to start blowers, and to regulate flow of materials through nozzles.
- Measure and cut insulation for covering surfaces, using tape measures, handsaws, knives, and scissors.
- Select appropriate insulation, such as fiberglass, Styrofoam, or cork, based on the heat retaining or excluding characteristics of the material.
- Determine the amounts and types of insulation needed, and methods of installation, based on factors such as location, surface shape, and equipment use.
- Read blueprints and specifications to determine job requirements.
- Remove or seal off old asbestos insulation, following safety procedures.
- Fill blower hoppers with insulating materials.
- Prepare surfaces for insulation application by brushing or spreading on adhesives, cement, or asphalt, or by attaching metal pins to surfaces.
- Apply, remove, and repair insulation on industrial equipment, pipes, ductwork, or other mechanical systems such as heat exchangers, tanks, and vessels, to help control noise and maintain temperatures.
- Fit insulation around obstructions, and shape insulating materials and protective coverings as required.
- Cover, seal, or finish insulated surfaces or access holes with plastic covers, canvas strips, sealants, tape, cement, or asphalt mastic.
- Install sheet metal around insulated pipes with screws to protect the insulation from weather conditions or physical damage.
- Distribute insulating materials evenly into small spaces within floors, ceilings, or walls, using blowers and hose attachments or cement mortar.
- Move controls, buttons, or levers to start blowers, and to regulate flow of materials through nozzles.
- Prepare surfaces for insulation application by brushing or spreading on adhesives, cement, or asphalt, or by attaching metal pins to surfaces.
- Fit, wrap, staple, or glue insulating materials to structures or surfaces, using hand tools or wires.
- Cover and line structures with blown or rolled forms of materials to insulate against cold, heat, or moisture, using saws, knives, rasps, trowels, blowers, or other tools and implements.
- Distribute insulating materials evenly into small spaces within floors, ceilings, or walls, using blowers and hose attachments, or cement mortars.
- Move controls, buttons, or levers to start blowers and regulate flow of materials through nozzles.
- Cover, seal, or finish insulated surfaces or access holes with plastic covers, canvas strips, sealants, tape, cement or asphalt mastic.
- Measure and cut insulation for covering surfaces, using tape measures, handsaws, power saws, knives, or scissors.
- Fill blower hoppers with insulating materials.
- Read blueprints, and select appropriate insulation, based on space characteristics and the heat retaining or excluding characteristics of the material.
- Remove old insulation, such as asbestos, following safety procedures.
- Prepare surfaces for insulation application by brushing or spreading on adhesives, cement, or asphalt, or by attaching metal pins to surfaces.
- Fit, wrap, staple, or glue insulating materials to structures or surfaces, using hand tools or wires.
- Cover and line structures with blown or rolled forms of materials to insulate against cold, heat, or moisture, using saws, knives, rasps, trowels, blowers, or other tools and implements.
- Distribute insulating materials evenly into small spaces within floors, ceilings, or walls, using blowers and hose attachments, or cement mortars.
- Move controls, buttons, or levers to start blowers and regulate flow of materials through nozzles.
- Cover, seal, or finish insulated surfaces or access holes with plastic covers, canvas strips, sealants, tape, cement or asphalt mastic.
- Apply adhesive cement to floor or wall material to join and adhere foundation material.
- Sweep, scrape, sand, or chip dirt and irregularities to clean base surfaces, correcting imperfections that may show through the covering.
- Form a smooth foundation by stapling plywood or Masonite over the floor or by brushing waterproof compound onto surface and filling cracks with plaster, putty, or grout to seal pores.
- Roll and press sheet wall and floor covering into cement base to smooth and finish surface, using hand roller.
- Cut flooring material to fit around obstructions.
- Inspect surface to be covered to ensure that it is firm and dry.
- Trim excess covering materials, tack edges, and join sections of covering material to form tight joint.
- Measure and mark guidelines on surfaces or foundations, using chalk lines and dividers.
- Cut covering and foundation materials, according to blueprints and sketches.
- Determine traffic areas and decide location of seams.
- Lay out, position, and apply shock-absorbing, sound-deadening, or decorative coverings to floors, walls, and cabinets, following guidelines to keep courses straight and create designs.
- Remove excess cement to clean finished surface.
- Disconnect and remove appliances, light fixtures, and worn floor and wall covering from floors, walls, and cabinets.
- Heat and soften floor covering materials to patch cracks or fit floor coverings around irregular surfaces, using blowtorch.
- Apply adhesive cement to floor or wall material to join and adhere foundation material.
- Sweep, scrape, sand, or chip dirt and irregularities to clean base surfaces, correcting imperfections that may show through the covering.
- Form a smooth foundation by stapling plywood or Masonite over the floor or by brushing waterproof compound onto surface and filling cracks with plaster, putty, or grout to seal pores.
- Roll and press sheet wall and floor covering into cement base to smooth and finish surface, using hand roller.
- Connect pipe pieces and seal joints, using welding equipment, cement, or glue.
- Cover pipes with earth or other materials.
- Grade or level trench bases, using tamping machines or hand tools.
- Dig trenches to desired or required depths, by hand or using trenching tools.
- Install or use instruments such as lasers, grade rods, or transit levels.
- Cut pipes to required lengths.
- Install or repair sanitary or stormwater sewer structures or pipe systems.
- Align and position pipes to prepare them for welding or sealing.
- Check slopes for conformance to requirements, using levels or lasers.
- Lay out pipe routes, following written instructions or blueprints and coordinating layouts with supervisors.
- Operate mechanized equipment, such as pickup trucks, rollers, tandem dump trucks, front-end loaders, or backhoes.
- Tap and drill holes into pipes to introduce auxiliary lines or devices.
- Locate existing pipes needing repair or replacement, using magnetic or radio indicators.
- Train or supervise others in laying pipe.
- Connect pipe pieces and seal joints, using welding equipment, cement, or glue.
- Cover pipes with earth or other materials.
- Grade or level trench bases, using tamping machines or hand tools.
- Dig trenches to desired or required depths, by hand or using trenching tools.
- Cut, miter, and glue piping insulation to insulate plumbing pipes and fittings.
- Fill water tanks and check tanks, pipes, and fittings for leaks.
- Test operation or functionality of mechanical, plumbing, electrical, and control systems.
- Apply weather seal, such as pipe flashings and sealants, to roof penetrations and structural devices.
- Install solar collector mounting devices on tile, asphalt, shingle, or built-up gravel roofs, using appropriate materials and penetration methods.
- Install copper or plastic plumbing using pipes, fittings, pipe cutters, acetylene torches, solder, wire brushes, sand cloths, flux, plastic pipe cleaners, or plastic glue.
- Identify plumbing, electrical, environmental, or safety hazards associated with solar thermal installations.
- Demonstrate start-up, shut-down, maintenance, diagnostic, and safety procedures to thermal system owners.
- Install circulating pumps using pipe, fittings, soldering equipment, electrical supplies, and hand tools.
- Install flat-plat, evacuated glass, or concentrating solar collectors on mounting devices, using brackets or struts.
- Install solar thermal system controllers and sensors.
- Design active direct or indirect, passive direct or indirect, or pool solar systems.
- Determine locations for installing solar subsystem components, including piping, water heaters, valves, and ancillary equipment.
- Perform routine maintenance or repairs to restore solar thermal systems to baseline operating conditions.
- Install heat exchangers and heat exchanger fluids according to installation manuals and schematics.
- Apply operation or identification tags or labels to system components, as required.
- Connect water heaters and storage tanks to power and water sources.
- Install plumbing, such as dip tubes, port fittings, drain tank valves, pressure temperature relief valves, or tanks, according to manufacturer specifications and building codes.
- Install monitoring system components, such as flow meters, temperature gauges, and pressure gauges, according to system design and manufacturer specifications.
- Assess collector sites to ensure structural integrity of potential mounting surfaces or the best orientation and tilt for solar collectors.
- Apply ultraviolet radiation protection to prevent degradation of plumbing.
- Cut, miter, and glue piping insulation to insulate plumbing pipes and fittings.
- Fill water tanks and check tanks, pipes, and fittings for leaks.
- Bond wood reinforcing strips to decks and cabin structures of watercraft, using resin-saturated fiberglass.
- Release air bubbles and smooth seams, using rollers.
- Spray chopped fiberglass, resins, and catalysts onto prepared molds or dies using pneumatic spray guns with chopper attachments.
- Mix catalysts into resins, and saturate cloth and mats with mixtures, using brushes.
- Check completed products for conformance to specifications and for defects by measuring with rulers or micrometers, by checking them visually, or by tapping them to detect bubbles or dead spots.
- Pat or press layers of saturated mat or cloth into place on molds, using brushes or hands, and smooth out wrinkles and air bubbles with hands or squeegees.
- Select precut fiberglass mats, cloth, and wood-bracing materials as required by projects being assembled.
- Trim excess materials from molds, using hand shears or trimming knives.
- Apply layers of plastic resin to mold surfaces prior to placement of fiberglass mats, repeating layers until products have the desired thicknesses and plastics have jelled.
- Inspect, clean, and assemble molds before beginning work.
- Cure materials by letting them set at room temperature, placing them under heat lamps, or baking them in ovens.
- Apply lacquers and waxes to mold surfaces to facilitate assembly and removal of laminated parts.
- Repair or modify damaged or defective glass-fiber parts, checking thicknesses, densities, and contours to ensure a close fit after repair.
- Check all dies, templates, and cutout patterns to be used in the manufacturing process to ensure that they conform to dimensional data, photographs, blueprints, samples, or customer specifications.
- Trim cured materials by sawing them with diamond-impregnated cutoff wheels.
- Mask off mold areas not to be laminated, using cellophane, wax paper, masking tape, or special sprays containing mold-release substances.
- Bond wood reinforcing strips to decks and cabin structures of watercraft, using resin-saturated fiberglass.