- Remove old finishes by stripping, sanding, wire brushing, burning, or using water or abrasive blasting.
Occupations with related tasks Save Table: XLSX CSV
- Spray materials, such as water, sand, steam, vinyl, paint, or stucco, through hoses to clean, coat, or seal surfaces.
- Mop, brush, or spread paints, cleaning solutions, or other compounds over surfaces to clean them or to provide protection.
- Lubricate, clean, or repair machinery, equipment, or tools.
- Clean or prepare construction sites to eliminate possible hazards.
- Tend pumps, compressors, or generators to provide power for tools, machinery, or equipment or to heat or move materials, such as asphalt.
- Signal equipment operators to facilitate alignment, movement, or adjustment of machinery, equipment, or materials.
- Read plans, instructions, or specifications to determine work activities.
- Measure, mark, or record openings or distances to layout areas where construction work will be performed.
- Dig ditches or trenches, backfill excavations, or compact and level earth to grade specifications, using picks, shovels, pneumatic tampers, or rakes.
- Load, unload, or identify building materials, machinery, or tools, distributing them to the appropriate locations, according to project plans or specifications.
- Position, join, align, or seal structural components, such as concrete wall sections or pipes.
- Perform site activities required of green certified construction practices, such as implementing waste management procedures, identifying materials for reuse, or installing erosion or sedimentation control mechanisms.
- Control traffic passing near, in, or around work zones.
- Install sewer, water, or storm drain pipes, using pipe-laying machinery or laser guidance equipment.
- Operate or maintain air monitoring or other sampling devices in confined or hazardous environments.
- Smooth or finish freshly poured cement or concrete, using floats, trowels, screeds, or powered cement finishing tools.
- Erect or dismantle scaffolding, shoring, braces, traffic barricades, ramps, or other temporary structures.
- Provide assistance to craft workers, such as carpenters, plasterers, or masons.
- Raze buildings or salvage useful materials.
- Position or dismantle forms for pouring concrete, using saws, hammers, nails, or bolts.
- Grind, scrape, sand, or polish surfaces, such as concrete, marble, terrazzo, or wood flooring, using abrasive tools or machines.
- Place, consolidate, or protect case-in-place concrete or masonry structures.
- Mix ingredients to create compounds for covering or cleaning surfaces.
- Mix, pour, or spread concrete, using portable cement mixers.
- Operate jackhammers or drills to break up concrete or pavement.
- Apply caulking compounds by hand or caulking guns to protect against entry of water or air.
- Tend machines that pump concrete, grout, cement, sand, plaster, or stucco through spray guns for application to ceilings or walls.
- Spray materials, such as water, sand, steam, vinyl, paint, or stucco, through hoses to clean, coat, or seal surfaces.
- Mop, brush, or spread paints, cleaning solutions, or other compounds over surfaces to clean them or to provide protection.
- Lubricate, clean, or repair machinery, equipment, or tools.
- Clean or prepare construction sites to eliminate possible hazards.
- Wash polished terrazzo surface, using cleaner and water, and apply sealer and curing agent according to manufacturer's specifications, using brush or sprayer.
- Clean chipped area, using wire brush, and feel and observe surface to determine if it is rough or uneven.
- Clean installation site, mixing and storage areas, tools, machines, and equipment, and store materials and equipment.
- Measure designated amounts of ingredients for terrazzo or grout, according to standard formulas and specifications, using graduated containers and scales, and load ingredients into portable mixer.
- Grind surfaces with a power grinder, or polish surfaces with polishing or surfacing machines.
- Cut metal division strips and press them into the terrazzo base for joints or changes of color to form designs or patterns or to help prevent cracks.
- Blend marble chip mixtures, place into panels, and push a roller over the surface to embed the chips.
- Modify mixing, grouting, grinding, or cleaning procedures, according to type of installation or material used.
- Spread, level, or smooth concrete or terrazzo mixtures to form bases or finished surfaces, using rakes, shovels, hand or power trowels, hand or power screeds, or floats.
- Grind curved surfaces or areas inaccessible to surfacing machine, such as stairways or cabinet tops, with portable hand grinder.
- Position and secure moisture membrane and wire mesh in preparation for pouring base materials for terrazzo installation.
- Fill slight grinding depressions with matching grout material and hand-trowel for a smooth, uniform surface.
- Sprinkle colored marble or stone chips, powdered steel, or coloring powder over surface to produce prescribed finish.
- Wet surface to prepare for bonding, fill holes and cracks with grout or slurry, and smooth with a trowel.
- Mix cement, sand, and water to produce concrete, grout, or slurry, using hoe, trowel, tamper, scraper, or concrete-mixing machine.
- Chip, scrape, or grind high spots, ridges, or rough projections to finish concrete, using pneumatic chisel, hand chisel, or other hand tools.
- Mold expansion joints and edges, using edging tools, jointers, or straightedges.
- Move terrazzo installation materials, tools, machines, or work devices to work areas, manually or using wheelbarrow.
- Repair concrete by cutting out damaged areas, drilling holes for reinforcing rods, and positioning reinforcing rods, using power saw and drill.
- Precast terrazzo blocks in wooden forms.
- Wet concrete surface and rub with stone to smooth surface and obtain specified finish.
- Build wooden molds, clamping molds around areas to be repaired, or setting up frames to the proper depth and alignment.
- Spread roofing paper on surface of foundation and spread concrete onto roofing paper with trowel to form terrazzo base.
- Produce rough concrete surface, using broom.
- Remove frames when the foundation is dry.
- Signal truck driver to position truck to facilitate pouring concrete and move chute to direct concrete on forms.
- Wash polished terrazzo surface, using cleaner and water, and apply sealer and curing agent according to manufacturer's specifications, using brush or sprayer.
- Clean chipped area, using wire brush, and feel and observe surface to determine if it is rough or uneven.
- Clean installation site, mixing and storage areas, tools, machines, and equipment, and store materials and equipment.
- Clean installation surfaces, equipment, tools, work sites, or storage areas, using water, chemical solutions, oxygen lances, or polishing machines.
- Remove damaged tile, brick, or mortar, and clean or prepare surfaces, using pliers, hammers, chisels, drills, wire brushes, or metal wire anchors.
- Mix mortar, plaster, and grout, manually or using machines, according to standard formulas.
- Erect scaffolding or other installation structures.
- Cut materials to specified sizes for installation, using power saws or tile cutters.
- Modify material moving, mixing, grouting, grinding, polishing, or cleaning procedures, according to installation or material requirements.
- Transport materials, tools, or machines to installation sites, manually or using conveyance equipment.
- Provide assistance in the preparation, installation, repair, or rebuilding of tile, brick, or stone surfaces.
- Locate and supply materials to masons for installation, following drawings or numbered sequences.
- Arrange or store materials, machines, tools, or equipment.
- Move or position materials such as marble slabs, using cranes, hoists, or dollies.
- Remove excess grout or residue from tile or brick joints, using sponges or trowels.
- Apply grout between joints of bricks or tiles, using grouting trowels.
- Apply caulk, sealants, or other agents to installed surfaces.
- Correct surface imperfections or fill chipped, cracked, or broken bricks or tiles, using fillers, adhesives, or grouting materials.
- Clean installation surfaces, equipment, tools, work sites, or storage areas, using water, chemical solutions, oxygen lances, or polishing machines.
- Remove damaged tile, brick, or mortar, and clean or prepare surfaces, using pliers, hammers, chisels, drills, wire brushes, or metal wire anchors.
- Clean chipped area, using wire brush, and feel and observe surface to determine if it is rough or uneven.
- Apply muriatic acid to clean surface, and rinse with water.
- Check the forms that hold the concrete to see that they are properly constructed.
- Set the forms that hold concrete to the desired pitch and depth, and align them.
- Spread, level, and smooth concrete, using rake, shovel, hand or power trowel, hand or power screed, and float.
- Monitor how the wind, heat, or cold affect the curing of the concrete throughout the entire process.
- Mold expansion joints and edges, using edging tools, jointers, and straightedge.
- Signal truck driver to position truck to facilitate pouring concrete, and move chute to direct concrete on forms.
- Direct the casting of the concrete and supervise laborers who use shovels or special tools to spread it.
- Produce rough concrete surface, using broom.
- Apply hardening and sealing compounds to cure surface of concrete, and waterproof or restore surface.
- Operate power vibrator to compact concrete.
- Install anchor bolts, steel plates, door sills and other fixtures in freshly poured concrete or pattern or stamp the surface to provide a decorative finish.
- Wet surface to prepare for bonding, fill holes and cracks with grout or slurry, and smooth, using trowel.
- Waterproof or restore concrete surfaces, using appropriate compounds.
- Mix cement, sand, and water to produce concrete, grout, or slurry, using hoe, trowel, tamper, scraper, or concrete-mixing machine.
- Chip, scrape, and grind high spots, ridges, and rough projections to finish concrete, using pneumatic chisels, power grinders, or hand tools.
- Cut out damaged areas, drill holes for reinforcing rods, and position reinforcing rods to repair concrete, using power saw and drill.
- Wet concrete surface, and rub with stone to smooth surface and obtain specified finish.
- Build wooden molds, and clamp molds around area to be repaired, using hand tools.
- Sprinkle colored marble or stone chips, powdered steel, or coloring powder over surface to produce prescribed finish.
- Fabricate concrete beams, columns, and panels.
- Polish surface, using polishing or surfacing machine.
- Cut metal division strips, and press them into terrazzo base so that top edges form desired design or pattern.
- Push roller over surface to embed chips in surface.
- Spread roofing paper on surface of foundation, and spread concrete onto roofing paper with trowel to form terrazzo base.
- Clean chipped area, using wire brush, and feel and observe surface to determine if it is rough or uneven.
- Apply muriatic acid to clean surface, and rinse with water.
- Sweep and clean roofs to prepare them for the application of new roofing materials.
- Clean work areas and equipment.
- Clear drains and downspouts and clean gutters.
- Check to ensure that completed roofs are watertight.
- Locate worn or torn areas in roofs.
- Maintain tools and equipment.
- Cover roofs with layers of roofing felt or asphalt strips before installing tile, slate, or composition materials.
- Remove old roofing materials.
- Unload materials and tools from work trucks, and unroll roofing as directed.
- Set ladders, scaffolds, and hoists in place for taking supplies to roofs.
- Place tiles, nail them to roof boards, and cover nailheads with roofing cement.
- Provide assistance to skilled roofers installing and repairing roofs, flashings, and surfaces.
- Attach roofing paper and composition shingles, using nails.
- Perform emergency leak repairs and general maintenance for a variety of roof types.
- Attach sheets of metal to roof boards or building frameworks when installing metal roofs.
- Hoist tar and roofing materials to roofs, using ropes and pulleys, or carry materials up ladders.
- Apply shingles, gravel, or asphalt over the top layer of tar to protect the roofing material.
- Chop tar into small pieces, and heat chopped tar in kettles.
- Sweep and clean roofs to prepare them for the application of new roofing materials.
- Clean work areas and equipment.
- Clear drains and downspouts and clean gutters.
- Place articles to be stripped into stripping tanks.
- Clean work areas and equipment.
- Perform support duties to assist painters, paperhangers, plasterers, or masons.
- Apply protective coverings, such as masking tape, to articles or areas that could be damaged or stained by work processes.
- Erect scaffolding.
- Fill cracks or breaks in surfaces of plaster articles or areas with putty or epoxy compounds.
- Supply or hold tools and materials.
- Smooth surfaces of articles to be painted, using sanding and buffing tools and equipment.
- Mix plaster, and carry plaster to plasterers.
- Remove articles such as cabinets, metal furniture, and paint containers from stripping tanks after prescribed periods of time.
- Pour specified amounts of chemical solutions into stripping tanks.
- Place articles to be stripped into stripping tanks.
- Clean work areas and equipment.
- Clean and prepare surfaces for applications of plaster, cement, stucco, or similar materials, such as by drywall taping.
- Cover surfaces such as windows, doors, or sidewalks to protect from splashing.
- Mix mortar and plaster to desired consistency or direct workers who perform mixing.
- Apply coats of plaster or stucco to walls, ceilings, or partitions of buildings, using trowels, brushes, or spray guns.
- Set up scaffolds.
- Determine materials needed to complete the job and place orders accordingly.
- Apply weatherproof, decorative coverings to exterior surfaces of buildings, such as by troweling or spraying on coats of stucco.
- Create decorative textures in finish coat, using brushes or trowels, sand, pebbles, or stones.
- Apply insulation to building exteriors by installing prefabricated insulation systems over existing walls or by covering the outer wall with insulation board, reinforcing mesh, and a base coat.
- Rough the undercoat surface with a scratcher so the finish coat will adhere.
- Cure freshly plastered surfaces.
- Install guide wires on exterior surfaces of buildings to indicate thickness of plaster or stucco and nail wire mesh, lath, or similar materials to the outside surface to hold stucco in place.
- Spray acoustic materials or texture finish over walls or ceilings.
- Mold or install ornamental plaster pieces, panels, or trim.
- Clean and prepare surfaces for applications of plaster, cement, stucco, or similar materials, such as by drywall taping.
- Clean job sites.
- Clean working surface to remove scale, dust, soot, or chips of brick and mortar, using broom, wire brush, or scraper.
- Measure distance from reference points and mark guidelines to lay out work, using plumb bobs and levels.
- Construct corners by fastening in plumb position a corner pole or building a corner pyramid of bricks, and filling in between the corners using a line from corner to corner to guide each course, or layer, of brick.
- Apply and smooth mortar or other mixture over work surface.
- Calculate angles and courses and determine vertical and horizontal alignment of courses.
- Break or cut bricks, tiles, or blocks to size, using trowel edge, hammer, or power saw.
- Interpret blueprints and drawings to determine specifications and to calculate the materials required.
- Remove excess mortar with trowels and hand tools, and finish mortar joints with jointing tools, for a sealed, uniform appearance.
- Fasten or fuse brick or other building material to structure with wire clamps, anchor holes, torch, or cement.
- Examine brickwork or structure to determine need for repair.
- Mix specified amounts of sand, clay, dirt, or mortar powder with water to form refractory mixtures.
- Remove burned or damaged brick or mortar, using sledgehammer, crowbar, chipping gun, or chisel.
- Lay and align bricks, blocks, or tiles to build or repair structures or high temperature equipment, such as cupola, kilns, ovens, or furnaces.
- Spray or spread refractory material over brickwork to protect against deterioration.
- Clean working surface to remove scale, dust, soot, or chips of brick and mortar, using broom, wire brush, or scraper.
- Sweep, scrape, sand, or chip dirt and irregularities to clean base surfaces, correcting imperfections that may show through the covering.
- Cut flooring material to fit around obstructions.
- Inspect surface to be covered to ensure that it is firm and dry.
- Trim excess covering materials, tack edges, and join sections of covering material to form tight joint.
- Form a smooth foundation by stapling plywood or Masonite over the floor or by brushing waterproof compound onto surface and filling cracks with plaster, putty, or grout to seal pores.
- Measure and mark guidelines on surfaces or foundations, using chalk lines and dividers.
- Cut covering and foundation materials, according to blueprints and sketches.
- Roll and press sheet wall and floor covering into cement base to smooth and finish surface, using hand roller.
- Apply adhesive cement to floor or wall material to join and adhere foundation material.
- Determine traffic areas and decide location of seams.
- Lay out, position, and apply shock-absorbing, sound-deadening, or decorative coverings to floors, walls, and cabinets, following guidelines to keep courses straight and create designs.
- Remove excess cement to clean finished surface.
- Disconnect and remove appliances, light fixtures, and worn floor and wall covering from floors, walls, and cabinets.
- Heat and soften floor covering materials to patch cracks or fit floor coverings around irregular surfaces, using blowtorch.
- Sweep, scrape, sand, or chip dirt and irregularities to clean base surfaces, correcting imperfections that may show through the covering.
- Remove paint, varnish, dirt, and grease from surfaces, using paint remover and water soda solutions.
- Smooth strips or sections of paper with brushes or rollers to remove wrinkles and bubbles and to smooth joints.
- Trim rough edges from strips, using straightedges and trimming knives.
- Trim excess material at ceilings or baseboards, using knives.
- Check finished wallcoverings for proper alignment, pattern matching, and neatness of seams.
- Mark vertical guidelines on walls to align strips, using plumb bobs and chalk lines.
- Cover interior walls and ceilings of rooms with decorative wallpaper or fabric, using hand tools.
- Apply adhesives to the backs of paper strips, using brushes, or dunk strips of prepasted wallcovering in water, wiping off any excess adhesive.
- Measure and cut strips from rolls of wallpaper or fabric, using shears or razors.
- Place strips or sections of paper on surfaces, aligning section edges and patterns.
- Fill holes, cracks, and other surface imperfections preparatory to covering surfaces.
- Measure surfaces or review work orders to estimate the quantities of materials needed.
- Apply sizing to seal surfaces and maximize adhesion of coverings to surfaces.
- Smooth rough spots on walls and ceilings, using sandpaper.
- Set up equipment, such as pasteboards and scaffolds.
- Remove old paper, using water, steam machines, or solvents and scrapers.
- Apply thinned glue to waterproof porous surfaces, using brushes, rollers, or pasting machines.
- Mix paste, using paste powder and water, and brush paste onto surfaces.
- Staple or tack advertising posters onto fences, walls, billboards, or poles.
- Apply acetic acid to damp plaster to prevent lime from bleeding through paper.
- Remove paint, varnish, dirt, and grease from surfaces, using paint remover and water soda solutions.
- Remove any old tile, grout and adhesive using chisels and scrapers and clean the surface carefully.
- Align and straighten tile using levels, squares, and straightedges.
- Finish and dress the joints and wipe excess grout from between tiles, using damp sponge.
- Cut and shape tile to fit around obstacles and into odd spaces and corners, using hand and power cutting tools.
- Determine and implement the best layout to achieve a desired pattern.
- Mix, apply, and spread plaster, concrete, mortar, cement, mastic, glue or other adhesives to form a bed for the tiles, using brush, trowel and screed.
- Study blueprints and examine surface to be covered to determine amount of material needed.
- Measure and mark surfaces to be tiled, following blueprints.
- Lay and set mosaic tiles to create decorative wall, mural, and floor designs.
- Apply mortar to tile back, position the tile, and press or tap with trowel handle to affix tile to base.
- Mix and apply mortar or cement to edges and ends of drain tiles to seal halves and joints.
- Apply a sealer to make grout stain- and water-resistant.
- Level concrete and allow to dry.
- Measure and cut metal lath to size for walls and ceilings, using tin snips.
- Install and anchor fixtures in designated positions, using hand tools.
- Prepare surfaces for tiling by attaching lath or waterproof paper, or by applying a cement mortar coat to a metal screen.
- Remove and replace cracked or damaged tile.
- Cut tile backing to required size, using shears.
- Cut, surface, polish, and install marble and granite or install pre-cast terrazzo, granite or marble units.
- Spread mastic or other adhesive base on roof deck to form base for promenade tile, using serrated spreader.
- Assist customers in selection of tile and grout.
- Prepare cost and labor estimates, based on calculations of time and materials needed for project.
- Brush glue onto manila paper on which design has been drawn and position tiles, finished side down, onto paper.
- Select and order tile and other items to be installed, such as bathroom accessories, walls, panels, and cabinets, according to specifications.
- Build underbeds and install anchor bolts, wires, and brackets.
- Remove any old tile, grout and adhesive using chisels and scrapers and clean the surface carefully.
- Wash concrete surfaces before mounting tile to increase adhesive qualities of surfaces, using washing soda and zinc sulfate solution.
- Read blueprints or other specifications to determine methods of installation, work procedures, or material or tool requirements.
- Measure and mark surfaces to lay out work, according to blueprints or drawings, using tape measures, straightedges or squares, and marking devices.
- Fit and fasten wallboard or drywall into position on wood or metal frameworks, using glue, nails, or screws.
- Measure and cut openings in panels or tiles for electrical outlets, windows, vents, plumbing, or other fixtures, using keyhole saws or other cutting tools.
- Assemble or install metal framing or decorative trim for windows, doorways, or vents.
- Cut metal or wood framing and trim to size, using cutting tools.
- Inspect furrings, mechanical mountings, or masonry surfaces for plumbness and level, using spirit or water levels.
- Cut fixture or border tiles to size, using keyhole saws, and insert them into surrounding frameworks.
- Cut and screw together metal channels to make floor or ceiling frames, according to plans for the location of rooms or hallways.
- Hang drywall panels on metal frameworks of walls and ceilings in offices, schools, or other large buildings, using lifts or hoists to adjust panel heights, when necessary.
- Trim rough edges from wallboard to maintain even joints, using knives.
- Suspend angle iron grids or channel irons from ceilings, using wire.
- Coordinate work with drywall finishers who cover the seams between drywall panels.
- Install horizontal and vertical metal or wooden studs to frames so that wallboard can be attached to interior walls.
- Scribe and cut edges of tile to fit walls where wall molding is not specified.
- Hang dry lines to wall moldings to guide positioning of main runners.
- Fasten metal or rockboard lath to the structural framework of walls, ceilings, or partitions of buildings, using nails, screws, staples, or wire-ties.
- Install blanket insulation between studs and tack plastic moisture barriers over insulation.
- Seal joints between ceiling tiles and walls.
- Remove existing plaster, drywall, or paneling, using crowbars and hammers.
- Apply or mount acoustical tile or blocks, strips, or sheets of shock-absorbing materials to ceilings or walls of buildings to reduce reflection of sound or to decorate rooms.
- Mount tile, using adhesives, or by nailing, screwing, stapling, or wire-tying lath directly to structural frameworks.
- Nail channels or wood furring strips to surfaces to provide mounting for tile.
- Install metal lath where plaster applications will be exposed to weather or water, or for curved or irregular surfaces.
- Apply cement to backs of tiles and press tiles into place, aligning them with layout marks or joints of previously laid tile.
- Wash concrete surfaces before mounting tile to increase adhesive qualities of surfaces, using washing soda and zinc sulfate solution.