- Trim, file, grind, deburr, buff, or smooth surfaces, seams, or joints of assembled parts, using hand tools or portable power tools.
Occupations with related tasks Save Table: XLSX CSV
- Grind surfaces with a power grinder, or polish surfaces with polishing or surfacing machines.
- Grind curved surfaces or areas inaccessible to surfacing machine, such as stairways or cabinet tops, with portable hand grinder.
- Chip, scrape, or grind high spots, ridges, or rough projections to finish concrete, using pneumatic chisel, hand chisel, or other hand tools.
- Measure designated amounts of ingredients for terrazzo or grout, according to standard formulas and specifications, using graduated containers and scales, and load ingredients into portable mixer.
- Cut metal division strips and press them into the terrazzo base for joints or changes of color to form designs or patterns or to help prevent cracks.
- Blend marble chip mixtures, place into panels, and push a roller over the surface to embed the chips.
- Modify mixing, grouting, grinding, or cleaning procedures, according to type of installation or material used.
- Spread, level, or smooth concrete or terrazzo mixtures to form bases or finished surfaces, using rakes, shovels, hand or power trowels, hand or power screeds, or floats.
- Wash polished terrazzo surface, using cleaner and water, and apply sealer and curing agent according to manufacturer's specifications, using brush or sprayer.
- Position and secure moisture membrane and wire mesh in preparation for pouring base materials for terrazzo installation.
- Fill slight grinding depressions with matching grout material and hand-trowel for a smooth, uniform surface.
- Clean installation site, mixing and storage areas, tools, machines, and equipment, and store materials and equipment.
- Sprinkle colored marble or stone chips, powdered steel, or coloring powder over surface to produce prescribed finish.
- Wet surface to prepare for bonding, fill holes and cracks with grout or slurry, and smooth with a trowel.
- Mix cement, sand, and water to produce concrete, grout, or slurry, using hoe, trowel, tamper, scraper, or concrete-mixing machine.
- Mold expansion joints and edges, using edging tools, jointers, or straightedges.
- Move terrazzo installation materials, tools, machines, or work devices to work areas, manually or using wheelbarrow.
- Clean chipped area, using wire brush, and feel and observe surface to determine if it is rough or uneven.
- Repair concrete by cutting out damaged areas, drilling holes for reinforcing rods, and positioning reinforcing rods, using power saw and drill.
- Precast terrazzo blocks in wooden forms.
- Wet concrete surface and rub with stone to smooth surface and obtain specified finish.
- Build wooden molds, clamping molds around areas to be repaired, or setting up frames to the proper depth and alignment.
- Spread roofing paper on surface of foundation and spread concrete onto roofing paper with trowel to form terrazzo base.
- Produce rough concrete surface, using broom.
- Remove frames when the foundation is dry.
- Signal truck driver to position truck to facilitate pouring concrete and move chute to direct concrete on forms.
- Grind surfaces with a power grinder, or polish surfaces with polishing or surfacing machines.
- Grind curved surfaces or areas inaccessible to surfacing machine, such as stairways or cabinet tops, with portable hand grinder.
- Chip, scrape, or grind high spots, ridges, or rough projections to finish concrete, using pneumatic chisel, hand chisel, or other hand tools.
- Scrape and sand floor edges and areas inaccessible to floor sanders, using scrapers, disk-type sanders, and sandpaper.
- Guide sanding machines over surfaces of floors until surfaces are smooth.
- Buff and vacuum floors to ensure their cleanliness prior to the application of finish.
- Inspect floors for smoothness.
- Attach sandpaper to rollers of sanding machines.
- Apply filler compound and coats of finish to floors to seal wood.
- Remove excess glue from joints, using knives, scrapers, or wood chisels.
- Scrape and sand floor edges and areas inaccessible to floor sanders, using scrapers, disk-type sanders, and sandpaper.
- Guide sanding machines over surfaces of floors until surfaces are smooth.
- Sand or patch nicks or cracks in plasterboard or wallboard.
- Sand rough spots of dried cement between applications of compounds.
- Spread sealing compound between boards or panels or over cracks, holes, nail heads, or screw heads, using trowels, broadknives, or spatulas.
- Press paper tape over joints to embed tape into sealing compound and to seal joints.
- Apply additional coats to fill in holes and make surfaces smooth.
- Seal joints between plasterboard or other wallboard to prepare wall surfaces for painting or papering.
- Spread and smooth cementing material over tape, using trowels or floating machines to blend joints with wall surfaces.
- Mix sealing compounds by hand or with portable electric mixers.
- Work on high ceilings, using scaffolding or other tools, such as stilts.
- Select the correct sealing compound or tape.
- Countersink nails or screws below surfaces of walls before applying sealing compounds, using hammers or screwdrivers.
- Remove extra compound after surfaces have been covered sufficiently.
- Install metal molding at wall corners to secure wallboard.
- Apply texturizing compounds or primers to walls or ceilings before final finishing, using trowels, brushes, rollers, or spray guns.
- Check adhesives to ensure that they will work and will remain durable.
- Use mechanical applicators that spread compounds and embed tape in one operation.
- Sand or patch nicks or cracks in plasterboard or wallboard.
- Sand rough spots of dried cement between applications of compounds.
- Smooth, polish, and bevel surfaces, using hand tools and power tools.
- Repair cracked or chipped areas of stone or marble, using blowtorch and mastic, and remove rough or defective spots from concrete, using power grinder or chisel and hammer.
- Lay out wall patterns or foundations, using straight edge, rule, or staked lines.
- Shape, trim, face and cut marble or stone preparatory to setting, using power saws, cutting equipment, and hand tools.
- Set vertical and horizontal alignment of structures, using plumb bob, gauge line, and level.
- Mix mortar or grout and pour or spread mortar or grout on marble slabs, stone, or foundation.
- Remove wedges, fill joints between stones, finish joints between stones, using a trowel, and smooth the mortar to an attractive finish, using a tuck pointer.
- Set stone or marble in place, according to layout or pattern.
- Clean excess mortar or grout from surface of marble, stone, or monument, using sponge, brush, water, or acid.
- Lay brick to build shells of chimneys and smokestacks or to line or reline industrial furnaces, kilns, boilers and similar installations.
- Replace broken or missing masonry units in walls or floors.
- Drill holes in marble or ornamental stone and anchor brackets in holes.
- Remove sections of monument from truck bed, and guide stone onto foundation, using skids, hoist, or truck crane.
- Construct and install prefabricated masonry units.
- Dig trench for foundation of monument, using pick and shovel.
- Position mold along guidelines of wall, press mold in place, and remove mold and paper from wall.
- Line interiors of molds with treated paper and fill molds with composition-stone mixture.
- Smooth, polish, and bevel surfaces, using hand tools and power tools.
- Repair cracked or chipped areas of stone or marble, using blowtorch and mastic, and remove rough or defective spots from concrete, using power grinder or chisel and hammer.
- Smooth surfaces, using sandpaper, scrapers, brushes, steel wool, or sanding machines.
- Polish final coats to specified finishes.
- Fill cracks, holes, or joints with caulk, putty, plaster, or other fillers, using caulking guns or putty knives.
- Cover surfaces with dropcloths or masking tape and paper to protect surfaces during painting.
- Read work orders or receive instructions from supervisors or homeowners to determine work requirements.
- Apply primers or sealers to prepare new surfaces, such as bare wood or metal, for finish coats.
- Apply paint, stain, varnish, enamel, or other finishes to equipment, buildings, bridges, or other structures, using brushes, spray guns, or rollers.
- Erect scaffolding or swing gates, or set up ladders, to work above ground level.
- Mix and match colors of paint, stain, or varnish with oil or thinning and drying additives to obtain desired colors and consistencies.
- Calculate amounts of required materials and estimate costs, based on surface measurements or work orders.
- Wash and treat surfaces with oil, turpentine, mildew remover, or other preparations, and sand rough spots to ensure that finishes will adhere properly.
- Select and purchase tools or finishes for surfaces to be covered, considering durability, ease of handling, methods of application, and customers' wishes.
- Remove old finishes by stripping, sanding, wire brushing, burning, or using water or abrasive blasting.
- Remove fixtures such as pictures, door knobs, lamps, or electric switch covers prior to painting.
- Use special finishing techniques such as sponging, ragging, layering, or faux finishing.
- Cut stencils and brush or spray lettering or decorations on surfaces.
- Waterproof buildings, using waterproofers or caulking.
- Spray or brush hot plastics or pitch onto surfaces.
- Bake finishes on painted or enameled articles, using baking ovens.
- Smooth surfaces, using sandpaper, scrapers, brushes, steel wool, or sanding machines.
- Polish final coats to specified finishes.
- Chip, scrape, and grind high spots, ridges, and rough projections to finish concrete, using pneumatic chisels, power grinders, or hand tools.
- Polish surface, using polishing or surfacing machine.
- Check the forms that hold the concrete to see that they are properly constructed.
- Set the forms that hold concrete to the desired pitch and depth, and align them.
- Spread, level, and smooth concrete, using rake, shovel, hand or power trowel, hand or power screed, and float.
- Monitor how the wind, heat, or cold affect the curing of the concrete throughout the entire process.
- Mold expansion joints and edges, using edging tools, jointers, and straightedge.
- Signal truck driver to position truck to facilitate pouring concrete, and move chute to direct concrete on forms.
- Direct the casting of the concrete and supervise laborers who use shovels or special tools to spread it.
- Produce rough concrete surface, using broom.
- Apply hardening and sealing compounds to cure surface of concrete, and waterproof or restore surface.
- Operate power vibrator to compact concrete.
- Install anchor bolts, steel plates, door sills and other fixtures in freshly poured concrete or pattern or stamp the surface to provide a decorative finish.
- Wet surface to prepare for bonding, fill holes and cracks with grout or slurry, and smooth, using trowel.
- Waterproof or restore concrete surfaces, using appropriate compounds.
- Mix cement, sand, and water to produce concrete, grout, or slurry, using hoe, trowel, tamper, scraper, or concrete-mixing machine.
- Cut out damaged areas, drill holes for reinforcing rods, and position reinforcing rods to repair concrete, using power saw and drill.
- Wet concrete surface, and rub with stone to smooth surface and obtain specified finish.
- Clean chipped area, using wire brush, and feel and observe surface to determine if it is rough or uneven.
- Build wooden molds, and clamp molds around area to be repaired, using hand tools.
- Sprinkle colored marble or stone chips, powdered steel, or coloring powder over surface to produce prescribed finish.
- Fabricate concrete beams, columns, and panels.
- Cut metal division strips, and press them into terrazzo base so that top edges form desired design or pattern.
- Push roller over surface to embed chips in surface.
- Apply muriatic acid to clean surface, and rinse with water.
- Spread roofing paper on surface of foundation, and spread concrete onto roofing paper with trowel to form terrazzo base.
- Chip, scrape, and grind high spots, ridges, and rough projections to finish concrete, using pneumatic chisels, power grinders, or hand tools.
- Polish surface, using polishing or surfacing machine.
- Smooth surfaces of articles to be painted, using sanding and buffing tools and equipment.
- Clean work areas and equipment.
- Perform support duties to assist painters, paperhangers, plasterers, or masons.
- Apply protective coverings, such as masking tape, to articles or areas that could be damaged or stained by work processes.
- Erect scaffolding.
- Fill cracks or breaks in surfaces of plaster articles or areas with putty or epoxy compounds.
- Supply or hold tools and materials.
- Mix plaster, and carry plaster to plasterers.
- Place articles to be stripped into stripping tanks.
- Remove articles such as cabinets, metal furniture, and paint containers from stripping tanks after prescribed periods of time.
- Pour specified amounts of chemical solutions into stripping tanks.
- Smooth surfaces of articles to be painted, using sanding and buffing tools and equipment.
- Cut and trim carpet to fit along wall edges, openings, and projections, finishing the edges with a wall trimmer.
- Inspect the surface to be covered to determine its condition, and correct any imperfections that might show through carpet or cause carpet to wear unevenly.
- Roll out, measure, mark, and cut carpeting to size with a carpet knife, following floor sketches and allowing extra carpet for final fitting.
- Join edges of carpet and seam edges where necessary, by sewing or by using tape with glue and heated carpet iron.
- Plan the layout of the carpet, allowing for expected traffic patterns and placing seams for best appearance and longest wear.
- Stretch carpet to align with walls and ensure a smooth surface, and press carpet in place over tack strips or use staples, tape, tacks or glue to hold carpet in place.
- Take measurements and study floor sketches to calculate the area to be carpeted and the amount of material needed.
- Install carpet on some floors using adhesive, following prescribed method.
- Clean up before and after installation, including vacuuming carpet and discarding remnant pieces.
- Measure, cut and install tackless strips along the baseboard or wall.
- Nail tack strips around area to be carpeted or use old strips to attach edges of new carpet.
- Cut carpet padding to size and install padding, following prescribed method.
- Fasten metal treads across door openings or where carpet meets flooring to hold carpet in place.
- Draw building diagrams and record dimensions.
- Move furniture from area to be carpeted and remove old carpet and padding.
- Cut and bind material.
- Cut and trim carpet to fit along wall edges, openings, and projections, finishing the edges with a wall trimmer.
- Smooth or sand surfaces to remove ridges, tool marks, glue, or caulking.
- Clean work areas, machines, or equipment, to maintain a clean and safe job site.
- Fasten timbers or lumber with glue, screws, pegs, or nails and install hardware.
- Perform tie spacing layout and measure, mark, drill or cut.
- Select tools, equipment, or materials from storage and transport items to work site.
- Drill holes in timbers or lumber.
- Cut timbers, lumber, or paneling to specified dimensions.
- Position and hold timbers, lumber, or paneling in place for fastening or cutting.
- Align, straighten, plumb, or square forms for installation.
- Hold plumb bobs, sighting rods, or other equipment to aid in establishing reference points and lines.
- Erect scaffolding, shoring, or braces.
- Construct forms and assist in raising them to the required elevation.
- Install handrails under the direction of a carpenter.
- Glue and clamp edges or joints of assembled parts.
- Secure stakes to grids for constructions of footings, nail scabs to footing forms, and vibrate and float concrete.
- Cut and install insulating or sound-absorbing material.
- Cut tile or linoleum to fit and spread adhesives on flooring for installation.
- Cover surfaces with laminated plastic covering material.
- Smooth or sand surfaces to remove ridges, tool marks, glue, or caulking.
- Smooth rough spots on walls and ceilings, using sandpaper.
- Smooth strips or sections of paper with brushes or rollers to remove wrinkles and bubbles and to smooth joints.
- Trim rough edges from strips, using straightedges and trimming knives.
- Trim excess material at ceilings or baseboards, using knives.
- Check finished wallcoverings for proper alignment, pattern matching, and neatness of seams.
- Mark vertical guidelines on walls to align strips, using plumb bobs and chalk lines.
- Cover interior walls and ceilings of rooms with decorative wallpaper or fabric, using hand tools.
- Apply adhesives to the backs of paper strips, using brushes, or dunk strips of prepasted wallcovering in water, wiping off any excess adhesive.
- Measure and cut strips from rolls of wallpaper or fabric, using shears or razors.
- Place strips or sections of paper on surfaces, aligning section edges and patterns.
- Fill holes, cracks, and other surface imperfections preparatory to covering surfaces.
- Measure surfaces or review work orders to estimate the quantities of materials needed.
- Apply sizing to seal surfaces and maximize adhesion of coverings to surfaces.
- Set up equipment, such as pasteboards and scaffolds.
- Remove old paper, using water, steam machines, or solvents and scrapers.
- Apply thinned glue to waterproof porous surfaces, using brushes, rollers, or pasting machines.
- Mix paste, using paste powder and water, and brush paste onto surfaces.
- Staple or tack advertising posters onto fences, walls, billboards, or poles.
- Remove paint, varnish, dirt, and grease from surfaces, using paint remover and water soda solutions.
- Apply acetic acid to damp plaster to prevent lime from bleeding through paper.
- Smooth rough spots on walls and ceilings, using sandpaper.
- Buff tires according to specifications for width and undertread depth.
- Build semi-raw rubber treads onto buffed tire casings to prepare tires for vulcanization in recapping or retreading processes.
- Trim excess rubber and imperfections during retreading processes.
- Fill cuts and holes in tires, using hot rubber.
- Place tires into molds for new tread.
- Fit inner tubes and final layers of rubber onto tires.
- Brush or spray solvents onto plies to ensure adhesion, and repeat process as specified, alternating direction of each ply to strengthen tires.
- Start rollers that bond tread and plies as drums revolve.
- Align treads with guides, start drums to wind treads onto plies, and slice ends.
- Roll camelbacks onto casings by hand, and cut camelbacks, using knives.
- Inspect worn tires for faults, cracks, cuts, and nail holes, and to determine if tires are suitable for retreading.
- Measure tires to determine mold size requirements.
- Roll hand rollers over rebuilt casings, exerting pressure to ensure adhesion between camelbacks and casings.
- Position ply stitcher rollers and drums according to width of stock, using hand tools and gauges.
- Cut plies at splice points, and press ends together to form continuous bands.
- Activate bead setters that press prefabricated beads onto plies.
- Depress pedals to rotate drums, and wind specified numbers of plies around drums to form tire bodies.
- Clean and paint completed tires.
- Rub cement sticks on drum edges to provide adhesive surfaces for plies.
- Position rollers that turn ply edges under and over beads, or use steel rods to turn ply edges.
- Depress pedals to collapse drums after processing is complete.
- Wind chafers and breakers onto plies.
- Pull plies from supply racks, and align plies with edges of drums.
- Buff tires according to specifications for width and undertread depth.
- Cut, surface, polish, and install marble and granite or install pre-cast terrazzo, granite or marble units.
- Align and straighten tile using levels, squares, and straightedges.
- Finish and dress the joints and wipe excess grout from between tiles, using damp sponge.
- Cut and shape tile to fit around obstacles and into odd spaces and corners, using hand and power cutting tools.
- Determine and implement the best layout to achieve a desired pattern.
- Mix, apply, and spread plaster, concrete, mortar, cement, mastic, glue or other adhesives to form a bed for the tiles, using brush, trowel and screed.
- Study blueprints and examine surface to be covered to determine amount of material needed.
- Measure and mark surfaces to be tiled, following blueprints.
- Lay and set mosaic tiles to create decorative wall, mural, and floor designs.
- Apply mortar to tile back, position the tile, and press or tap with trowel handle to affix tile to base.
- Mix and apply mortar or cement to edges and ends of drain tiles to seal halves and joints.
- Apply a sealer to make grout stain- and water-resistant.
- Level concrete and allow to dry.
- Measure and cut metal lath to size for walls and ceilings, using tin snips.
- Install and anchor fixtures in designated positions, using hand tools.
- Prepare surfaces for tiling by attaching lath or waterproof paper, or by applying a cement mortar coat to a metal screen.
- Remove and replace cracked or damaged tile.
- Cut tile backing to required size, using shears.
- Remove any old tile, grout and adhesive using chisels and scrapers and clean the surface carefully.
- Spread mastic or other adhesive base on roof deck to form base for promenade tile, using serrated spreader.
- Assist customers in selection of tile and grout.
- Prepare cost and labor estimates, based on calculations of time and materials needed for project.
- Brush glue onto manila paper on which design has been drawn and position tiles, finished side down, onto paper.
- Select and order tile and other items to be installed, such as bathroom accessories, walls, panels, and cabinets, according to specifications.
- Build underbeds and install anchor bolts, wires, and brackets.
- Cut, surface, polish, and install marble and granite or install pre-cast terrazzo, granite or marble units.
- Grind ends of new or worn rails to attain smooth joints, using portable grinders.
- Patrol assigned track sections so that damaged or broken track can be located and reported.
- Repair or adjust track switches, using wrenches and replacement parts.
- Weld sections of track together, such as switch points and frogs.
- Observe leveling indicator arms to verify levelness and alignment of tracks.
- Operate single- or multiple-head spike driving machines to drive spikes into ties and secure rails.
- Operate track wrenches to tighten or loosen bolts at joints that hold ends of rails together.
- Cut rails to specified lengths, using rail saws.
- Lubricate machines, change oil, or fill hydraulic reservoirs to specified levels.
- Drill holes through rails, tie plates, or fishplates for insertion of bolts or spikes, using power drills.
- Clean tracks or clear ice or snow from tracks or switch boxes.
- Clean, grade, or level ballast on railroad tracks.
- Raise rails, using hydraulic jacks, to allow for tie removal and replacement.
- Adjust controls of machines that spread, shape, raise, level, or align track, according to specifications.
- Dress and reshape worn or damaged railroad switch points or frogs, using portable power grinders.
- Clean or make minor repairs to machines or equipment.
- Operate single- or multiple-head spike pullers to pull old spikes from ties.
- String and attach wire-guidelines machine to rails so that tracks or rails can be aligned or leveled.
- Engage mechanisms that lay tracks or rails to specified gauges.
- Drive graders, tamping machines, brooms, or ballast spreading machines to redistribute gravel or ballast between rails.
- Drive vehicles that automatically move and lay tracks or rails over sections of track to be constructed, repaired, or maintained.
- Turn wheels of machines, using lever controls, to adjust guidelines for track alignments or grades, following specifications.
- Push controls to close grasping devices on track or rail sections so that they can be raised or moved.
- Operate tie-adzing machines to cut ties and permit insertion of fishplates that hold rails.
- Paint railroad signs, such as speed limits or gate-crossing warnings.
- Spray ties, fishplates, or joints with oil to protect them from weathering.
- Grind ends of new or worn rails to attain smooth joints, using portable grinders.
- Grind or polish glass, smoothing edges when necessary.
- Read and interpret blueprints or specifications to determine size, shape, color, type, or thickness of glass, location of framing, installation procedures, or staging or scaffolding materials required.
- Determine plumb of walls or ceilings, using plumb lines and levels.
- Install pre-assembled metal or wood frameworks for windows or doors to be fitted with glass panels, using hand tools.
- Fabricate or install metal sashes or moldings for glass installation, using aluminum or steel framing.
- Operate cranes or hoists with suction cups to lift large, heavy pieces of glass.
- Set glass doors into frames and bolt metal hinges, handles, locks, or other hardware to attach doors to frames and walls.
- Cut, fit, install, repair, or replace glass or glass substitutes, such as plastic or aluminum, in building interiors or exteriors or in furniture or other products.
- Drive trucks to installation sites and unload mirrors, glass equipment, or tools.
- Load and arrange glass or mirrors onto delivery trucks, using suction cups or cranes to lift glass.
- Measure mirrors and dimensions of areas to be covered to determine work procedures.
- Cut and attach mounting strips, metal or wood moldings, rubber gaskets, or metal clips to surfaces in preparation for mirror installation.
- Pack spaces between moldings and glass with glazing compounds and trim excess material with glazing knives.
- Assemble, erect, or dismantle scaffolds, rigging, or hoisting equipment.
- Cut and remove broken glass prior to installing replacement glass.
- Secure mirrors in position, using mastic cement, putty, bolts, or screws.
- Measure and mark outlines or patterns on glass to indicate cutting lines.
- Fasten glass panes into wood sashes or frames with clips, points, or moldings, adding weather seals or putty around pane edges to seal joints.
- Score glass with cutters' wheels, breaking off excess glass by hand or with notched tools.
- Cut, assemble, fit, or attach metal-framed glass enclosures for showers, bathtubs, display cases, skylights, solariums, or other structures.
- Prepare glass for cutting by resting it on rack edges or against cutting tables and brushing thin layer of oil along cutting lines or dipping cutting tools in oil.
- Move furniture to clear work sites and cover floors or furnishings with drop cloths.
- Confer with customers to determine project requirements or to provide cost estimates.
- Select the type or color of glass or mirror according to specifications.
- Measure, cut, fit, and press anti-glare adhesive film to glass or spray glass with tinting solution to prevent light glare.
- Assemble and cement sections of stained glass together.
- Create patterns on glass by etching, sandblasting, or painting designs.
- Grind or polish glass, smoothing edges when necessary.
- Smooth rough spots to prepare surfaces for waterproofing, using hammers, chisels, or rubbing bricks.
- Inspect problem roofs to determine the best repair procedures.
- Remove snow, water, or debris from roofs prior to applying roofing materials.
- Set up scaffolding to provide safe access to roofs.
- Estimate materials and labor required to complete roofing jobs.
- Cement or nail flashing strips of metal or shingle over joints to make them watertight.
- Install partially overlapping layers of material over roof insulation surfaces, using chalk lines, gauges on shingling hatchets, or lines on shingles.
- Cut felt, shingles, or strips of flashing to fit angles formed by walls, vents, or intersecting roof surfaces.
- Apply plastic coatings, membranes, fiberglass, or felt over sloped roofs before applying shingles.
- Install, repair, or replace single-ply roofing systems, using waterproof sheet materials such as modified plastics, elastomeric, or other asphaltic compositions.
- Attach roofing paper to roofs in overlapping strips to form bases for other materials.
- Cover roofs or exterior walls of structures with slate, asphalt, aluminum, wood, gravel, gypsum, or related materials, using brushes, knives, punches, hammers, or other tools.
- Waterproof or damp-proof walls, floors, roofs, foundations, or basements by painting or spraying surfaces with waterproof coatings or by attaching waterproofing membranes to surfaces.
- Apply reflective roof coatings, such as special paints or single-ply roofing sheets, to existing roofs to reduce solar heat absorption.
- Apply alternate layers of hot asphalt or tar and roofing paper to roofs.
- Install vapor barriers or layers of insulation on flat roofs.
- Cover exposed nailheads with roofing cement or caulking to prevent water leakage or rust.
- Glaze top layers to make a smooth finish or embed gravel in the bitumen for rough surfaces.
- Mop or pour hot asphalt or tar onto roof bases.
- Install attic ventilation systems, such as turbine vents, gable or ridge vents, or conventional or solar-powered exhaust fans.
- Install skylights on roofs to increase natural light inside structures or to reduce energy costs.
- Apply gravel or pebbles over top layers of roofs, using rakes or stiff-bristled brooms.
- Install solar roofing systems that have energy-collecting photovoltaic panels built into roofing membranes, shingles, or tiles.
- Spray roofs, sidings, or walls to bind, seal, insulate, or soundproof sections of structures, using spray guns, air compressors, or heaters.
- Attach solar panels to existing roofs, according to specifications and without damaging roofing materials or the structural integrity of buildings.
- Punch holes in slate, tile, terra cotta, or wooden shingles, using punches and hammers.
- Apply modular soil- and plant-containing grids over existing roof membranes to create green roofs.
- Install layers of vegetation-based green roofs, including protective membranes, drainage, aeration, water retention and filter layers, soil substrates, irrigation materials, and plants.
- Smooth rough spots to prepare surfaces for waterproofing, using hammers, chisels, or rubbing bricks.
- Grind, scrape, sand, or polish surfaces, such as concrete, marble, terrazzo, or wood flooring, using abrasive tools or machines.
- Tend pumps, compressors, or generators to provide power for tools, machinery, or equipment or to heat or move materials, such as asphalt.
- Lubricate, clean, or repair machinery, equipment, or tools.
- Signal equipment operators to facilitate alignment, movement, or adjustment of machinery, equipment, or materials.
- Read plans, instructions, or specifications to determine work activities.
- Measure, mark, or record openings or distances to layout areas where construction work will be performed.
- Clean or prepare construction sites to eliminate possible hazards.
- Dig ditches or trenches, backfill excavations, or compact and level earth to grade specifications, using picks, shovels, pneumatic tampers, or rakes.
- Load, unload, or identify building materials, machinery, or tools, distributing them to the appropriate locations, according to project plans or specifications.
- Position, join, align, or seal structural components, such as concrete wall sections or pipes.
- Perform site activities required of green certified construction practices, such as implementing waste management procedures, identifying materials for reuse, or installing erosion or sedimentation control mechanisms.
- Control traffic passing near, in, or around work zones.
- Install sewer, water, or storm drain pipes, using pipe-laying machinery or laser guidance equipment.
- Operate or maintain air monitoring or other sampling devices in confined or hazardous environments.
- Smooth or finish freshly poured cement or concrete, using floats, trowels, screeds, or powered cement finishing tools.
- Erect or dismantle scaffolding, shoring, braces, traffic barricades, ramps, or other temporary structures.
- Provide assistance to craft workers, such as carpenters, plasterers, or masons.
- Perform building weatherization tasks, such as repairing windows, adding insulation, or applying weather-stripping materials.
- Apply weather-stripping to reduce energy loss.
- Spray materials, such as water, sand, steam, vinyl, paint, or stucco, through hoses to clean, coat, or seal surfaces.
- Raze buildings or salvage useful materials.
- Mop, brush, or spread paints, cleaning solutions, or other compounds over surfaces to clean them or to provide protection.
- Position or dismantle forms for pouring concrete, using saws, hammers, nails, or bolts.
- Place, consolidate, or protect case-in-place concrete or masonry structures.
- Mix ingredients to create compounds for covering or cleaning surfaces.
- Mix, pour, or spread concrete, using portable cement mixers.
- Operate jackhammers or drills to break up concrete or pavement.
- Apply caulking compounds by hand or caulking guns to protect against entry of water or air.
- Tend machines that pump concrete, grout, cement, sand, plaster, or stucco through spray guns for application to ceilings or walls.
- Identify, pack, or transport hazardous or radioactive materials.
- Use computers or other input devices to control robotic pipe cutters or cleaners.
- Perform construction laborer duties at green building sites, such as renewable energy plants or wind turbine installations.
- Grind, scrape, sand, or polish surfaces, such as concrete, marble, terrazzo, or wood flooring, using abrasive tools or machines.