- Clean and prepare surfaces for applications of plaster, cement, stucco, or similar materials, such as by drywall taping.
Occupations with related tasks Save Table: XLSX CSV
Closely Related Tasks | All Related Tasks | Job Zone | Code | Occupation |
3 | 12 | 1 | 47-2051.00 | Cement Masons and Concrete Finishers |
3 | 11 | 2 | 47-2053.00 | Terrazzo Workers and Finishers |
3 | 3 | 2 | 47-2141.00 | Painters, Construction and Maintenance |
2 | 8 | 2 | 47-2061.00 | Construction Laborers
|
2 | 5 | 2 | 47-2142.00 | Paperhangers |
2 | 4 | 2 | 47-2042.00 | Floor Layers, Except Carpet, Wood, and Hard Tiles
|
2 | 4 | 2 | 47-3011.00 | Helpers--Brickmasons, Blockmasons, Stonemasons, and Tile and Marble Setters |
2 | 4 | 2 | 51-9124.00 | Coating, Painting, and Spraying Machine Setters, Operators, and Tenders |
1 | 7 | 2 | 47-2044.00 | Tile and Stone Setters
|
1 | 5 | 1 | 47-3014.00 | Helpers--Painters, Paperhangers, Plasterers, and Stucco Masons |
1 | 5 | 2 | 47-3016.00 | Helpers--Roofers |
1 | 3 | 2 | 47-2082.00 | Tapers |
1 | 2 | 2 | 47-2041.00 | Carpet Installers |
1 | 1 | 2 | 47-2131.00 | Insulation Workers, Floor, Ceiling, and Wall |
1 | 1 | 2 | 47-2132.00 | Insulation Workers, Mechanical |
1 | 1 | 2 | 47-2021.00 | Brickmasons and Blockmasons |
1 | 1 | 2 | 47-2081.00 | Drywall and Ceiling Tile Installers |
- Wet surface to prepare for bonding, fill holes and cracks with grout or slurry, and smooth, using trowel.
- Clean chipped area, using wire brush, and feel and observe surface to determine if it is rough or uneven.
- Apply muriatic acid to clean surface, and rinse with water.
- Spread, level, and smooth concrete, using rake, shovel, hand or power trowel, hand or power screed, and float.
- Mold expansion joints and edges, using edging tools, jointers, and straightedge.
- Signal truck driver to position truck to facilitate pouring concrete, and move chute to direct concrete on forms.
- Produce rough concrete surface, using broom.
- Apply hardening and sealing compounds to cure surface of concrete, and waterproof or restore surface.
- Operate power vibrator to compact concrete.
- Install anchor bolts, steel plates, door sills and other fixtures in freshly poured concrete or pattern or stamp the surface to provide a decorative finish.
- Wet concrete surface, and rub with stone to smooth surface and obtain specified finish.
- Spread roofing paper on surface of foundation, and spread concrete onto roofing paper with trowel to form terrazzo base.
- Check the forms that hold the concrete to see that they are properly constructed.
- Set the forms that hold concrete to the desired pitch and depth, and align them.
- Monitor how the wind, heat, or cold affect the curing of the concrete throughout the entire process.
- Direct the casting of the concrete and supervise laborers who use shovels or special tools to spread it.
- Waterproof or restore concrete surfaces, using appropriate compounds.
- Mix cement, sand, and water to produce concrete, grout, or slurry, using hoe, trowel, tamper, scraper, or concrete-mixing machine.
- Chip, scrape, and grind high spots, ridges, and rough projections to finish concrete, using pneumatic chisels, power grinders, or hand tools.
- Cut out damaged areas, drill holes for reinforcing rods, and position reinforcing rods to repair concrete, using power saw and drill.
- Build wooden molds, and clamp molds around area to be repaired, using hand tools.
- Sprinkle colored marble or stone chips, powdered steel, or coloring powder over surface to produce prescribed finish.
- Fabricate concrete beams, columns, and panels.
- Polish surface, using polishing or surfacing machine.
- Cut metal division strips, and press them into terrazzo base so that top edges form desired design or pattern.
- Push roller over surface to embed chips in surface.
- Wet surface to prepare for bonding, fill holes and cracks with grout or slurry, and smooth, using trowel.
- Clean chipped area, using wire brush, and feel and observe surface to determine if it is rough or uneven.
- Apply muriatic acid to clean surface, and rinse with water.
- Spread, level, and smooth concrete, using rake, shovel, hand or power trowel, hand or power screed, and float.
- Mold expansion joints and edges, using edging tools, jointers, and straightedge.
- Signal truck driver to position truck to facilitate pouring concrete, and move chute to direct concrete on forms.
- Produce rough concrete surface, using broom.
- Apply hardening and sealing compounds to cure surface of concrete, and waterproof or restore surface.
- Operate power vibrator to compact concrete.
- Install anchor bolts, steel plates, door sills and other fixtures in freshly poured concrete or pattern or stamp the surface to provide a decorative finish.
- Wet concrete surface, and rub with stone to smooth surface and obtain specified finish.
- Spread roofing paper on surface of foundation, and spread concrete onto roofing paper with trowel to form terrazzo base.
- Wash polished terrazzo surface, using cleaner and water, and apply sealer and curing agent according to manufacturer's specifications, using brush or sprayer.
- Wet surface to prepare for bonding, fill holes and cracks with grout or slurry, and smooth with a trowel.
- Clean chipped area, using wire brush, and feel and observe surface to determine if it is rough or uneven.
- Spread, level, or smooth concrete or terrazzo mixtures to form bases or finished surfaces, using rakes, shovels, hand or power trowels, hand or power screeds, or floats.
- Clean installation site, mixing and storage areas, tools, machines, and equipment, and store materials and equipment.
- Mold expansion joints and edges, using edging tools, jointers, or straightedges.
- Precast terrazzo blocks in wooden forms.
- Wet concrete surface and rub with stone to smooth surface and obtain specified finish.
- Spread roofing paper on surface of foundation and spread concrete onto roofing paper with trowel to form terrazzo base.
- Produce rough concrete surface, using broom.
- Signal truck driver to position truck to facilitate pouring concrete and move chute to direct concrete on forms.
- Measure designated amounts of ingredients for terrazzo or grout, according to standard formulas and specifications, using graduated containers and scales, and load ingredients into portable mixer.
- Grind surfaces with a power grinder, or polish surfaces with polishing or surfacing machines.
- Cut metal division strips and press them into the terrazzo base for joints or changes of color to form designs or patterns or to help prevent cracks.
- Blend marble chip mixtures, place into panels, and push a roller over the surface to embed the chips.
- Modify mixing, grouting, grinding, or cleaning procedures, according to type of installation or material used.
- Grind curved surfaces or areas inaccessible to surfacing machine, such as stairways or cabinet tops, with portable hand grinder.
- Position and secure moisture membrane and wire mesh in preparation for pouring base materials for terrazzo installation.
- Fill slight grinding depressions with matching grout material and hand-trowel for a smooth, uniform surface.
- Sprinkle colored marble or stone chips, powdered steel, or coloring powder over surface to produce prescribed finish.
- Mix cement, sand, and water to produce concrete, grout, or slurry, using hoe, trowel, tamper, scraper, or concrete-mixing machine.
- Chip, scrape, or grind high spots, ridges, or rough projections to finish concrete, using pneumatic chisel, hand chisel, or other hand tools.
- Move terrazzo installation materials, tools, machines, or work devices to work areas, manually or using wheelbarrow.
- Repair concrete by cutting out damaged areas, drilling holes for reinforcing rods, and positioning reinforcing rods, using power saw and drill.
- Build wooden molds, clamping molds around areas to be repaired, or setting up frames to the proper depth and alignment.
- Remove frames when the foundation is dry.
- Wash polished terrazzo surface, using cleaner and water, and apply sealer and curing agent according to manufacturer's specifications, using brush or sprayer.
- Wet surface to prepare for bonding, fill holes and cracks with grout or slurry, and smooth with a trowel.
- Clean chipped area, using wire brush, and feel and observe surface to determine if it is rough or uneven.
- Spread, level, or smooth concrete or terrazzo mixtures to form bases or finished surfaces, using rakes, shovels, hand or power trowels, hand or power screeds, or floats.
- Clean installation site, mixing and storage areas, tools, machines, and equipment, and store materials and equipment.
- Mold expansion joints and edges, using edging tools, jointers, or straightedges.
- Precast terrazzo blocks in wooden forms.
- Wet concrete surface and rub with stone to smooth surface and obtain specified finish.
- Spread roofing paper on surface of foundation and spread concrete onto roofing paper with trowel to form terrazzo base.
- Produce rough concrete surface, using broom.
- Signal truck driver to position truck to facilitate pouring concrete and move chute to direct concrete on forms.
- Apply primers or sealers to prepare new surfaces, such as bare wood or metal, for finish coats.
- Wash and treat surfaces with oil, turpentine, mildew remover, or other preparations, and sand rough spots to ensure that finishes will adhere properly.
- Remove old finishes by stripping, sanding, wire brushing, burning, or using water or abrasive blasting.
- Fill cracks, holes, or joints with caulk, putty, plaster, or other fillers, using caulking guns or putty knives.
- Cover surfaces with dropcloths or masking tape and paper to protect surfaces during painting.
- Smooth surfaces, using sandpaper, scrapers, brushes, steel wool, or sanding machines.
- Read work orders or receive instructions from supervisors or homeowners to determine work requirements.
- Apply paint, stain, varnish, enamel, or other finishes to equipment, buildings, bridges, or other structures, using brushes, spray guns, or rollers.
- Erect scaffolding or swing gates, or set up ladders, to work above ground level.
- Mix and match colors of paint, stain, or varnish with oil or thinning and drying additives to obtain desired colors and consistencies.
- Calculate amounts of required materials and estimate costs, based on surface measurements or work orders.
- Polish final coats to specified finishes.
- Select and purchase tools or finishes for surfaces to be covered, considering durability, ease of handling, methods of application, and customers' wishes.
- Remove fixtures such as pictures, door knobs, lamps, or electric switch covers prior to painting.
- Use special finishing techniques such as sponging, ragging, layering, or faux finishing.
- Cut stencils and brush or spray lettering or decorations on surfaces.
- Waterproof buildings, using waterproofers or caulking.
- Spray or brush hot plastics or pitch onto surfaces.
- Bake finishes on painted or enameled articles, using baking ovens.
- Apply primers or sealers to prepare new surfaces, such as bare wood or metal, for finish coats.
- Wash and treat surfaces with oil, turpentine, mildew remover, or other preparations, and sand rough spots to ensure that finishes will adhere properly.
- Remove old finishes by stripping, sanding, wire brushing, burning, or using water or abrasive blasting.
- Spray materials, such as water, sand, steam, vinyl, paint, or stucco, through hoses to clean, coat, or seal surfaces.
- Mop, brush, or spread paints, cleaning solutions, or other compounds over surfaces to clean them or to provide protection.
- Lubricate, clean, or repair machinery, equipment, or tools.
- Clean or prepare construction sites to eliminate possible hazards.
- Dig ditches or trenches, backfill excavations, or compact and level earth to grade specifications, using picks, shovels, pneumatic tampers, or rakes.
- Smooth or finish freshly poured cement or concrete, using floats, trowels, screeds, or powered cement finishing tools.
- Provide assistance to craft workers, such as carpenters, plasterers, or masons.
- Mix, pour, or spread concrete, using portable cement mixers.
- Tend pumps, compressors, or generators to provide power for tools, machinery, or equipment or to heat or move materials, such as asphalt.
- Signal equipment operators to facilitate alignment, movement, or adjustment of machinery, equipment, or materials.
- Read plans, instructions, or specifications to determine work activities.
- Measure, mark, or record openings or distances to layout areas where construction work will be performed.
- Load, unload, or identify building materials, machinery, or tools, distributing them to the appropriate locations, according to project plans or specifications.
- Position, join, align, or seal structural components, such as concrete wall sections or pipes.
- Perform site activities required of green certified construction practices, such as implementing waste management procedures, identifying materials for reuse, or installing erosion or sedimentation control mechanisms.
- Control traffic passing near, in, or around work zones.
- Install sewer, water, or storm drain pipes, using pipe-laying machinery or laser guidance equipment.
- Operate or maintain air monitoring or other sampling devices in confined or hazardous environments.
- Erect or dismantle scaffolding, shoring, braces, traffic barricades, ramps, or other temporary structures.
- Perform building weatherization tasks, such as repairing windows, adding insulation, or applying weather-stripping materials.
- Apply weather-stripping to reduce energy loss.
- Raze buildings or salvage useful materials.
- Position or dismantle forms for pouring concrete, using saws, hammers, nails, or bolts.
- Grind, scrape, sand, or polish surfaces, such as concrete, marble, terrazzo, or wood flooring, using abrasive tools or machines.
- Place, consolidate, or protect case-in-place concrete or masonry structures.
- Mix ingredients to create compounds for covering or cleaning surfaces.
- Operate jackhammers or drills to break up concrete or pavement.
- Apply caulking compounds by hand or caulking guns to protect against entry of water or air.
- Tend machines that pump concrete, grout, cement, sand, plaster, or stucco through spray guns for application to ceilings or walls.
- Identify, pack, or transport hazardous or radioactive materials.
- Use computers or other input devices to control robotic pipe cutters or cleaners.
- Perform construction laborer duties at green building sites, such as renewable energy plants or wind turbine installations.
- Spray materials, such as water, sand, steam, vinyl, paint, or stucco, through hoses to clean, coat, or seal surfaces.
- Mop, brush, or spread paints, cleaning solutions, or other compounds over surfaces to clean them or to provide protection.
- Lubricate, clean, or repair machinery, equipment, or tools.
- Clean or prepare construction sites to eliminate possible hazards.
- Dig ditches or trenches, backfill excavations, or compact and level earth to grade specifications, using picks, shovels, pneumatic tampers, or rakes.
- Smooth or finish freshly poured cement or concrete, using floats, trowels, screeds, or powered cement finishing tools.
- Provide assistance to craft workers, such as carpenters, plasterers, or masons.
- Mix, pour, or spread concrete, using portable cement mixers.
- Apply sizing to seal surfaces and maximize adhesion of coverings to surfaces.
- Remove paint, varnish, dirt, and grease from surfaces, using paint remover and water soda solutions.
- Apply adhesives to the backs of paper strips, using brushes, or dunk strips of prepasted wallcovering in water, wiping off any excess adhesive.
- Apply thinned glue to waterproof porous surfaces, using brushes, rollers, or pasting machines.
- Mix paste, using paste powder and water, and brush paste onto surfaces.
- Smooth strips or sections of paper with brushes or rollers to remove wrinkles and bubbles and to smooth joints.
- Trim rough edges from strips, using straightedges and trimming knives.
- Trim excess material at ceilings or baseboards, using knives.
- Check finished wallcoverings for proper alignment, pattern matching, and neatness of seams.
- Mark vertical guidelines on walls to align strips, using plumb bobs and chalk lines.
- Cover interior walls and ceilings of rooms with decorative wallpaper or fabric, using hand tools.
- Measure and cut strips from rolls of wallpaper or fabric, using shears or razors.
- Place strips or sections of paper on surfaces, aligning section edges and patterns.
- Fill holes, cracks, and other surface imperfections preparatory to covering surfaces.
- Measure surfaces or review work orders to estimate the quantities of materials needed.
- Smooth rough spots on walls and ceilings, using sandpaper.
- Set up equipment, such as pasteboards and scaffolds.
- Remove old paper, using water, steam machines, or solvents and scrapers.
- Staple or tack advertising posters onto fences, walls, billboards, or poles.
- Apply acetic acid to damp plaster to prevent lime from bleeding through paper.
- Apply sizing to seal surfaces and maximize adhesion of coverings to surfaces.
- Remove paint, varnish, dirt, and grease from surfaces, using paint remover and water soda solutions.
- Apply adhesives to the backs of paper strips, using brushes, or dunk strips of prepasted wallcovering in water, wiping off any excess adhesive.
- Apply thinned glue to waterproof porous surfaces, using brushes, rollers, or pasting machines.
- Mix paste, using paste powder and water, and brush paste onto surfaces.
- Sweep, scrape, sand, or chip dirt and irregularities to clean base surfaces, correcting imperfections that may show through the covering.
- Form a smooth foundation by stapling plywood or Masonite over the floor or by brushing waterproof compound onto surface and filling cracks with plaster, putty, or grout to seal pores.
- Roll and press sheet wall and floor covering into cement base to smooth and finish surface, using hand roller.
- Apply adhesive cement to floor or wall material to join and adhere foundation material.
- Cut flooring material to fit around obstructions.
- Inspect surface to be covered to ensure that it is firm and dry.
- Trim excess covering materials, tack edges, and join sections of covering material to form tight joint.
- Measure and mark guidelines on surfaces or foundations, using chalk lines and dividers.
- Cut covering and foundation materials, according to blueprints and sketches.
- Determine traffic areas and decide location of seams.
- Lay out, position, and apply shock-absorbing, sound-deadening, or decorative coverings to floors, walls, and cabinets, following guidelines to keep courses straight and create designs.
- Remove excess cement to clean finished surface.
- Disconnect and remove appliances, light fixtures, and worn floor and wall covering from floors, walls, and cabinets.
- Heat and soften floor covering materials to patch cracks or fit floor coverings around irregular surfaces, using blowtorch.
- Sweep, scrape, sand, or chip dirt and irregularities to clean base surfaces, correcting imperfections that may show through the covering.
- Form a smooth foundation by stapling plywood or Masonite over the floor or by brushing waterproof compound onto surface and filling cracks with plaster, putty, or grout to seal pores.
- Roll and press sheet wall and floor covering into cement base to smooth and finish surface, using hand roller.
- Apply adhesive cement to floor or wall material to join and adhere foundation material.
- Clean installation surfaces, equipment, tools, work sites, or storage areas, using water, chemical solutions, oxygen lances, or polishing machines.
- Remove damaged tile, brick, or mortar, and clean or prepare surfaces, using pliers, hammers, chisels, drills, wire brushes, or metal wire anchors.
- Provide assistance in the preparation, installation, repair, or rebuilding of tile, brick, or stone surfaces.
- Locate and supply materials to masons for installation, following drawings or numbered sequences.
- Mix mortar, plaster, and grout, manually or using machines, according to standard formulas.
- Erect scaffolding or other installation structures.
- Cut materials to specified sizes for installation, using power saws or tile cutters.
- Modify material moving, mixing, grouting, grinding, polishing, or cleaning procedures, according to installation or material requirements.
- Transport materials, tools, or machines to installation sites, manually or using conveyance equipment.
- Arrange or store materials, machines, tools, or equipment.
- Move or position materials such as marble slabs, using cranes, hoists, or dollies.
- Remove excess grout or residue from tile or brick joints, using sponges or trowels.
- Apply grout between joints of bricks or tiles, using grouting trowels.
- Apply caulk, sealants, or other agents to installed surfaces.
- Correct surface imperfections or fill chipped, cracked, or broken bricks or tiles, using fillers, adhesives, or grouting materials.
- Clean installation surfaces, equipment, tools, work sites, or storage areas, using water, chemical solutions, oxygen lances, or polishing machines.
- Remove damaged tile, brick, or mortar, and clean or prepare surfaces, using pliers, hammers, chisels, drills, wire brushes, or metal wire anchors.
- Provide assistance in the preparation, installation, repair, or rebuilding of tile, brick, or stone surfaces.
- Locate and supply materials to masons for installation, following drawings or numbered sequences.
- Remove grease, dirt, paint, or rust from surfaces in preparation for paint application, using abrasives, solvents, brushes, blowtorches, washing tanks, or sandblasters.
- Sand and apply sealer to properly dried finish.
- Disassemble, clean, and reassemble sprayers or power equipment, using solvents, wire brushes, and cloths.
- Clean equipment and work areas.
- Dispose of hazardous waste in an appropriate manner.
- Hold or position spray guns to direct spray onto articles.
- Spray prepared surfaces with specified amounts of primers and decorative or finish coatings.
- Monitor painting operations to identify flaws, such as blisters or streaks, and correct their causes.
- Fill hoppers, reservoirs, troughs, or pans with material used to coat, paint, or spray, using conveyors or pails.
- Apply rust-resistant undercoats and caulk and seal seams.
- Start and stop operation of machines, using levers or buttons.
- Determine paint flow, viscosity, and coating quality by performing visual inspections, or by using viscometers.
- Attach hoses or nozzles to machines, using wrenches and pliers, and make adjustments to obtain the proper dispersion of spray.
- Turn dials, handwheels, valves, or switches to regulate conveyor speeds, machine temperature, air pressure and circulation, and the flow or spray of coatings or paints.
- Observe machine gauges and equipment operation to detect defects or deviations from standards, and make adjustments as necessary.
- Examine, measure, weigh, or test sample products to ensure conformance to specifications.
- Buff and wax the finished paintwork.
- Use brush to hand-paint areas in need of retouching or unreachable with a spray gun.
- Thread or feed items or products through or around machine rollers and dryers.
- Weigh or measure chemicals, coatings, or paints before adding them to machines.
- Operate auxiliary machines or equipment used in coating or painting processes.
- Remove materials, parts, or workpieces from painting or coating machines, using hand tools.
- Record operational data on specified forms.
- Operate lifting or moving devices to move equipment or materials to access areas to be painted.
- Prepare and apply stencils, computer-generated decals, or other decorative items to finished products.
- Set up portable equipment, such as ventilators, exhaust units, ladders, or scaffolding.
- Adjust controls on infrared ovens, heat lamps, portable ventilators, or exhaust units to speed the drying of surfaces between coats.
- Apply primer over any repairs made to surfaces.
- Fill small dents or scratches with body fillers and smooth surfaces to prepare for painting.
- Mix paints to match color specifications or original colors, stirring or thinning paints, using spatulas or power mixing equipment.
- Remove grease, dirt, paint, or rust from surfaces in preparation for paint application, using abrasives, solvents, brushes, blowtorches, washing tanks, or sandblasters.
- Sand and apply sealer to properly dried finish.
- Disassemble, clean, and reassemble sprayers or power equipment, using solvents, wire brushes, and cloths.
- Clean equipment and work areas.
- Remove any old tile, grout and adhesive using chisels and scrapers and clean the surface carefully.
- Mix, apply, and spread plaster, concrete, mortar, cement, mastic, glue or other adhesives to form a bed for the tiles, using brush, trowel and screed.
- Apply mortar to tile back, position the tile, and press or tap with trowel handle to affix tile to base.
- Level concrete and allow to dry.
- Prepare surfaces for tiling by attaching lath or waterproof paper, or by applying a cement mortar coat to a metal screen.
- Spread mastic or other adhesive base on roof deck to form base for promenade tile, using serrated spreader.
- Brush glue onto manila paper on which design has been drawn and position tiles, finished side down, onto paper.
- Align and straighten tile using levels, squares, and straightedges.
- Finish and dress the joints and wipe excess grout from between tiles, using damp sponge.
- Cut and shape tile to fit around obstacles and into odd spaces and corners, using hand and power cutting tools.
- Determine and implement the best layout to achieve a desired pattern.
- Study blueprints and examine surface to be covered to determine amount of material needed.
- Measure and mark surfaces to be tiled, following blueprints.
- Lay and set mosaic tiles to create decorative wall, mural, and floor designs.
- Mix and apply mortar or cement to edges and ends of drain tiles to seal halves and joints.
- Apply a sealer to make grout stain- and water-resistant.
- Measure and cut metal lath to size for walls and ceilings, using tin snips.
- Install and anchor fixtures in designated positions, using hand tools.
- Remove and replace cracked or damaged tile.
- Cut tile backing to required size, using shears.
- Cut, surface, polish, and install marble and granite or install pre-cast terrazzo, granite or marble units.
- Assist customers in selection of tile and grout.
- Prepare cost and labor estimates, based on calculations of time and materials needed for project.
- Select and order tile and other items to be installed, such as bathroom accessories, walls, panels, and cabinets, according to specifications.
- Build underbeds and install anchor bolts, wires, and brackets.
- Remove any old tile, grout and adhesive using chisels and scrapers and clean the surface carefully.
- Mix, apply, and spread plaster, concrete, mortar, cement, mastic, glue or other adhesives to form a bed for the tiles, using brush, trowel and screed.
- Apply mortar to tile back, position the tile, and press or tap with trowel handle to affix tile to base.
- Level concrete and allow to dry.
- Prepare surfaces for tiling by attaching lath or waterproof paper, or by applying a cement mortar coat to a metal screen.
- Spread mastic or other adhesive base on roof deck to form base for promenade tile, using serrated spreader.
- Brush glue onto manila paper on which design has been drawn and position tiles, finished side down, onto paper.
- Place articles to be stripped into stripping tanks.
- Clean work areas and equipment.
- Perform support duties to assist painters, paperhangers, plasterers, or masons.
- Supply or hold tools and materials.
- Pour specified amounts of chemical solutions into stripping tanks.
- Apply protective coverings, such as masking tape, to articles or areas that could be damaged or stained by work processes.
- Erect scaffolding.
- Fill cracks or breaks in surfaces of plaster articles or areas with putty or epoxy compounds.
- Smooth surfaces of articles to be painted, using sanding and buffing tools and equipment.
- Mix plaster, and carry plaster to plasterers.
- Remove articles such as cabinets, metal furniture, and paint containers from stripping tanks after prescribed periods of time.
- Place articles to be stripped into stripping tanks.
- Clean work areas and equipment.
- Perform support duties to assist painters, paperhangers, plasterers, or masons.
- Supply or hold tools and materials.
- Pour specified amounts of chemical solutions into stripping tanks.
- Sweep and clean roofs to prepare them for the application of new roofing materials.
- Clean work areas and equipment.
- Provide assistance to skilled roofers installing and repairing roofs, flashings, and surfaces.
- Apply shingles, gravel, or asphalt over the top layer of tar to protect the roofing material.
- Clear drains and downspouts and clean gutters.
- Check to ensure that completed roofs are watertight.
- Locate worn or torn areas in roofs.
- Maintain tools and equipment.
- Cover roofs with layers of roofing felt or asphalt strips before installing tile, slate, or composition materials.
- Remove old roofing materials.
- Unload materials and tools from work trucks, and unroll roofing as directed.
- Set ladders, scaffolds, and hoists in place for taking supplies to roofs.
- Place tiles, nail them to roof boards, and cover nailheads with roofing cement.
- Attach roofing paper and composition shingles, using nails.
- Perform emergency leak repairs and general maintenance for a variety of roof types.
- Attach sheets of metal to roof boards or building frameworks when installing metal roofs.
- Hoist tar and roofing materials to roofs, using ropes and pulleys, or carry materials up ladders.
- Chop tar into small pieces, and heat chopped tar in kettles.
- Sweep and clean roofs to prepare them for the application of new roofing materials.
- Clean work areas and equipment.
- Provide assistance to skilled roofers installing and repairing roofs, flashings, and surfaces.
- Apply shingles, gravel, or asphalt over the top layer of tar to protect the roofing material.
- Clear drains and downspouts and clean gutters.
- Apply texturizing compounds or primers to walls or ceilings before final finishing, using trowels, brushes, rollers, or spray guns.
- Spread and smooth cementing material over tape, using trowels or floating machines to blend joints with wall surfaces.
- Use mechanical applicators that spread compounds and embed tape in one operation.
- Spread sealing compound between boards or panels or over cracks, holes, nail heads, or screw heads, using trowels, broadknives, or spatulas.
- Press paper tape over joints to embed tape into sealing compound and to seal joints.
- Apply additional coats to fill in holes and make surfaces smooth.
- Seal joints between plasterboard or other wallboard to prepare wall surfaces for painting or papering.
- Sand or patch nicks or cracks in plasterboard or wallboard.
- Mix sealing compounds by hand or with portable electric mixers.
- Work on high ceilings, using scaffolding or other tools, such as stilts.
- Select the correct sealing compound or tape.
- Countersink nails or screws below surfaces of walls before applying sealing compounds, using hammers or screwdrivers.
- Remove extra compound after surfaces have been covered sufficiently.
- Install metal molding at wall corners to secure wallboard.
- Check adhesives to ensure that they will work and will remain durable.
- Sand rough spots of dried cement between applications of compounds.
- Apply texturizing compounds or primers to walls or ceilings before final finishing, using trowels, brushes, rollers, or spray guns.
- Spread and smooth cementing material over tape, using trowels or floating machines to blend joints with wall surfaces.
- Use mechanical applicators that spread compounds and embed tape in one operation.
- Inspect the surface to be covered to determine its condition, and correct any imperfections that might show through carpet or cause carpet to wear unevenly.
- Clean up before and after installation, including vacuuming carpet and discarding remnant pieces.
- Roll out, measure, mark, and cut carpeting to size with a carpet knife, following floor sketches and allowing extra carpet for final fitting.
- Join edges of carpet and seam edges where necessary, by sewing or by using tape with glue and heated carpet iron.
- Cut and trim carpet to fit along wall edges, openings, and projections, finishing the edges with a wall trimmer.
- Plan the layout of the carpet, allowing for expected traffic patterns and placing seams for best appearance and longest wear.
- Stretch carpet to align with walls and ensure a smooth surface, and press carpet in place over tack strips or use staples, tape, tacks or glue to hold carpet in place.
- Take measurements and study floor sketches to calculate the area to be carpeted and the amount of material needed.
- Install carpet on some floors using adhesive, following prescribed method.
- Measure, cut and install tackless strips along the baseboard or wall.
- Nail tack strips around area to be carpeted or use old strips to attach edges of new carpet.
- Cut carpet padding to size and install padding, following prescribed method.
- Fasten metal treads across door openings or where carpet meets flooring to hold carpet in place.
- Draw building diagrams and record dimensions.
- Move furniture from area to be carpeted and remove old carpet and padding.
- Cut and bind material.
- Inspect the surface to be covered to determine its condition, and correct any imperfections that might show through carpet or cause carpet to wear unevenly.
- Clean up before and after installation, including vacuuming carpet and discarding remnant pieces.
- Prepare surfaces for insulation application by brushing or spreading on adhesives, cement, or asphalt, or by attaching metal pins to surfaces.
- Measure and cut insulation for covering surfaces, using tape measures, handsaws, power saws, knives, or scissors.
- Fit, wrap, staple, or glue insulating materials to structures or surfaces, using hand tools or wires.
- Cover and line structures with blown or rolled forms of materials to insulate against cold, heat, or moisture, using saws, knives, rasps, trowels, blowers, or other tools and implements.
- Distribute insulating materials evenly into small spaces within floors, ceilings, or walls, using blowers and hose attachments, or cement mortars.
- Move controls, buttons, or levers to start blowers and regulate flow of materials through nozzles.
- Fill blower hoppers with insulating materials.
- Cover, seal, or finish insulated surfaces or access holes with plastic covers, canvas strips, sealants, tape, cement or asphalt mastic.
- Read blueprints, and select appropriate insulation, based on space characteristics and the heat retaining or excluding characteristics of the material.
- Remove old insulation, such as asbestos, following safety procedures.
- Prepare surfaces for insulation application by brushing or spreading on adhesives, cement, or asphalt, or by attaching metal pins to surfaces.
- Prepare surfaces for insulation application by brushing or spreading on adhesives, cement, or asphalt, or by attaching metal pins to surfaces.
- Measure and cut insulation for covering surfaces, using tape measures, handsaws, knives, and scissors.
- Apply, remove, and repair insulation on industrial equipment, pipes, ductwork, or other mechanical systems such as heat exchangers, tanks, and vessels, to help control noise and maintain temperatures.
- Select appropriate insulation, such as fiberglass, Styrofoam, or cork, based on the heat retaining or excluding characteristics of the material.
- Fit insulation around obstructions, and shape insulating materials and protective coverings as required.
- Determine the amounts and types of insulation needed, and methods of installation, based on factors such as location, surface shape, and equipment use.
- Cover, seal, or finish insulated surfaces or access holes with plastic covers, canvas strips, sealants, tape, cement, or asphalt mastic.
- Install sheet metal around insulated pipes with screws to protect the insulation from weather conditions or physical damage.
- Read blueprints and specifications to determine job requirements.
- Distribute insulating materials evenly into small spaces within floors, ceilings, or walls, using blowers and hose attachments or cement mortar.
- Remove or seal off old asbestos insulation, following safety procedures.
- Fill blower hoppers with insulating materials.
- Move controls, buttons, or levers to start blowers, and to regulate flow of materials through nozzles.
- Prepare surfaces for insulation application by brushing or spreading on adhesives, cement, or asphalt, or by attaching metal pins to surfaces.
- Clean working surface to remove scale, dust, soot, or chips of brick and mortar, using broom, wire brush, or scraper.
- Measure distance from reference points and mark guidelines to lay out work, using plumb bobs and levels.
- Construct corners by fastening in plumb position a corner pole or building a corner pyramid of bricks, and filling in between the corners using a line from corner to corner to guide each course, or layer, of brick.
- Apply and smooth mortar or other mixture over work surface.
- Calculate angles and courses and determine vertical and horizontal alignment of courses.
- Break or cut bricks, tiles, or blocks to size, using trowel edge, hammer, or power saw.
- Interpret blueprints and drawings to determine specifications and to calculate the materials required.
- Remove excess mortar with trowels and hand tools, and finish mortar joints with jointing tools, for a sealed, uniform appearance.
- Fasten or fuse brick or other building material to structure with wire clamps, anchor holes, torch, or cement.
- Examine brickwork or structure to determine need for repair.
- Mix specified amounts of sand, clay, dirt, or mortar powder with water to form refractory mixtures.
- Remove burned or damaged brick or mortar, using sledgehammer, crowbar, chipping gun, or chisel.
- Lay and align bricks, blocks, or tiles to build or repair structures or high temperature equipment, such as cupola, kilns, ovens, or furnaces.
- Spray or spread refractory material over brickwork to protect against deterioration.
- Clean working surface to remove scale, dust, soot, or chips of brick and mortar, using broom, wire brush, or scraper.
- Wash concrete surfaces before mounting tile to increase adhesive qualities of surfaces, using washing soda and zinc sulfate solution.
- Read blueprints or other specifications to determine methods of installation, work procedures, or material or tool requirements.
- Measure and mark surfaces to lay out work, according to blueprints or drawings, using tape measures, straightedges or squares, and marking devices.
- Fit and fasten wallboard or drywall into position on wood or metal frameworks, using glue, nails, or screws.
- Measure and cut openings in panels or tiles for electrical outlets, windows, vents, plumbing, or other fixtures, using keyhole saws or other cutting tools.
- Assemble or install metal framing or decorative trim for windows, doorways, or vents.
- Cut metal or wood framing and trim to size, using cutting tools.
- Inspect furrings, mechanical mountings, or masonry surfaces for plumbness and level, using spirit or water levels.
- Cut fixture or border tiles to size, using keyhole saws, and insert them into surrounding frameworks.
- Cut and screw together metal channels to make floor or ceiling frames, according to plans for the location of rooms or hallways.
- Hang drywall panels on metal frameworks of walls and ceilings in offices, schools, or other large buildings, using lifts or hoists to adjust panel heights, when necessary.
- Trim rough edges from wallboard to maintain even joints, using knives.
- Suspend angle iron grids or channel irons from ceilings, using wire.
- Coordinate work with drywall finishers who cover the seams between drywall panels.
- Install horizontal and vertical metal or wooden studs to frames so that wallboard can be attached to interior walls.
- Scribe and cut edges of tile to fit walls where wall molding is not specified.
- Hang dry lines to wall moldings to guide positioning of main runners.
- Fasten metal or rockboard lath to the structural framework of walls, ceilings, or partitions of buildings, using nails, screws, staples, or wire-ties.
- Install blanket insulation between studs and tack plastic moisture barriers over insulation.
- Seal joints between ceiling tiles and walls.
- Remove existing plaster, drywall, or paneling, using crowbars and hammers.
- Apply or mount acoustical tile or blocks, strips, or sheets of shock-absorbing materials to ceilings or walls of buildings to reduce reflection of sound or to decorate rooms.
- Mount tile, using adhesives, or by nailing, screwing, stapling, or wire-tying lath directly to structural frameworks.
- Nail channels or wood furring strips to surfaces to provide mounting for tile.
- Install metal lath where plaster applications will be exposed to weather or water, or for curved or irregular surfaces.
- Apply cement to backs of tiles and press tiles into place, aligning them with layout marks or joints of previously laid tile.
- Wash concrete surfaces before mounting tile to increase adhesive qualities of surfaces, using washing soda and zinc sulfate solution.