- Remove damaged tile, brick, or mortar, and clean or prepare surfaces, using pliers, hammers, chisels, drills, wire brushes, or metal wire anchors.
Occupations with related tasks Save Table: XLSX CSV
Closely Related Tasks | All Related Tasks | Job Zone | Code | Occupation |
3 | 12 | 1 | 47-2051.00 | Cement Masons and Concrete Finishers |
3 | 11 | 2 | 47-2053.00 | Terrazzo Workers and Finishers |
3 | 9 | 2 | 47-2061.00 | Construction Laborers
|
3 | 6 | 2 | 47-2042.00 | Floor Layers, Except Carpet, Wood, and Hard Tiles
|
3 | 6 | 2 | 47-2142.00 | Paperhangers |
3 | 3 | 2 | 47-2141.00 | Painters, Construction and Maintenance |
2 | 9 | 2 | 47-2044.00 | Tile and Stone Setters
|
2 | 6 | 2 | 47-3016.00 | Helpers--Roofers |
2 | 5 | 2 | 51-9124.00 | Coating, Painting, and Spraying Machine Setters, Operators, and Tenders |
2 | 3 | 2 | 47-2021.00 | Brickmasons and Blockmasons |
2 | 3 | 1 | 47-2161.00 | Plasterers and Stucco Masons |
2 | 3 | 2 | 47-2041.00 | Carpet Installers |
2 | 2 | 2 | 47-2131.00 | Insulation Workers, Floor, Ceiling, and Wall |
2 | 2 | 2 | 47-2132.00 | Insulation Workers, Mechanical |
2 | 2 | 2 | 47-2081.00 | Drywall and Ceiling Tile Installers |
1 | 8 | 2 | 47-3015.00 | Helpers--Pipelayers, Plumbers, Pipefitters, and Steamfitters |
1 | 7 | 1 | 47-4071.00 | Septic Tank Servicers and Sewer Pipe Cleaners
|
1 | 5 | 1 | 47-3014.00 | Helpers--Painters, Paperhangers, Plasterers, and Stucco Masons |
1 | 4 | 2 | 47-2082.00 | Tapers |
1 | 3 | 2 | 47-2031.00 | Carpenters |
1 | 2 | 2 | 47-2121.00 | Glaziers |
- Wet surface to prepare for bonding, fill holes and cracks with grout or slurry, and smooth, using trowel.
- Clean chipped area, using wire brush, and feel and observe surface to determine if it is rough or uneven.
- Apply muriatic acid to clean surface, and rinse with water.
- Spread, level, and smooth concrete, using rake, shovel, hand or power trowel, hand or power screed, and float.
- Mold expansion joints and edges, using edging tools, jointers, and straightedge.
- Signal truck driver to position truck to facilitate pouring concrete, and move chute to direct concrete on forms.
- Produce rough concrete surface, using broom.
- Apply hardening and sealing compounds to cure surface of concrete, and waterproof or restore surface.
- Operate power vibrator to compact concrete.
- Install anchor bolts, steel plates, door sills and other fixtures in freshly poured concrete or pattern or stamp the surface to provide a decorative finish.
- Wet concrete surface, and rub with stone to smooth surface and obtain specified finish.
- Spread roofing paper on surface of foundation, and spread concrete onto roofing paper with trowel to form terrazzo base.
- Check the forms that hold the concrete to see that they are properly constructed.
- Set the forms that hold concrete to the desired pitch and depth, and align them.
- Monitor how the wind, heat, or cold affect the curing of the concrete throughout the entire process.
- Direct the casting of the concrete and supervise laborers who use shovels or special tools to spread it.
- Waterproof or restore concrete surfaces, using appropriate compounds.
- Mix cement, sand, and water to produce concrete, grout, or slurry, using hoe, trowel, tamper, scraper, or concrete-mixing machine.
- Chip, scrape, and grind high spots, ridges, and rough projections to finish concrete, using pneumatic chisels, power grinders, or hand tools.
- Cut out damaged areas, drill holes for reinforcing rods, and position reinforcing rods to repair concrete, using power saw and drill.
- Build wooden molds, and clamp molds around area to be repaired, using hand tools.
- Sprinkle colored marble or stone chips, powdered steel, or coloring powder over surface to produce prescribed finish.
- Fabricate concrete beams, columns, and panels.
- Polish surface, using polishing or surfacing machine.
- Cut metal division strips, and press them into terrazzo base so that top edges form desired design or pattern.
- Push roller over surface to embed chips in surface.
- Wet surface to prepare for bonding, fill holes and cracks with grout or slurry, and smooth, using trowel.
- Clean chipped area, using wire brush, and feel and observe surface to determine if it is rough or uneven.
- Apply muriatic acid to clean surface, and rinse with water.
- Spread, level, and smooth concrete, using rake, shovel, hand or power trowel, hand or power screed, and float.
- Mold expansion joints and edges, using edging tools, jointers, and straightedge.
- Signal truck driver to position truck to facilitate pouring concrete, and move chute to direct concrete on forms.
- Produce rough concrete surface, using broom.
- Apply hardening and sealing compounds to cure surface of concrete, and waterproof or restore surface.
- Operate power vibrator to compact concrete.
- Install anchor bolts, steel plates, door sills and other fixtures in freshly poured concrete or pattern or stamp the surface to provide a decorative finish.
- Wet concrete surface, and rub with stone to smooth surface and obtain specified finish.
- Spread roofing paper on surface of foundation, and spread concrete onto roofing paper with trowel to form terrazzo base.
- Wash polished terrazzo surface, using cleaner and water, and apply sealer and curing agent according to manufacturer's specifications, using brush or sprayer.
- Wet surface to prepare for bonding, fill holes and cracks with grout or slurry, and smooth with a trowel.
- Clean chipped area, using wire brush, and feel and observe surface to determine if it is rough or uneven.
- Spread, level, or smooth concrete or terrazzo mixtures to form bases or finished surfaces, using rakes, shovels, hand or power trowels, hand or power screeds, or floats.
- Clean installation site, mixing and storage areas, tools, machines, and equipment, and store materials and equipment.
- Mold expansion joints and edges, using edging tools, jointers, or straightedges.
- Precast terrazzo blocks in wooden forms.
- Wet concrete surface and rub with stone to smooth surface and obtain specified finish.
- Spread roofing paper on surface of foundation and spread concrete onto roofing paper with trowel to form terrazzo base.
- Produce rough concrete surface, using broom.
- Signal truck driver to position truck to facilitate pouring concrete and move chute to direct concrete on forms.
- Measure designated amounts of ingredients for terrazzo or grout, according to standard formulas and specifications, using graduated containers and scales, and load ingredients into portable mixer.
- Grind surfaces with a power grinder, or polish surfaces with polishing or surfacing machines.
- Cut metal division strips and press them into the terrazzo base for joints or changes of color to form designs or patterns or to help prevent cracks.
- Blend marble chip mixtures, place into panels, and push a roller over the surface to embed the chips.
- Modify mixing, grouting, grinding, or cleaning procedures, according to type of installation or material used.
- Grind curved surfaces or areas inaccessible to surfacing machine, such as stairways or cabinet tops, with portable hand grinder.
- Position and secure moisture membrane and wire mesh in preparation for pouring base materials for terrazzo installation.
- Fill slight grinding depressions with matching grout material and hand-trowel for a smooth, uniform surface.
- Sprinkle colored marble or stone chips, powdered steel, or coloring powder over surface to produce prescribed finish.
- Mix cement, sand, and water to produce concrete, grout, or slurry, using hoe, trowel, tamper, scraper, or concrete-mixing machine.
- Chip, scrape, or grind high spots, ridges, or rough projections to finish concrete, using pneumatic chisel, hand chisel, or other hand tools.
- Move terrazzo installation materials, tools, machines, or work devices to work areas, manually or using wheelbarrow.
- Repair concrete by cutting out damaged areas, drilling holes for reinforcing rods, and positioning reinforcing rods, using power saw and drill.
- Build wooden molds, clamping molds around areas to be repaired, or setting up frames to the proper depth and alignment.
- Remove frames when the foundation is dry.
- Wash polished terrazzo surface, using cleaner and water, and apply sealer and curing agent according to manufacturer's specifications, using brush or sprayer.
- Wet surface to prepare for bonding, fill holes and cracks with grout or slurry, and smooth with a trowel.
- Clean chipped area, using wire brush, and feel and observe surface to determine if it is rough or uneven.
- Spread, level, or smooth concrete or terrazzo mixtures to form bases or finished surfaces, using rakes, shovels, hand or power trowels, hand or power screeds, or floats.
- Clean installation site, mixing and storage areas, tools, machines, and equipment, and store materials and equipment.
- Mold expansion joints and edges, using edging tools, jointers, or straightedges.
- Precast terrazzo blocks in wooden forms.
- Wet concrete surface and rub with stone to smooth surface and obtain specified finish.
- Spread roofing paper on surface of foundation and spread concrete onto roofing paper with trowel to form terrazzo base.
- Produce rough concrete surface, using broom.
- Signal truck driver to position truck to facilitate pouring concrete and move chute to direct concrete on forms.
- Spray materials, such as water, sand, steam, vinyl, paint, or stucco, through hoses to clean, coat, or seal surfaces.
- Raze buildings or salvage useful materials.
- Mop, brush, or spread paints, cleaning solutions, or other compounds over surfaces to clean them or to provide protection.
- Lubricate, clean, or repair machinery, equipment, or tools.
- Clean or prepare construction sites to eliminate possible hazards.
- Dig ditches or trenches, backfill excavations, or compact and level earth to grade specifications, using picks, shovels, pneumatic tampers, or rakes.
- Smooth or finish freshly poured cement or concrete, using floats, trowels, screeds, or powered cement finishing tools.
- Provide assistance to craft workers, such as carpenters, plasterers, or masons.
- Mix, pour, or spread concrete, using portable cement mixers.
- Tend pumps, compressors, or generators to provide power for tools, machinery, or equipment or to heat or move materials, such as asphalt.
- Signal equipment operators to facilitate alignment, movement, or adjustment of machinery, equipment, or materials.
- Read plans, instructions, or specifications to determine work activities.
- Measure, mark, or record openings or distances to layout areas where construction work will be performed.
- Load, unload, or identify building materials, machinery, or tools, distributing them to the appropriate locations, according to project plans or specifications.
- Position, join, align, or seal structural components, such as concrete wall sections or pipes.
- Perform site activities required of green certified construction practices, such as implementing waste management procedures, identifying materials for reuse, or installing erosion or sedimentation control mechanisms.
- Control traffic passing near, in, or around work zones.
- Install sewer, water, or storm drain pipes, using pipe-laying machinery or laser guidance equipment.
- Operate or maintain air monitoring or other sampling devices in confined or hazardous environments.
- Erect or dismantle scaffolding, shoring, braces, traffic barricades, ramps, or other temporary structures.
- Perform building weatherization tasks, such as repairing windows, adding insulation, or applying weather-stripping materials.
- Apply weather-stripping to reduce energy loss.
- Position or dismantle forms for pouring concrete, using saws, hammers, nails, or bolts.
- Grind, scrape, sand, or polish surfaces, such as concrete, marble, terrazzo, or wood flooring, using abrasive tools or machines.
- Place, consolidate, or protect case-in-place concrete or masonry structures.
- Mix ingredients to create compounds for covering or cleaning surfaces.
- Operate jackhammers or drills to break up concrete or pavement.
- Apply caulking compounds by hand or caulking guns to protect against entry of water or air.
- Tend machines that pump concrete, grout, cement, sand, plaster, or stucco through spray guns for application to ceilings or walls.
- Identify, pack, or transport hazardous or radioactive materials.
- Use computers or other input devices to control robotic pipe cutters or cleaners.
- Perform construction laborer duties at green building sites, such as renewable energy plants or wind turbine installations.
- Spray materials, such as water, sand, steam, vinyl, paint, or stucco, through hoses to clean, coat, or seal surfaces.
- Raze buildings or salvage useful materials.
- Mop, brush, or spread paints, cleaning solutions, or other compounds over surfaces to clean them or to provide protection.
- Lubricate, clean, or repair machinery, equipment, or tools.
- Clean or prepare construction sites to eliminate possible hazards.
- Dig ditches or trenches, backfill excavations, or compact and level earth to grade specifications, using picks, shovels, pneumatic tampers, or rakes.
- Smooth or finish freshly poured cement or concrete, using floats, trowels, screeds, or powered cement finishing tools.
- Provide assistance to craft workers, such as carpenters, plasterers, or masons.
- Mix, pour, or spread concrete, using portable cement mixers.
- Sweep, scrape, sand, or chip dirt and irregularities to clean base surfaces, correcting imperfections that may show through the covering.
- Form a smooth foundation by stapling plywood or Masonite over the floor or by brushing waterproof compound onto surface and filling cracks with plaster, putty, or grout to seal pores.
- Disconnect and remove appliances, light fixtures, and worn floor and wall covering from floors, walls, and cabinets.
- Roll and press sheet wall and floor covering into cement base to smooth and finish surface, using hand roller.
- Apply adhesive cement to floor or wall material to join and adhere foundation material.
- Remove excess cement to clean finished surface.
- Cut flooring material to fit around obstructions.
- Inspect surface to be covered to ensure that it is firm and dry.
- Trim excess covering materials, tack edges, and join sections of covering material to form tight joint.
- Measure and mark guidelines on surfaces or foundations, using chalk lines and dividers.
- Cut covering and foundation materials, according to blueprints and sketches.
- Determine traffic areas and decide location of seams.
- Lay out, position, and apply shock-absorbing, sound-deadening, or decorative coverings to floors, walls, and cabinets, following guidelines to keep courses straight and create designs.
- Heat and soften floor covering materials to patch cracks or fit floor coverings around irregular surfaces, using blowtorch.
- Sweep, scrape, sand, or chip dirt and irregularities to clean base surfaces, correcting imperfections that may show through the covering.
- Form a smooth foundation by stapling plywood or Masonite over the floor or by brushing waterproof compound onto surface and filling cracks with plaster, putty, or grout to seal pores.
- Disconnect and remove appliances, light fixtures, and worn floor and wall covering from floors, walls, and cabinets.
- Roll and press sheet wall and floor covering into cement base to smooth and finish surface, using hand roller.
- Apply adhesive cement to floor or wall material to join and adhere foundation material.
- Remove excess cement to clean finished surface.
- Apply sizing to seal surfaces and maximize adhesion of coverings to surfaces.
- Remove old paper, using water, steam machines, or solvents and scrapers.
- Remove paint, varnish, dirt, and grease from surfaces, using paint remover and water soda solutions.
- Apply adhesives to the backs of paper strips, using brushes, or dunk strips of prepasted wallcovering in water, wiping off any excess adhesive.
- Apply thinned glue to waterproof porous surfaces, using brushes, rollers, or pasting machines.
- Mix paste, using paste powder and water, and brush paste onto surfaces.
- Smooth strips or sections of paper with brushes or rollers to remove wrinkles and bubbles and to smooth joints.
- Trim rough edges from strips, using straightedges and trimming knives.
- Trim excess material at ceilings or baseboards, using knives.
- Check finished wallcoverings for proper alignment, pattern matching, and neatness of seams.
- Mark vertical guidelines on walls to align strips, using plumb bobs and chalk lines.
- Cover interior walls and ceilings of rooms with decorative wallpaper or fabric, using hand tools.
- Measure and cut strips from rolls of wallpaper or fabric, using shears or razors.
- Place strips or sections of paper on surfaces, aligning section edges and patterns.
- Fill holes, cracks, and other surface imperfections preparatory to covering surfaces.
- Measure surfaces or review work orders to estimate the quantities of materials needed.
- Smooth rough spots on walls and ceilings, using sandpaper.
- Set up equipment, such as pasteboards and scaffolds.
- Staple or tack advertising posters onto fences, walls, billboards, or poles.
- Apply acetic acid to damp plaster to prevent lime from bleeding through paper.
- Apply sizing to seal surfaces and maximize adhesion of coverings to surfaces.
- Remove old paper, using water, steam machines, or solvents and scrapers.
- Remove paint, varnish, dirt, and grease from surfaces, using paint remover and water soda solutions.
- Apply adhesives to the backs of paper strips, using brushes, or dunk strips of prepasted wallcovering in water, wiping off any excess adhesive.
- Apply thinned glue to waterproof porous surfaces, using brushes, rollers, or pasting machines.
- Mix paste, using paste powder and water, and brush paste onto surfaces.
- Apply primers or sealers to prepare new surfaces, such as bare wood or metal, for finish coats.
- Wash and treat surfaces with oil, turpentine, mildew remover, or other preparations, and sand rough spots to ensure that finishes will adhere properly.
- Remove old finishes by stripping, sanding, wire brushing, burning, or using water or abrasive blasting.
- Fill cracks, holes, or joints with caulk, putty, plaster, or other fillers, using caulking guns or putty knives.
- Cover surfaces with dropcloths or masking tape and paper to protect surfaces during painting.
- Smooth surfaces, using sandpaper, scrapers, brushes, steel wool, or sanding machines.
- Read work orders or receive instructions from supervisors or homeowners to determine work requirements.
- Apply paint, stain, varnish, enamel, or other finishes to equipment, buildings, bridges, or other structures, using brushes, spray guns, or rollers.
- Erect scaffolding or swing gates, or set up ladders, to work above ground level.
- Mix and match colors of paint, stain, or varnish with oil or thinning and drying additives to obtain desired colors and consistencies.
- Calculate amounts of required materials and estimate costs, based on surface measurements or work orders.
- Polish final coats to specified finishes.
- Select and purchase tools or finishes for surfaces to be covered, considering durability, ease of handling, methods of application, and customers' wishes.
- Remove fixtures such as pictures, door knobs, lamps, or electric switch covers prior to painting.
- Use special finishing techniques such as sponging, ragging, layering, or faux finishing.
- Cut stencils and brush or spray lettering or decorations on surfaces.
- Waterproof buildings, using waterproofers or caulking.
- Spray or brush hot plastics or pitch onto surfaces.
- Bake finishes on painted or enameled articles, using baking ovens.
- Apply primers or sealers to prepare new surfaces, such as bare wood or metal, for finish coats.
- Wash and treat surfaces with oil, turpentine, mildew remover, or other preparations, and sand rough spots to ensure that finishes will adhere properly.
- Remove old finishes by stripping, sanding, wire brushing, burning, or using water or abrasive blasting.
- Remove and replace cracked or damaged tile.
- Remove any old tile, grout and adhesive using chisels and scrapers and clean the surface carefully.
- Finish and dress the joints and wipe excess grout from between tiles, using damp sponge.
- Mix, apply, and spread plaster, concrete, mortar, cement, mastic, glue or other adhesives to form a bed for the tiles, using brush, trowel and screed.
- Apply mortar to tile back, position the tile, and press or tap with trowel handle to affix tile to base.
- Level concrete and allow to dry.
- Prepare surfaces for tiling by attaching lath or waterproof paper, or by applying a cement mortar coat to a metal screen.
- Spread mastic or other adhesive base on roof deck to form base for promenade tile, using serrated spreader.
- Brush glue onto manila paper on which design has been drawn and position tiles, finished side down, onto paper.
- Align and straighten tile using levels, squares, and straightedges.
- Cut and shape tile to fit around obstacles and into odd spaces and corners, using hand and power cutting tools.
- Determine and implement the best layout to achieve a desired pattern.
- Study blueprints and examine surface to be covered to determine amount of material needed.
- Measure and mark surfaces to be tiled, following blueprints.
- Lay and set mosaic tiles to create decorative wall, mural, and floor designs.
- Mix and apply mortar or cement to edges and ends of drain tiles to seal halves and joints.
- Apply a sealer to make grout stain- and water-resistant.
- Measure and cut metal lath to size for walls and ceilings, using tin snips.
- Install and anchor fixtures in designated positions, using hand tools.
- Cut tile backing to required size, using shears.
- Cut, surface, polish, and install marble and granite or install pre-cast terrazzo, granite or marble units.
- Assist customers in selection of tile and grout.
- Prepare cost and labor estimates, based on calculations of time and materials needed for project.
- Select and order tile and other items to be installed, such as bathroom accessories, walls, panels, and cabinets, according to specifications.
- Build underbeds and install anchor bolts, wires, and brackets.
- Remove and replace cracked or damaged tile.
- Remove any old tile, grout and adhesive using chisels and scrapers and clean the surface carefully.
- Finish and dress the joints and wipe excess grout from between tiles, using damp sponge.
- Mix, apply, and spread plaster, concrete, mortar, cement, mastic, glue or other adhesives to form a bed for the tiles, using brush, trowel and screed.
- Apply mortar to tile back, position the tile, and press or tap with trowel handle to affix tile to base.
- Level concrete and allow to dry.
- Prepare surfaces for tiling by attaching lath or waterproof paper, or by applying a cement mortar coat to a metal screen.
- Spread mastic or other adhesive base on roof deck to form base for promenade tile, using serrated spreader.
- Brush glue onto manila paper on which design has been drawn and position tiles, finished side down, onto paper.
- Sweep and clean roofs to prepare them for the application of new roofing materials.
- Remove old roofing materials.
- Clean work areas and equipment.
- Provide assistance to skilled roofers installing and repairing roofs, flashings, and surfaces.
- Apply shingles, gravel, or asphalt over the top layer of tar to protect the roofing material.
- Clear drains and downspouts and clean gutters.
- Check to ensure that completed roofs are watertight.
- Locate worn or torn areas in roofs.
- Maintain tools and equipment.
- Cover roofs with layers of roofing felt or asphalt strips before installing tile, slate, or composition materials.
- Unload materials and tools from work trucks, and unroll roofing as directed.
- Set ladders, scaffolds, and hoists in place for taking supplies to roofs.
- Place tiles, nail them to roof boards, and cover nailheads with roofing cement.
- Attach roofing paper and composition shingles, using nails.
- Perform emergency leak repairs and general maintenance for a variety of roof types.
- Attach sheets of metal to roof boards or building frameworks when installing metal roofs.
- Hoist tar and roofing materials to roofs, using ropes and pulleys, or carry materials up ladders.
- Chop tar into small pieces, and heat chopped tar in kettles.
- Sweep and clean roofs to prepare them for the application of new roofing materials.
- Remove old roofing materials.
- Clean work areas and equipment.
- Provide assistance to skilled roofers installing and repairing roofs, flashings, and surfaces.
- Apply shingles, gravel, or asphalt over the top layer of tar to protect the roofing material.
- Clear drains and downspouts and clean gutters.
- Remove grease, dirt, paint, or rust from surfaces in preparation for paint application, using abrasives, solvents, brushes, blowtorches, washing tanks, or sandblasters.
- Sand and apply sealer to properly dried finish.
- Dispose of hazardous waste in an appropriate manner.
- Disassemble, clean, and reassemble sprayers or power equipment, using solvents, wire brushes, and cloths.
- Clean equipment and work areas.
- Hold or position spray guns to direct spray onto articles.
- Spray prepared surfaces with specified amounts of primers and decorative or finish coatings.
- Monitor painting operations to identify flaws, such as blisters or streaks, and correct their causes.
- Fill hoppers, reservoirs, troughs, or pans with material used to coat, paint, or spray, using conveyors or pails.
- Apply rust-resistant undercoats and caulk and seal seams.
- Start and stop operation of machines, using levers or buttons.
- Determine paint flow, viscosity, and coating quality by performing visual inspections, or by using viscometers.
- Attach hoses or nozzles to machines, using wrenches and pliers, and make adjustments to obtain the proper dispersion of spray.
- Turn dials, handwheels, valves, or switches to regulate conveyor speeds, machine temperature, air pressure and circulation, and the flow or spray of coatings or paints.
- Observe machine gauges and equipment operation to detect defects or deviations from standards, and make adjustments as necessary.
- Examine, measure, weigh, or test sample products to ensure conformance to specifications.
- Buff and wax the finished paintwork.
- Use brush to hand-paint areas in need of retouching or unreachable with a spray gun.
- Thread or feed items or products through or around machine rollers and dryers.
- Weigh or measure chemicals, coatings, or paints before adding them to machines.
- Operate auxiliary machines or equipment used in coating or painting processes.
- Remove materials, parts, or workpieces from painting or coating machines, using hand tools.
- Record operational data on specified forms.
- Operate lifting or moving devices to move equipment or materials to access areas to be painted.
- Prepare and apply stencils, computer-generated decals, or other decorative items to finished products.
- Set up portable equipment, such as ventilators, exhaust units, ladders, or scaffolding.
- Adjust controls on infrared ovens, heat lamps, portable ventilators, or exhaust units to speed the drying of surfaces between coats.
- Apply primer over any repairs made to surfaces.
- Fill small dents or scratches with body fillers and smooth surfaces to prepare for painting.
- Mix paints to match color specifications or original colors, stirring or thinning paints, using spatulas or power mixing equipment.
- Remove grease, dirt, paint, or rust from surfaces in preparation for paint application, using abrasives, solvents, brushes, blowtorches, washing tanks, or sandblasters.
- Sand and apply sealer to properly dried finish.
- Dispose of hazardous waste in an appropriate manner.
- Disassemble, clean, and reassemble sprayers or power equipment, using solvents, wire brushes, and cloths.
- Clean equipment and work areas.
- Clean working surface to remove scale, dust, soot, or chips of brick and mortar, using broom, wire brush, or scraper.
- Remove burned or damaged brick or mortar, using sledgehammer, crowbar, chipping gun, or chisel.
- Remove excess mortar with trowels and hand tools, and finish mortar joints with jointing tools, for a sealed, uniform appearance.
- Measure distance from reference points and mark guidelines to lay out work, using plumb bobs and levels.
- Construct corners by fastening in plumb position a corner pole or building a corner pyramid of bricks, and filling in between the corners using a line from corner to corner to guide each course, or layer, of brick.
- Apply and smooth mortar or other mixture over work surface.
- Calculate angles and courses and determine vertical and horizontal alignment of courses.
- Break or cut bricks, tiles, or blocks to size, using trowel edge, hammer, or power saw.
- Interpret blueprints and drawings to determine specifications and to calculate the materials required.
- Fasten or fuse brick or other building material to structure with wire clamps, anchor holes, torch, or cement.
- Examine brickwork or structure to determine need for repair.
- Mix specified amounts of sand, clay, dirt, or mortar powder with water to form refractory mixtures.
- Lay and align bricks, blocks, or tiles to build or repair structures or high temperature equipment, such as cupola, kilns, ovens, or furnaces.
- Spray or spread refractory material over brickwork to protect against deterioration.
- Clean working surface to remove scale, dust, soot, or chips of brick and mortar, using broom, wire brush, or scraper.
- Remove burned or damaged brick or mortar, using sledgehammer, crowbar, chipping gun, or chisel.
- Remove excess mortar with trowels and hand tools, and finish mortar joints with jointing tools, for a sealed, uniform appearance.
- Clean and prepare surfaces for applications of plaster, cement, stucco, or similar materials, such as by drywall taping.
- Rough the undercoat surface with a scratcher so the finish coat will adhere.
- Cover surfaces such as windows, doors, or sidewalks to protect from splashing.
- Mix mortar and plaster to desired consistency or direct workers who perform mixing.
- Apply coats of plaster or stucco to walls, ceilings, or partitions of buildings, using trowels, brushes, or spray guns.
- Set up scaffolds.
- Determine materials needed to complete the job and place orders accordingly.
- Apply weatherproof, decorative coverings to exterior surfaces of buildings, such as by troweling or spraying on coats of stucco.
- Create decorative textures in finish coat, using brushes or trowels, sand, pebbles, or stones.
- Apply insulation to building exteriors by installing prefabricated insulation systems over existing walls or by covering the outer wall with insulation board, reinforcing mesh, and a base coat.
- Cure freshly plastered surfaces.
- Install guide wires on exterior surfaces of buildings to indicate thickness of plaster or stucco and nail wire mesh, lath, or similar materials to the outside surface to hold stucco in place.
- Spray acoustic materials or texture finish over walls or ceilings.
- Mold or install ornamental plaster pieces, panels, or trim.
- Clean and prepare surfaces for applications of plaster, cement, stucco, or similar materials, such as by drywall taping.
- Rough the undercoat surface with a scratcher so the finish coat will adhere.
- Clean job sites.
- Inspect the surface to be covered to determine its condition, and correct any imperfections that might show through carpet or cause carpet to wear unevenly.
- Move furniture from area to be carpeted and remove old carpet and padding.
- Clean up before and after installation, including vacuuming carpet and discarding remnant pieces.
- Roll out, measure, mark, and cut carpeting to size with a carpet knife, following floor sketches and allowing extra carpet for final fitting.
- Join edges of carpet and seam edges where necessary, by sewing or by using tape with glue and heated carpet iron.
- Cut and trim carpet to fit along wall edges, openings, and projections, finishing the edges with a wall trimmer.
- Plan the layout of the carpet, allowing for expected traffic patterns and placing seams for best appearance and longest wear.
- Stretch carpet to align with walls and ensure a smooth surface, and press carpet in place over tack strips or use staples, tape, tacks or glue to hold carpet in place.
- Take measurements and study floor sketches to calculate the area to be carpeted and the amount of material needed.
- Install carpet on some floors using adhesive, following prescribed method.
- Measure, cut and install tackless strips along the baseboard or wall.
- Nail tack strips around area to be carpeted or use old strips to attach edges of new carpet.
- Cut carpet padding to size and install padding, following prescribed method.
- Fasten metal treads across door openings or where carpet meets flooring to hold carpet in place.
- Draw building diagrams and record dimensions.
- Cut and bind material.
- Inspect the surface to be covered to determine its condition, and correct any imperfections that might show through carpet or cause carpet to wear unevenly.
- Move furniture from area to be carpeted and remove old carpet and padding.
- Clean up before and after installation, including vacuuming carpet and discarding remnant pieces.
- Remove old insulation, such as asbestos, following safety procedures.
- Prepare surfaces for insulation application by brushing or spreading on adhesives, cement, or asphalt, or by attaching metal pins to surfaces.
- Measure and cut insulation for covering surfaces, using tape measures, handsaws, power saws, knives, or scissors.
- Fit, wrap, staple, or glue insulating materials to structures or surfaces, using hand tools or wires.
- Cover and line structures with blown or rolled forms of materials to insulate against cold, heat, or moisture, using saws, knives, rasps, trowels, blowers, or other tools and implements.
- Distribute insulating materials evenly into small spaces within floors, ceilings, or walls, using blowers and hose attachments, or cement mortars.
- Move controls, buttons, or levers to start blowers and regulate flow of materials through nozzles.
- Fill blower hoppers with insulating materials.
- Cover, seal, or finish insulated surfaces or access holes with plastic covers, canvas strips, sealants, tape, cement or asphalt mastic.
- Read blueprints, and select appropriate insulation, based on space characteristics and the heat retaining or excluding characteristics of the material.
- Remove old insulation, such as asbestos, following safety procedures.
- Prepare surfaces for insulation application by brushing or spreading on adhesives, cement, or asphalt, or by attaching metal pins to surfaces.
- Prepare surfaces for insulation application by brushing or spreading on adhesives, cement, or asphalt, or by attaching metal pins to surfaces.
- Remove or seal off old asbestos insulation, following safety procedures.
- Measure and cut insulation for covering surfaces, using tape measures, handsaws, knives, and scissors.
- Apply, remove, and repair insulation on industrial equipment, pipes, ductwork, or other mechanical systems such as heat exchangers, tanks, and vessels, to help control noise and maintain temperatures.
- Select appropriate insulation, such as fiberglass, Styrofoam, or cork, based on the heat retaining or excluding characteristics of the material.
- Fit insulation around obstructions, and shape insulating materials and protective coverings as required.
- Determine the amounts and types of insulation needed, and methods of installation, based on factors such as location, surface shape, and equipment use.
- Cover, seal, or finish insulated surfaces or access holes with plastic covers, canvas strips, sealants, tape, cement, or asphalt mastic.
- Install sheet metal around insulated pipes with screws to protect the insulation from weather conditions or physical damage.
- Read blueprints and specifications to determine job requirements.
- Distribute insulating materials evenly into small spaces within floors, ceilings, or walls, using blowers and hose attachments or cement mortar.
- Fill blower hoppers with insulating materials.
- Move controls, buttons, or levers to start blowers, and to regulate flow of materials through nozzles.
- Prepare surfaces for insulation application by brushing or spreading on adhesives, cement, or asphalt, or by attaching metal pins to surfaces.
- Remove or seal off old asbestos insulation, following safety procedures.
- Remove existing plaster, drywall, or paneling, using crowbars and hammers.
- Wash concrete surfaces before mounting tile to increase adhesive qualities of surfaces, using washing soda and zinc sulfate solution.
- Read blueprints or other specifications to determine methods of installation, work procedures, or material or tool requirements.
- Measure and mark surfaces to lay out work, according to blueprints or drawings, using tape measures, straightedges or squares, and marking devices.
- Fit and fasten wallboard or drywall into position on wood or metal frameworks, using glue, nails, or screws.
- Measure and cut openings in panels or tiles for electrical outlets, windows, vents, plumbing, or other fixtures, using keyhole saws or other cutting tools.
- Assemble or install metal framing or decorative trim for windows, doorways, or vents.
- Cut metal or wood framing and trim to size, using cutting tools.
- Inspect furrings, mechanical mountings, or masonry surfaces for plumbness and level, using spirit or water levels.
- Cut fixture or border tiles to size, using keyhole saws, and insert them into surrounding frameworks.
- Cut and screw together metal channels to make floor or ceiling frames, according to plans for the location of rooms or hallways.
- Hang drywall panels on metal frameworks of walls and ceilings in offices, schools, or other large buildings, using lifts or hoists to adjust panel heights, when necessary.
- Trim rough edges from wallboard to maintain even joints, using knives.
- Suspend angle iron grids or channel irons from ceilings, using wire.
- Coordinate work with drywall finishers who cover the seams between drywall panels.
- Install horizontal and vertical metal or wooden studs to frames so that wallboard can be attached to interior walls.
- Scribe and cut edges of tile to fit walls where wall molding is not specified.
- Hang dry lines to wall moldings to guide positioning of main runners.
- Fasten metal or rockboard lath to the structural framework of walls, ceilings, or partitions of buildings, using nails, screws, staples, or wire-ties.
- Install blanket insulation between studs and tack plastic moisture barriers over insulation.
- Seal joints between ceiling tiles and walls.
- Apply or mount acoustical tile or blocks, strips, or sheets of shock-absorbing materials to ceilings or walls of buildings to reduce reflection of sound or to decorate rooms.
- Mount tile, using adhesives, or by nailing, screwing, stapling, or wire-tying lath directly to structural frameworks.
- Nail channels or wood furring strips to surfaces to provide mounting for tile.
- Install metal lath where plaster applications will be exposed to weather or water, or for curved or irregular surfaces.
- Apply cement to backs of tiles and press tiles into place, aligning them with layout marks or joints of previously laid tile.
- Remove existing plaster, drywall, or paneling, using crowbars and hammers.
- Wash concrete surfaces before mounting tile to increase adhesive qualities of surfaces, using washing soda and zinc sulfate solution.
- Disassemble and remove damaged or worn pipe.
- Assist pipe fitters in the layout, assembly, and installation of piping for air, ammonia, gas, and water systems.
- Fit or assist in fitting valves, couplings, or assemblies to tanks, pumps, or systems, using hand tools.
- Excavate and grade ditches, and lay and join pipe for water and sewer service.
- Clean shop, work area, and machines, using solvent and rags.
- Fill pipes with sand or resin to prevent distortion, and hold pipes during bending and installation.
- Immerse pipe in chemical solution to remove dirt, oil, and scale.
- Clean and renew steam traps.
- Measure, cut, thread and assemble new pipe, placing the assembled pipe in hangers or other supports.
- Cut or drill holes in walls or floors to accommodate the passage of pipes.
- Perform rough-ins, repair and replace fixtures and water heaters, and locate, repair, or remove leaking or broken pipes.
- Cut pipe and lift up to fitters.
- Requisition tools and equipment, select type and size of pipe, and collect and transport materials and equipment to work site.
- Mount brackets and hangers on walls and ceilings to hold pipes, and set sleeves or inserts to provide support for pipes.
- Install gas burners to convert furnaces from wood, coal, or oil.
- Disassemble and remove damaged or worn pipe.
- Assist pipe fitters in the layout, assembly, and installation of piping for air, ammonia, gas, and water systems.
- Fit or assist in fitting valves, couplings, or assemblies to tanks, pumps, or systems, using hand tools.
- Excavate and grade ditches, and lay and join pipe for water and sewer service.
- Clean shop, work area, and machines, using solvent and rags.
- Fill pipes with sand or resin to prevent distortion, and hold pipes during bending and installation.
- Immerse pipe in chemical solution to remove dirt, oil, and scale.
- Clean and renew steam traps.
- Cut damaged sections of pipe with cutters, remove broken sections from ditches, and replace pipe sections, using pipe sleeves.
- Operate sewer cleaning equipment, including power rodders, high-velocity water jets, sewer flushers, bucket machines, wayne balls, and vac-alls.
- Clean and repair septic tanks, sewer lines, or related structures such as manholes, culverts, and catch basins.
- Dig out sewer lines manually, using shovels.
- Clean and disinfect domestic basements and other areas flooded by sewer stoppages.
- Start machines to feed revolving cables or rods into openings, stopping machines and changing knives to conform to pipe sizes.
- Cover repaired pipes with dirt, and pack backfilled excavations, using air and gasoline tampers.
- Communicate with supervisors and other workers, using equipment such as wireless phones, pagers, or radio telephones.
- Drive trucks to transport crews, materials, and equipment.
- Inspect manholes to locate sewer line stoppages.
- Prepare and keep records of actions taken, including maintenance and repair work.
- Measure excavation sites, using plumbers' snakes, tapelines, or lengths of cutting heads within sewers, and mark areas for digging.
- Service, adjust, and make minor repairs to equipment, machines, and attachments.
- Locate problems, using specially designed equipment, and mark where digging must occur to reach damaged tanks or pipes.
- Withdraw cables from pipes and examine them for evidence of mud, roots, grease, and other deposits indicating broken or clogged sewer lines.
- Ensure that repaired sewer line joints are tightly sealed before backfilling begins.
- Rotate cleaning rods manually, using turning pins.
- Install rotary knives on flexible cables mounted on machine reels, according to the diameters of pipes to be cleaned.
- Update sewer maps and manhole charts.
- Requisition or order tools and equipment.
- Break asphalt and other pavement so that pipes can be accessed, using airhammers, picks, and shovels.
- Tap mainline sewers to install sewer saddles.
- Cut damaged sections of pipe with cutters, remove broken sections from ditches, and replace pipe sections, using pipe sleeves.
- Operate sewer cleaning equipment, including power rodders, high-velocity water jets, sewer flushers, bucket machines, wayne balls, and vac-alls.
- Clean and repair septic tanks, sewer lines, or related structures such as manholes, culverts, and catch basins.
- Dig out sewer lines manually, using shovels.
- Clean and disinfect domestic basements and other areas flooded by sewer stoppages.
- Start machines to feed revolving cables or rods into openings, stopping machines and changing knives to conform to pipe sizes.
- Cover repaired pipes with dirt, and pack backfilled excavations, using air and gasoline tampers.
- Place articles to be stripped into stripping tanks.
- Clean work areas and equipment.
- Perform support duties to assist painters, paperhangers, plasterers, or masons.
- Supply or hold tools and materials.
- Pour specified amounts of chemical solutions into stripping tanks.
- Apply protective coverings, such as masking tape, to articles or areas that could be damaged or stained by work processes.
- Erect scaffolding.
- Fill cracks or breaks in surfaces of plaster articles or areas with putty or epoxy compounds.
- Smooth surfaces of articles to be painted, using sanding and buffing tools and equipment.
- Mix plaster, and carry plaster to plasterers.
- Remove articles such as cabinets, metal furniture, and paint containers from stripping tanks after prescribed periods of time.
- Place articles to be stripped into stripping tanks.
- Clean work areas and equipment.
- Perform support duties to assist painters, paperhangers, plasterers, or masons.
- Supply or hold tools and materials.
- Pour specified amounts of chemical solutions into stripping tanks.
- Apply texturizing compounds or primers to walls or ceilings before final finishing, using trowels, brushes, rollers, or spray guns.
- Spread and smooth cementing material over tape, using trowels or floating machines to blend joints with wall surfaces.
- Remove extra compound after surfaces have been covered sufficiently.
- Use mechanical applicators that spread compounds and embed tape in one operation.
- Spread sealing compound between boards or panels or over cracks, holes, nail heads, or screw heads, using trowels, broadknives, or spatulas.
- Press paper tape over joints to embed tape into sealing compound and to seal joints.
- Apply additional coats to fill in holes and make surfaces smooth.
- Seal joints between plasterboard or other wallboard to prepare wall surfaces for painting or papering.
- Sand or patch nicks or cracks in plasterboard or wallboard.
- Mix sealing compounds by hand or with portable electric mixers.
- Work on high ceilings, using scaffolding or other tools, such as stilts.
- Select the correct sealing compound or tape.
- Countersink nails or screws below surfaces of walls before applying sealing compounds, using hammers or screwdrivers.
- Install metal molding at wall corners to secure wallboard.
- Check adhesives to ensure that they will work and will remain durable.
- Sand rough spots of dried cement between applications of compounds.
- Apply texturizing compounds or primers to walls or ceilings before final finishing, using trowels, brushes, rollers, or spray guns.
- Spread and smooth cementing material over tape, using trowels or floating machines to blend joints with wall surfaces.
- Remove extra compound after surfaces have been covered sufficiently.
- Use mechanical applicators that spread compounds and embed tape in one operation.
- Remove damaged or defective parts or sections of structures and repair or replace, using hand tools.
- Follow established safety rules and regulations and maintain a safe and clean environment.
- Dig or direct digging of post holes and set poles to support structures.
- Measure and mark cutting lines on materials, using a ruler, pencil, chalk, and marking gauge.
- Assemble and fasten materials to make frameworks or props, using hand tools and wood screws, nails, dowel pins, or glue.
- Study specifications in blueprints, sketches, or building plans to prepare project layout and determine dimensions and materials required.
- Shape or cut materials to specified measurements, using hand tools, machines, or power saws.
- Verify trueness of structure, using plumb bob and level.
- Inspect ceiling or floor tile, wall coverings, siding, glass, or woodwork to detect broken or damaged structures.
- Erect scaffolding or ladders for assembling structures above ground level.
- Install structures or fixtures, such as windows, frames, floorings, trim, or hardware, using carpenters' hand or power tools.
- Maintain records, document actions, and present written progress reports.
- Maintain job records and schedule work crew.
- Anchor and brace forms and other structures in place, using nails, bolts, anchor rods, steel cables, planks, wedges, and timbers.
- Bore boltholes in timber, masonry or concrete walls, using power drill.
- Install rough door and window frames, subflooring, fixtures, or temporary supports in structures undergoing construction or repair.
- Cover subfloors with building paper to keep out moisture and lay hardwood, parquet, or wood-strip-block floors by nailing floors to subfloor or cementing them to mastic or asphalt base.
- Construct forms or chutes for pouring concrete.
- Arrange for subcontractors to deal with special areas, such as heating or electrical wiring work.
- Build or repair cabinets, doors, frameworks, floors, or other wooden fixtures used in buildings, using woodworking machines, carpenter's hand tools, or power tools.
- Finish surfaces of woodwork or wallboard in houses or buildings, using paint, hand tools, or paneling.
- Select and order lumber or other required materials.
- Work with or remove hazardous material.
- Fill cracks or other defects in plaster or plasterboard and sand patch, using patching plaster, trowel, and sanding tool.
- Prepare cost estimates for clients or employers.
- Perform minor plumbing, welding, or concrete mixing work.
- Apply shock-absorbing, sound-deadening, or decorative paneling to ceilings or walls.
- Examine structural timbers and supports to detect decay, and replace timbers as required, using hand tools, nuts, and bolts.
- Build sleds from logs and timbers for use in hauling camp buildings and machinery through wooded areas.
- Remove damaged or defective parts or sections of structures and repair or replace, using hand tools.
- Follow established safety rules and regulations and maintain a safe and clean environment.
- Dig or direct digging of post holes and set poles to support structures.
- Cut and remove broken glass prior to installing replacement glass.
- Assemble and cement sections of stained glass together.
- Read and interpret blueprints or specifications to determine size, shape, color, type, or thickness of glass, location of framing, installation procedures, or staging or scaffolding materials required.
- Determine plumb of walls or ceilings, using plumb lines and levels.
- Install pre-assembled metal or wood frameworks for windows or doors to be fitted with glass panels, using hand tools.
- Fabricate or install metal sashes or moldings for glass installation, using aluminum or steel framing.
- Operate cranes or hoists with suction cups to lift large, heavy pieces of glass.
- Set glass doors into frames and bolt metal hinges, handles, locks, or other hardware to attach doors to frames and walls.
- Cut, fit, install, repair, or replace glass or glass substitutes, such as plastic or aluminum, in building interiors or exteriors or in furniture or other products.
- Drive trucks to installation sites and unload mirrors, glass equipment, or tools.
- Load and arrange glass or mirrors onto delivery trucks, using suction cups or cranes to lift glass.
- Measure mirrors and dimensions of areas to be covered to determine work procedures.
- Cut and attach mounting strips, metal or wood moldings, rubber gaskets, or metal clips to surfaces in preparation for mirror installation.
- Pack spaces between moldings and glass with glazing compounds and trim excess material with glazing knives.
- Assemble, erect, or dismantle scaffolds, rigging, or hoisting equipment.
- Secure mirrors in position, using mastic cement, putty, bolts, or screws.
- Measure and mark outlines or patterns on glass to indicate cutting lines.
- Grind or polish glass, smoothing edges when necessary.
- Fasten glass panes into wood sashes or frames with clips, points, or moldings, adding weather seals or putty around pane edges to seal joints.
- Score glass with cutters' wheels, breaking off excess glass by hand or with notched tools.
- Cut, assemble, fit, or attach metal-framed glass enclosures for showers, bathtubs, display cases, skylights, solariums, or other structures.
- Prepare glass for cutting by resting it on rack edges or against cutting tables and brushing thin layer of oil along cutting lines or dipping cutting tools in oil.
- Move furniture to clear work sites and cover floors or furnishings with drop cloths.
- Confer with customers to determine project requirements or to provide cost estimates.
- Select the type or color of glass or mirror according to specifications.
- Measure, cut, fit, and press anti-glare adhesive film to glass or spray glass with tinting solution to prevent light glare.
- Create patterns on glass by etching, sandblasting, or painting designs.
- Cut and remove broken glass prior to installing replacement glass.
- Assemble and cement sections of stained glass together.