- Wash polished terrazzo surface, using cleaner and water, and apply sealer and curing agent according to manufacturer's specifications, using brush or sprayer.
Occupations with related tasks Save Table: XLSX CSV
Closely Related Tasks | All Related Tasks | Job Zone | Code | Occupation |
4 | 5 | 2 | 47-2141.00 | Painters, Construction and Maintenance |
4 | 4 | 1 | 47-2051.00 | Cement Masons and Concrete Finishers |
3 | 5 | 2 | 47-2061.00 | Construction Laborers
|
3 | 4 | 2 | 47-2181.00 | Roofers
|
3 | 3 | 2 | 47-3011.00 | Helpers--Brickmasons, Blockmasons, Stonemasons, and Tile and Marble Setters |
3 | 3 | 2 | 47-2142.00 | Paperhangers
|
2 | 4 | 2 | 47-3016.00 | Helpers--Roofers
|
2 | 2 | 2 | 47-2021.00 | Brickmasons and Blockmasons |
2 | 2 | 2 | 47-2082.00 | Tapers |
2 | 2 | 3 | 47-2152.04 | Solar Thermal Installers and Technicians
|
2 | 2 | 2 | 47-2044.00 | Tile and Stone Setters
|
1 | 4 | 2 | 47-4061.00 | Rail-Track Laying and Maintenance Equipment Operators |
1 | 2 | 1 | 47-2043.00 | Floor Sanders and Finishers |
1 | 2 | 1 | 47-3014.00 | Helpers--Painters, Paperhangers, Plasterers, and Stucco Masons |
1 | 2 | 1 | 47-2161.00 | Plasterers and Stucco Masons |
1 | 1 | 2 | 47-2132.00 | Insulation Workers, Mechanical |
1 | 1 | 2 | 47-2131.00 | Insulation Workers, Floor, Ceiling, and Wall |
1 | 1 | 2 | 47-2042.00 | Floor Layers, Except Carpet, Wood, and Hard Tiles
|
1 | 1 | 2 | 47-2081.00 | Drywall and Ceiling Tile Installers |
1 | 1 | 2 | 47-2231.00 | Solar Photovoltaic Installers
|
- Wash and treat surfaces with oil, turpentine, mildew remover, or other preparations, and sand rough spots to ensure that finishes will adhere properly.
- Remove old finishes by stripping, sanding, wire brushing, burning, or using water or abrasive blasting.
- Waterproof buildings, using waterproofers or caulking.
- Spray or brush hot plastics or pitch onto surfaces.
- Apply paint, stain, varnish, enamel, or other finishes to equipment, buildings, bridges, or other structures, using brushes, spray guns, or rollers.
- Fill cracks, holes, or joints with caulk, putty, plaster, or other fillers, using caulking guns or putty knives.
- Cover surfaces with dropcloths or masking tape and paper to protect surfaces during painting.
- Smooth surfaces, using sandpaper, scrapers, brushes, steel wool, or sanding machines.
- Read work orders or receive instructions from supervisors or homeowners to determine work requirements.
- Apply primers or sealers to prepare new surfaces, such as bare wood or metal, for finish coats.
- Erect scaffolding or swing gates, or set up ladders, to work above ground level.
- Mix and match colors of paint, stain, or varnish with oil or thinning and drying additives to obtain desired colors and consistencies.
- Calculate amounts of required materials and estimate costs, based on surface measurements or work orders.
- Polish final coats to specified finishes.
- Select and purchase tools or finishes for surfaces to be covered, considering durability, ease of handling, methods of application, and customers' wishes.
- Remove fixtures such as pictures, door knobs, lamps, or electric switch covers prior to painting.
- Use special finishing techniques such as sponging, ragging, layering, or faux finishing.
- Cut stencils and brush or spray lettering or decorations on surfaces.
- Bake finishes on painted or enameled articles, using baking ovens.
- Wash and treat surfaces with oil, turpentine, mildew remover, or other preparations, and sand rough spots to ensure that finishes will adhere properly.
- Remove old finishes by stripping, sanding, wire brushing, burning, or using water or abrasive blasting.
- Waterproof buildings, using waterproofers or caulking.
- Spray or brush hot plastics or pitch onto surfaces.
- Apply paint, stain, varnish, enamel, or other finishes to equipment, buildings, bridges, or other structures, using brushes, spray guns, or rollers.
- Apply hardening and sealing compounds to cure surface of concrete, and waterproof or restore surface.
- Waterproof or restore concrete surfaces, using appropriate compounds.
- Clean chipped area, using wire brush, and feel and observe surface to determine if it is rough or uneven.
- Apply muriatic acid to clean surface, and rinse with water.
- Check the forms that hold the concrete to see that they are properly constructed.
- Set the forms that hold concrete to the desired pitch and depth, and align them.
- Spread, level, and smooth concrete, using rake, shovel, hand or power trowel, hand or power screed, and float.
- Monitor how the wind, heat, or cold affect the curing of the concrete throughout the entire process.
- Mold expansion joints and edges, using edging tools, jointers, and straightedge.
- Signal truck driver to position truck to facilitate pouring concrete, and move chute to direct concrete on forms.
- Direct the casting of the concrete and supervise laborers who use shovels or special tools to spread it.
- Produce rough concrete surface, using broom.
- Operate power vibrator to compact concrete.
- Install anchor bolts, steel plates, door sills and other fixtures in freshly poured concrete or pattern or stamp the surface to provide a decorative finish.
- Wet surface to prepare for bonding, fill holes and cracks with grout or slurry, and smooth, using trowel.
- Mix cement, sand, and water to produce concrete, grout, or slurry, using hoe, trowel, tamper, scraper, or concrete-mixing machine.
- Chip, scrape, and grind high spots, ridges, and rough projections to finish concrete, using pneumatic chisels, power grinders, or hand tools.
- Cut out damaged areas, drill holes for reinforcing rods, and position reinforcing rods to repair concrete, using power saw and drill.
- Wet concrete surface, and rub with stone to smooth surface and obtain specified finish.
- Build wooden molds, and clamp molds around area to be repaired, using hand tools.
- Sprinkle colored marble or stone chips, powdered steel, or coloring powder over surface to produce prescribed finish.
- Fabricate concrete beams, columns, and panels.
- Polish surface, using polishing or surfacing machine.
- Cut metal division strips, and press them into terrazzo base so that top edges form desired design or pattern.
- Push roller over surface to embed chips in surface.
- Spread roofing paper on surface of foundation, and spread concrete onto roofing paper with trowel to form terrazzo base.
- Apply hardening and sealing compounds to cure surface of concrete, and waterproof or restore surface.
- Waterproof or restore concrete surfaces, using appropriate compounds.
- Clean chipped area, using wire brush, and feel and observe surface to determine if it is rough or uneven.
- Apply muriatic acid to clean surface, and rinse with water.
- Spray materials, such as water, sand, steam, vinyl, paint, or stucco, through hoses to clean, coat, or seal surfaces.
- Mop, brush, or spread paints, cleaning solutions, or other compounds over surfaces to clean them or to provide protection.
- Apply caulking compounds by hand or caulking guns to protect against entry of water or air.
- Lubricate, clean, or repair machinery, equipment, or tools.
- Clean or prepare construction sites to eliminate possible hazards.
- Tend pumps, compressors, or generators to provide power for tools, machinery, or equipment or to heat or move materials, such as asphalt.
- Signal equipment operators to facilitate alignment, movement, or adjustment of machinery, equipment, or materials.
- Read plans, instructions, or specifications to determine work activities.
- Measure, mark, or record openings or distances to layout areas where construction work will be performed.
- Dig ditches or trenches, backfill excavations, or compact and level earth to grade specifications, using picks, shovels, pneumatic tampers, or rakes.
- Load, unload, or identify building materials, machinery, or tools, distributing them to the appropriate locations, according to project plans or specifications.
- Position, join, align, or seal structural components, such as concrete wall sections or pipes.
- Perform site activities required of green certified construction practices, such as implementing waste management procedures, identifying materials for reuse, or installing erosion or sedimentation control mechanisms.
- Control traffic passing near, in, or around work zones.
- Install sewer, water, or storm drain pipes, using pipe-laying machinery or laser guidance equipment.
- Operate or maintain air monitoring or other sampling devices in confined or hazardous environments.
- Smooth or finish freshly poured cement or concrete, using floats, trowels, screeds, or powered cement finishing tools.
- Erect or dismantle scaffolding, shoring, braces, traffic barricades, ramps, or other temporary structures.
- Provide assistance to craft workers, such as carpenters, plasterers, or masons.
- Raze buildings or salvage useful materials.
- Position or dismantle forms for pouring concrete, using saws, hammers, nails, or bolts.
- Grind, scrape, sand, or polish surfaces, such as concrete, marble, terrazzo, or wood flooring, using abrasive tools or machines.
- Place, consolidate, or protect case-in-place concrete or masonry structures.
- Mix ingredients to create compounds for covering or cleaning surfaces.
- Mix, pour, or spread concrete, using portable cement mixers.
- Operate jackhammers or drills to break up concrete or pavement.
- Tend machines that pump concrete, grout, cement, sand, plaster, or stucco through spray guns for application to ceilings or walls.
- Spray materials, such as water, sand, steam, vinyl, paint, or stucco, through hoses to clean, coat, or seal surfaces.
- Mop, brush, or spread paints, cleaning solutions, or other compounds over surfaces to clean them or to provide protection.
- Apply caulking compounds by hand or caulking guns to protect against entry of water or air.
- Lubricate, clean, or repair machinery, equipment, or tools.
- Clean or prepare construction sites to eliminate possible hazards.
- Waterproof or damp-proof walls, floors, roofs, foundations, or basements by painting or spraying surfaces with waterproof coatings or by attaching waterproofing membranes to surfaces.
- Cover exposed nailheads with roofing cement or caulking to prevent water leakage or rust.
- Spray roofs, sidings, or walls to bind, seal, insulate, or soundproof sections of structures, using spray guns, air compressors, or heaters.
- Apply reflective roof coatings, such as special paints or single-ply roofing sheets, to existing roofs to reduce solar heat absorption.
- Inspect problem roofs to determine the best repair procedures.
- Remove snow, water, or debris from roofs prior to applying roofing materials.
- Set up scaffolding to provide safe access to roofs.
- Estimate materials and labor required to complete roofing jobs.
- Cement or nail flashing strips of metal or shingle over joints to make them watertight.
- Install partially overlapping layers of material over roof insulation surfaces, using chalk lines, gauges on shingling hatchets, or lines on shingles.
- Cut felt, shingles, or strips of flashing to fit angles formed by walls, vents, or intersecting roof surfaces.
- Apply plastic coatings, membranes, fiberglass, or felt over sloped roofs before applying shingles.
- Install, repair, or replace single-ply roofing systems, using waterproof sheet materials such as modified plastics, elastomeric, or other asphaltic compositions.
- Attach roofing paper to roofs in overlapping strips to form bases for other materials.
- Cover roofs or exterior walls of structures with slate, asphalt, aluminum, wood, gravel, gypsum, or related materials, using brushes, knives, punches, hammers, or other tools.
- Apply alternate layers of hot asphalt or tar and roofing paper to roofs.
- Install vapor barriers or layers of insulation on flat roofs.
- Smooth rough spots to prepare surfaces for waterproofing, using hammers, chisels, or rubbing bricks.
- Glaze top layers to make a smooth finish or embed gravel in the bitumen for rough surfaces.
- Mop or pour hot asphalt or tar onto roof bases.
- Install attic ventilation systems, such as turbine vents, gable or ridge vents, or conventional or solar-powered exhaust fans.
- Install skylights on roofs to increase natural light inside structures or to reduce energy costs.
- Apply gravel or pebbles over top layers of roofs, using rakes or stiff-bristled brooms.
- Attach solar panels to existing roofs, according to specifications and without damaging roofing materials or the structural integrity of buildings.
- Punch holes in slate, tile, terra cotta, or wooden shingles, using punches and hammers.
- Apply modular soil- and plant-containing grids over existing roof membranes to create green roofs.
- Install layers of vegetation-based green roofs, including protective membranes, drainage, aeration, water retention and filter layers, soil substrates, irrigation materials, and plants.
- Waterproof or damp-proof walls, floors, roofs, foundations, or basements by painting or spraying surfaces with waterproof coatings or by attaching waterproofing membranes to surfaces.
- Cover exposed nailheads with roofing cement or caulking to prevent water leakage or rust.
- Spray roofs, sidings, or walls to bind, seal, insulate, or soundproof sections of structures, using spray guns, air compressors, or heaters.
- Apply reflective roof coatings, such as special paints or single-ply roofing sheets, to existing roofs to reduce solar heat absorption.
- Clean installation surfaces, equipment, tools, work sites, or storage areas, using water, chemical solutions, oxygen lances, or polishing machines.
- Apply caulk, sealants, or other agents to installed surfaces.
- Remove damaged tile, brick, or mortar, and clean or prepare surfaces, using pliers, hammers, chisels, drills, wire brushes, or metal wire anchors.
- Mix mortar, plaster, and grout, manually or using machines, according to standard formulas.
- Erect scaffolding or other installation structures.
- Cut materials to specified sizes for installation, using power saws or tile cutters.
- Modify material moving, mixing, grouting, grinding, polishing, or cleaning procedures, according to installation or material requirements.
- Transport materials, tools, or machines to installation sites, manually or using conveyance equipment.
- Provide assistance in the preparation, installation, repair, or rebuilding of tile, brick, or stone surfaces.
- Locate and supply materials to masons for installation, following drawings or numbered sequences.
- Arrange or store materials, machines, tools, or equipment.
- Move or position materials such as marble slabs, using cranes, hoists, or dollies.
- Remove excess grout or residue from tile or brick joints, using sponges or trowels.
- Apply grout between joints of bricks or tiles, using grouting trowels.
- Correct surface imperfections or fill chipped, cracked, or broken bricks or tiles, using fillers, adhesives, or grouting materials.
- Clean installation surfaces, equipment, tools, work sites, or storage areas, using water, chemical solutions, oxygen lances, or polishing machines.
- Apply caulk, sealants, or other agents to installed surfaces.
- Remove damaged tile, brick, or mortar, and clean or prepare surfaces, using pliers, hammers, chisels, drills, wire brushes, or metal wire anchors.
- Apply thinned glue to waterproof porous surfaces, using brushes, rollers, or pasting machines.
- Remove paint, varnish, dirt, and grease from surfaces, using paint remover and water soda solutions.
- Apply acetic acid to damp plaster to prevent lime from bleeding through paper.
- Smooth strips or sections of paper with brushes or rollers to remove wrinkles and bubbles and to smooth joints.
- Trim rough edges from strips, using straightedges and trimming knives.
- Trim excess material at ceilings or baseboards, using knives.
- Check finished wallcoverings for proper alignment, pattern matching, and neatness of seams.
- Mark vertical guidelines on walls to align strips, using plumb bobs and chalk lines.
- Cover interior walls and ceilings of rooms with decorative wallpaper or fabric, using hand tools.
- Apply adhesives to the backs of paper strips, using brushes, or dunk strips of prepasted wallcovering in water, wiping off any excess adhesive.
- Measure and cut strips from rolls of wallpaper or fabric, using shears or razors.
- Place strips or sections of paper on surfaces, aligning section edges and patterns.
- Fill holes, cracks, and other surface imperfections preparatory to covering surfaces.
- Measure surfaces or review work orders to estimate the quantities of materials needed.
- Apply sizing to seal surfaces and maximize adhesion of coverings to surfaces.
- Smooth rough spots on walls and ceilings, using sandpaper.
- Set up equipment, such as pasteboards and scaffolds.
- Remove old paper, using water, steam machines, or solvents and scrapers.
- Mix paste, using paste powder and water, and brush paste onto surfaces.
- Staple or tack advertising posters onto fences, walls, billboards, or poles.
- Apply thinned glue to waterproof porous surfaces, using brushes, rollers, or pasting machines.
- Remove paint, varnish, dirt, and grease from surfaces, using paint remover and water soda solutions.
- Apply acetic acid to damp plaster to prevent lime from bleeding through paper.
- Sweep and clean roofs to prepare them for the application of new roofing materials.
- Place tiles, nail them to roof boards, and cover nailheads with roofing cement.
- Clean work areas and equipment.
- Clear drains and downspouts and clean gutters.
- Check to ensure that completed roofs are watertight.
- Locate worn or torn areas in roofs.
- Maintain tools and equipment.
- Cover roofs with layers of roofing felt or asphalt strips before installing tile, slate, or composition materials.
- Remove old roofing materials.
- Unload materials and tools from work trucks, and unroll roofing as directed.
- Set ladders, scaffolds, and hoists in place for taking supplies to roofs.
- Provide assistance to skilled roofers installing and repairing roofs, flashings, and surfaces.
- Attach roofing paper and composition shingles, using nails.
- Perform emergency leak repairs and general maintenance for a variety of roof types.
- Attach sheets of metal to roof boards or building frameworks when installing metal roofs.
- Hoist tar and roofing materials to roofs, using ropes and pulleys, or carry materials up ladders.
- Apply shingles, gravel, or asphalt over the top layer of tar to protect the roofing material.
- Chop tar into small pieces, and heat chopped tar in kettles.
- Sweep and clean roofs to prepare them for the application of new roofing materials.
- Place tiles, nail them to roof boards, and cover nailheads with roofing cement.
- Clean work areas and equipment.
- Clear drains and downspouts and clean gutters.
- Clean working surface to remove scale, dust, soot, or chips of brick and mortar, using broom, wire brush, or scraper.
- Spray or spread refractory material over brickwork to protect against deterioration.
- Measure distance from reference points and mark guidelines to lay out work, using plumb bobs and levels.
- Construct corners by fastening in plumb position a corner pole or building a corner pyramid of bricks, and filling in between the corners using a line from corner to corner to guide each course, or layer, of brick.
- Apply and smooth mortar or other mixture over work surface.
- Calculate angles and courses and determine vertical and horizontal alignment of courses.
- Break or cut bricks, tiles, or blocks to size, using trowel edge, hammer, or power saw.
- Interpret blueprints and drawings to determine specifications and to calculate the materials required.
- Remove excess mortar with trowels and hand tools, and finish mortar joints with jointing tools, for a sealed, uniform appearance.
- Fasten or fuse brick or other building material to structure with wire clamps, anchor holes, torch, or cement.
- Examine brickwork or structure to determine need for repair.
- Mix specified amounts of sand, clay, dirt, or mortar powder with water to form refractory mixtures.
- Remove burned or damaged brick or mortar, using sledgehammer, crowbar, chipping gun, or chisel.
- Lay and align bricks, blocks, or tiles to build or repair structures or high temperature equipment, such as cupola, kilns, ovens, or furnaces.
- Clean working surface to remove scale, dust, soot, or chips of brick and mortar, using broom, wire brush, or scraper.
- Spray or spread refractory material over brickwork to protect against deterioration.
- Spread sealing compound between boards or panels or over cracks, holes, nail heads, or screw heads, using trowels, broadknives, or spatulas.
- Press paper tape over joints to embed tape into sealing compound and to seal joints.
- Apply additional coats to fill in holes and make surfaces smooth.
- Seal joints between plasterboard or other wallboard to prepare wall surfaces for painting or papering.
- Spread and smooth cementing material over tape, using trowels or floating machines to blend joints with wall surfaces.
- Sand or patch nicks or cracks in plasterboard or wallboard.
- Mix sealing compounds by hand or with portable electric mixers.
- Work on high ceilings, using scaffolding or other tools, such as stilts.
- Select the correct sealing compound or tape.
- Countersink nails or screws below surfaces of walls before applying sealing compounds, using hammers or screwdrivers.
- Remove extra compound after surfaces have been covered sufficiently.
- Install metal molding at wall corners to secure wallboard.
- Apply texturizing compounds or primers to walls or ceilings before final finishing, using trowels, brushes, rollers, or spray guns.
- Check adhesives to ensure that they will work and will remain durable.
- Sand rough spots of dried cement between applications of compounds.
- Use mechanical applicators that spread compounds and embed tape in one operation.
- Spread sealing compound between boards or panels or over cracks, holes, nail heads, or screw heads, using trowels, broadknives, or spatulas.
- Press paper tape over joints to embed tape into sealing compound and to seal joints.
- Apply weather seal, such as pipe flashings and sealants, to roof penetrations and structural devices.
- Apply ultraviolet radiation protection to prevent degradation of plumbing.
- Test operation or functionality of mechanical, plumbing, electrical, and control systems.
- Install solar collector mounting devices on tile, asphalt, shingle, or built-up gravel roofs, using appropriate materials and penetration methods.
- Install copper or plastic plumbing using pipes, fittings, pipe cutters, acetylene torches, solder, wire brushes, sand cloths, flux, plastic pipe cleaners, or plastic glue.
- Identify plumbing, electrical, environmental, or safety hazards associated with solar thermal installations.
- Demonstrate start-up, shut-down, maintenance, diagnostic, and safety procedures to thermal system owners.
- Install circulating pumps using pipe, fittings, soldering equipment, electrical supplies, and hand tools.
- Install flat-plat, evacuated glass, or concentrating solar collectors on mounting devices, using brackets or struts.
- Install solar thermal system controllers and sensors.
- Fill water tanks and check tanks, pipes, and fittings for leaks.
- Design active direct or indirect, passive direct or indirect, or pool solar systems.
- Determine locations for installing solar subsystem components, including piping, water heaters, valves, and ancillary equipment.
- Perform routine maintenance or repairs to restore solar thermal systems to baseline operating conditions.
- Install heat exchangers and heat exchanger fluids according to installation manuals and schematics.
- Apply operation or identification tags or labels to system components, as required.
- Connect water heaters and storage tanks to power and water sources.
- Cut, miter, and glue piping insulation to insulate plumbing pipes and fittings.
- Install plumbing, such as dip tubes, port fittings, drain tank valves, pressure temperature relief valves, or tanks, according to manufacturer specifications and building codes.
- Install monitoring system components, such as flow meters, temperature gauges, and pressure gauges, according to system design and manufacturer specifications.
- Assess collector sites to ensure structural integrity of potential mounting surfaces or the best orientation and tilt for solar collectors.
- Apply weather seal, such as pipe flashings and sealants, to roof penetrations and structural devices.
- Apply ultraviolet radiation protection to prevent degradation of plumbing.
- Apply a sealer to make grout stain- and water-resistant.
- Remove any old tile, grout and adhesive using chisels and scrapers and clean the surface carefully.
- Align and straighten tile using levels, squares, and straightedges.
- Finish and dress the joints and wipe excess grout from between tiles, using damp sponge.
- Cut and shape tile to fit around obstacles and into odd spaces and corners, using hand and power cutting tools.
- Determine and implement the best layout to achieve a desired pattern.
- Mix, apply, and spread plaster, concrete, mortar, cement, mastic, glue or other adhesives to form a bed for the tiles, using brush, trowel and screed.
- Study blueprints and examine surface to be covered to determine amount of material needed.
- Measure and mark surfaces to be tiled, following blueprints.
- Lay and set mosaic tiles to create decorative wall, mural, and floor designs.
- Apply mortar to tile back, position the tile, and press or tap with trowel handle to affix tile to base.
- Mix and apply mortar or cement to edges and ends of drain tiles to seal halves and joints.
- Level concrete and allow to dry.
- Measure and cut metal lath to size for walls and ceilings, using tin snips.
- Install and anchor fixtures in designated positions, using hand tools.
- Prepare surfaces for tiling by attaching lath or waterproof paper, or by applying a cement mortar coat to a metal screen.
- Remove and replace cracked or damaged tile.
- Cut tile backing to required size, using shears.
- Cut, surface, polish, and install marble and granite or install pre-cast terrazzo, granite or marble units.
- Spread mastic or other adhesive base on roof deck to form base for promenade tile, using serrated spreader.
- Assist customers in selection of tile and grout.
- Prepare cost and labor estimates, based on calculations of time and materials needed for project.
- Brush glue onto manila paper on which design has been drawn and position tiles, finished side down, onto paper.
- Select and order tile and other items to be installed, such as bathroom accessories, walls, panels, and cabinets, according to specifications.
- Build underbeds and install anchor bolts, wires, and brackets.
- Apply a sealer to make grout stain- and water-resistant.
- Remove any old tile, grout and adhesive using chisels and scrapers and clean the surface carefully.
- Spray ties, fishplates, or joints with oil to protect them from weathering.
- Clean tracks or clear ice or snow from tracks or switch boxes.
- Clean or make minor repairs to machines or equipment.
- Paint railroad signs, such as speed limits or gate-crossing warnings.
- Patrol assigned track sections so that damaged or broken track can be located and reported.
- Repair or adjust track switches, using wrenches and replacement parts.
- Weld sections of track together, such as switch points and frogs.
- Observe leveling indicator arms to verify levelness and alignment of tracks.
- Operate single- or multiple-head spike driving machines to drive spikes into ties and secure rails.
- Operate track wrenches to tighten or loosen bolts at joints that hold ends of rails together.
- Cut rails to specified lengths, using rail saws.
- Lubricate machines, change oil, or fill hydraulic reservoirs to specified levels.
- Drill holes through rails, tie plates, or fishplates for insertion of bolts or spikes, using power drills.
- Clean, grade, or level ballast on railroad tracks.
- Raise rails, using hydraulic jacks, to allow for tie removal and replacement.
- Adjust controls of machines that spread, shape, raise, level, or align track, according to specifications.
- Dress and reshape worn or damaged railroad switch points or frogs, using portable power grinders.
- Grind ends of new or worn rails to attain smooth joints, using portable grinders.
- Operate single- or multiple-head spike pullers to pull old spikes from ties.
- String and attach wire-guidelines machine to rails so that tracks or rails can be aligned or leveled.
- Engage mechanisms that lay tracks or rails to specified gauges.
- Drive graders, tamping machines, brooms, or ballast spreading machines to redistribute gravel or ballast between rails.
- Drive vehicles that automatically move and lay tracks or rails over sections of track to be constructed, repaired, or maintained.
- Turn wheels of machines, using lever controls, to adjust guidelines for track alignments or grades, following specifications.
- Push controls to close grasping devices on track or rail sections so that they can be raised or moved.
- Operate tie-adzing machines to cut ties and permit insertion of fishplates that hold rails.
- Spray ties, fishplates, or joints with oil to protect them from weathering.
- Clean tracks or clear ice or snow from tracks or switch boxes.
- Clean or make minor repairs to machines or equipment.
- Paint railroad signs, such as speed limits or gate-crossing warnings.
- Apply filler compound and coats of finish to floors to seal wood.
- Buff and vacuum floors to ensure their cleanliness prior to the application of finish.
- Scrape and sand floor edges and areas inaccessible to floor sanders, using scrapers, disk-type sanders, and sandpaper.
- Inspect floors for smoothness.
- Attach sandpaper to rollers of sanding machines.
- Guide sanding machines over surfaces of floors until surfaces are smooth.
- Remove excess glue from joints, using knives, scrapers, or wood chisels.
- Apply filler compound and coats of finish to floors to seal wood.
- Buff and vacuum floors to ensure their cleanliness prior to the application of finish.
- Place articles to be stripped into stripping tanks.
- Clean work areas and equipment.
- Perform support duties to assist painters, paperhangers, plasterers, or masons.
- Apply protective coverings, such as masking tape, to articles or areas that could be damaged or stained by work processes.
- Erect scaffolding.
- Fill cracks or breaks in surfaces of plaster articles or areas with putty or epoxy compounds.
- Supply or hold tools and materials.
- Smooth surfaces of articles to be painted, using sanding and buffing tools and equipment.
- Mix plaster, and carry plaster to plasterers.
- Remove articles such as cabinets, metal furniture, and paint containers from stripping tanks after prescribed periods of time.
- Pour specified amounts of chemical solutions into stripping tanks.
- Place articles to be stripped into stripping tanks.
- Clean work areas and equipment.
- Clean and prepare surfaces for applications of plaster, cement, stucco, or similar materials, such as by drywall taping.
- Cover surfaces such as windows, doors, or sidewalks to protect from splashing.
- Mix mortar and plaster to desired consistency or direct workers who perform mixing.
- Apply coats of plaster or stucco to walls, ceilings, or partitions of buildings, using trowels, brushes, or spray guns.
- Set up scaffolds.
- Determine materials needed to complete the job and place orders accordingly.
- Apply weatherproof, decorative coverings to exterior surfaces of buildings, such as by troweling or spraying on coats of stucco.
- Create decorative textures in finish coat, using brushes or trowels, sand, pebbles, or stones.
- Apply insulation to building exteriors by installing prefabricated insulation systems over existing walls or by covering the outer wall with insulation board, reinforcing mesh, and a base coat.
- Rough the undercoat surface with a scratcher so the finish coat will adhere.
- Cure freshly plastered surfaces.
- Install guide wires on exterior surfaces of buildings to indicate thickness of plaster or stucco and nail wire mesh, lath, or similar materials to the outside surface to hold stucco in place.
- Spray acoustic materials or texture finish over walls or ceilings.
- Mold or install ornamental plaster pieces, panels, or trim.
- Clean and prepare surfaces for applications of plaster, cement, stucco, or similar materials, such as by drywall taping.
- Clean job sites.
- Cover, seal, or finish insulated surfaces or access holes with plastic covers, canvas strips, sealants, tape, cement, or asphalt mastic.
- Measure and cut insulation for covering surfaces, using tape measures, handsaws, knives, and scissors.
- Apply, remove, and repair insulation on industrial equipment, pipes, ductwork, or other mechanical systems such as heat exchangers, tanks, and vessels, to help control noise and maintain temperatures.
- Select appropriate insulation, such as fiberglass, Styrofoam, or cork, based on the heat retaining or excluding characteristics of the material.
- Fit insulation around obstructions, and shape insulating materials and protective coverings as required.
- Determine the amounts and types of insulation needed, and methods of installation, based on factors such as location, surface shape, and equipment use.
- Install sheet metal around insulated pipes with screws to protect the insulation from weather conditions or physical damage.
- Read blueprints and specifications to determine job requirements.
- Prepare surfaces for insulation application by brushing or spreading on adhesives, cement, or asphalt, or by attaching metal pins to surfaces.
- Cover, seal, or finish insulated surfaces or access holes with plastic covers, canvas strips, sealants, tape, cement, or asphalt mastic.
- Cover, seal, or finish insulated surfaces or access holes with plastic covers, canvas strips, sealants, tape, cement or asphalt mastic.
- Measure and cut insulation for covering surfaces, using tape measures, handsaws, power saws, knives, or scissors.
- Fit, wrap, staple, or glue insulating materials to structures or surfaces, using hand tools or wires.
- Cover and line structures with blown or rolled forms of materials to insulate against cold, heat, or moisture, using saws, knives, rasps, trowels, blowers, or other tools and implements.
- Distribute insulating materials evenly into small spaces within floors, ceilings, or walls, using blowers and hose attachments, or cement mortars.
- Move controls, buttons, or levers to start blowers and regulate flow of materials through nozzles.
- Fill blower hoppers with insulating materials.
- Read blueprints, and select appropriate insulation, based on space characteristics and the heat retaining or excluding characteristics of the material.
- Remove old insulation, such as asbestos, following safety procedures.
- Prepare surfaces for insulation application by brushing or spreading on adhesives, cement, or asphalt, or by attaching metal pins to surfaces.
- Cover, seal, or finish insulated surfaces or access holes with plastic covers, canvas strips, sealants, tape, cement or asphalt mastic.
- Sweep, scrape, sand, or chip dirt and irregularities to clean base surfaces, correcting imperfections that may show through the covering.
- Cut flooring material to fit around obstructions.
- Inspect surface to be covered to ensure that it is firm and dry.
- Trim excess covering materials, tack edges, and join sections of covering material to form tight joint.
- Form a smooth foundation by stapling plywood or Masonite over the floor or by brushing waterproof compound onto surface and filling cracks with plaster, putty, or grout to seal pores.
- Measure and mark guidelines on surfaces or foundations, using chalk lines and dividers.
- Cut covering and foundation materials, according to blueprints and sketches.
- Roll and press sheet wall and floor covering into cement base to smooth and finish surface, using hand roller.
- Apply adhesive cement to floor or wall material to join and adhere foundation material.
- Determine traffic areas and decide location of seams.
- Lay out, position, and apply shock-absorbing, sound-deadening, or decorative coverings to floors, walls, and cabinets, following guidelines to keep courses straight and create designs.
- Remove excess cement to clean finished surface.
- Disconnect and remove appliances, light fixtures, and worn floor and wall covering from floors, walls, and cabinets.
- Heat and soften floor covering materials to patch cracks or fit floor coverings around irregular surfaces, using blowtorch.
- Sweep, scrape, sand, or chip dirt and irregularities to clean base surfaces, correcting imperfections that may show through the covering.
- Wash concrete surfaces before mounting tile to increase adhesive qualities of surfaces, using washing soda and zinc sulfate solution.
- Read blueprints or other specifications to determine methods of installation, work procedures, or material or tool requirements.
- Measure and mark surfaces to lay out work, according to blueprints or drawings, using tape measures, straightedges or squares, and marking devices.
- Fit and fasten wallboard or drywall into position on wood or metal frameworks, using glue, nails, or screws.
- Measure and cut openings in panels or tiles for electrical outlets, windows, vents, plumbing, or other fixtures, using keyhole saws or other cutting tools.
- Assemble or install metal framing or decorative trim for windows, doorways, or vents.
- Cut metal or wood framing and trim to size, using cutting tools.
- Inspect furrings, mechanical mountings, or masonry surfaces for plumbness and level, using spirit or water levels.
- Cut fixture or border tiles to size, using keyhole saws, and insert them into surrounding frameworks.
- Cut and screw together metal channels to make floor or ceiling frames, according to plans for the location of rooms or hallways.
- Hang drywall panels on metal frameworks of walls and ceilings in offices, schools, or other large buildings, using lifts or hoists to adjust panel heights, when necessary.
- Trim rough edges from wallboard to maintain even joints, using knives.
- Suspend angle iron grids or channel irons from ceilings, using wire.
- Coordinate work with drywall finishers who cover the seams between drywall panels.
- Install horizontal and vertical metal or wooden studs to frames so that wallboard can be attached to interior walls.
- Scribe and cut edges of tile to fit walls where wall molding is not specified.
- Hang dry lines to wall moldings to guide positioning of main runners.
- Fasten metal or rockboard lath to the structural framework of walls, ceilings, or partitions of buildings, using nails, screws, staples, or wire-ties.
- Install blanket insulation between studs and tack plastic moisture barriers over insulation.
- Seal joints between ceiling tiles and walls.
- Remove existing plaster, drywall, or paneling, using crowbars and hammers.
- Apply or mount acoustical tile or blocks, strips, or sheets of shock-absorbing materials to ceilings or walls of buildings to reduce reflection of sound or to decorate rooms.
- Mount tile, using adhesives, or by nailing, screwing, stapling, or wire-tying lath directly to structural frameworks.
- Nail channels or wood furring strips to surfaces to provide mounting for tile.
- Install metal lath where plaster applications will be exposed to weather or water, or for curved or irregular surfaces.
- Apply cement to backs of tiles and press tiles into place, aligning them with layout marks or joints of previously laid tile.
- Wash concrete surfaces before mounting tile to increase adhesive qualities of surfaces, using washing soda and zinc sulfate solution.
- Apply weather sealing to array, building, or support mechanisms.
- Install photovoltaic (PV) systems in accordance with codes and standards, using drawings, schematics, and instructions.
- Check electrical installation for proper wiring, polarity, grounding, or integrity of terminations.
- Identify electrical, environmental, and safety hazards associated with photovoltaic (PV) installations.
- Identify installation locations with proper orientation, area, solar access, or structural integrity for photovoltaic (PV) arrays.
- Assemble solar modules, panels, or support structures, as specified.
- Install module array interconnect wiring, implementing measures to disable arrays during installation.
- Install required labels on solar system components and hardware.
- Diagram layouts and locations for photovoltaic (PV) arrays and equipment, including existing building or site features.
- Determine materials, equipment, and installation sequences necessary to maximize installation efficiency.
- Test operating voltages to ensure operation within acceptable limits for power conditioning equipment, such as inverters and controllers.
- Determine appropriate sizes, ratings, and locations for all system overcurrent devices, disconnect devices, grounding equipment, and surge suppression equipment.
- Activate photovoltaic (PV) systems to verify system functionality and conformity to performance expectations.
- Identify and resolve any deficiencies in photovoltaic (PV) system installation or materials.
- Visually inspect and test photovoltaic (PV) modules or systems.
- Examine designs to determine current requirements for all parts of the photovoltaic (PV) system electrical circuit.
- Demonstrate system functionality and performance, including start-up, shut-down, normal operation, and emergency or bypass operations.
- Identify methods for laying out, orienting, and mounting modules or arrays to ensure efficient installation, electrical configuration, or system maintenance.
- Measure and analyze system performance and operating parameters to assess operating condition of systems or equipment.
- Program, adjust, or configure inverters and controls for desired set points and operating modes.
- Determine connection interfaces for additional subpanels or for connecting photovoltaic (PV) systems with utility services or other power generation sources.
- Determine photovoltaic (PV) system designs or configurations based on factors such as customer needs, expectations, and site conditions.
- Select mechanical designs, installation equipment, or installation plans that conform to environmental, architectural, structural, site, and code requirements.
- Perform routine photovoltaic (PV) system maintenance on modules, arrays, batteries, power conditioning equipment, safety systems, structural systems, weather sealing, or balance of systems equipment.
- Compile or maintain records of system operation, performance, and maintenance.
- Install active solar systems, including solar collectors, concentrators, pumps, or fans.
- Apply weather sealing to array, building, or support mechanisms.